Search NASA⌕ Search

Engineering topics

Krejcik, P

Publications and source records attributed to Krejcik, P.

The LCLS Timing Event System

The Linac Coherent Light Source requires precision timing trigger signals for various accelerator diagnostics and controls at SLAC-NAL. A new timing system has been developed that meets these requirements. This system is based on COTS hardware with a mixture of custom-designed units. An added challenge has been the requirement that the LCLS Timing System must co-exist and 'know' about the existing SLC Timing System. This paper describes the architecture, construction and performance of the LCLS timing event system.

43 PARTICLE ACCELERATORS↗

PEP-II Status and Outlook

PEP-II/BABAR are presently in their second physics run. With machine and detector performance and reliability at an all-time high, almost 51 fb{sup -1} have been integrated by BABAR up to mid-October 2001. PEP-II luminosity has reached 4.4 x 10{sup 33} cm{sup -2} s{sup -1} and our highest monthly delivered luminosity has been above 6 pb{sup -1}, exceeding the performance parameters given in the PEP-II CDR by almost 50%. The increase compared to the first run in 2000 has been achieved by a combination of beam-current increase and beam-size decrease. In this paper we will summarize the PEP-II performance and the present limitations as well as our plans to further increase machine performance.

99 GENERAL AND MISCELLANEOUS↗

Beam-based Feedback for the Linac Coherent Light Source

Beam-based feedback control loops are required by the Linac Coherent Light Source (LCLS) program in order to provide fast, single-pulse stabilization of beam parameters. Eight transverse feedback loops, a 6 x 6 longitudinal feedback loop, and a loop to maintain the electron bunch charge were successfully prototyped in MATLAB for the LCLS, and have been maintaining stability of the LCLS electron beam at beam rates up to 30Hz. In the final commissioning phase of LCLS the beam will be operating at up to 120Hz. In order to run the feedback loops at beam rate, the feedback loops will be implemented in EPICS IOCs with a dedicated ethernet multi-cast network. This paper will discuss the design of the beam-based Fast Feedback System for LCLS. Topics include MATLAB feedback prototyping, algorithm for 120Hz feedback, network design for fast data transport, actuator and sensor design for single-pulse control and sensor readback, and feedback configuration and runtime control.

43 PARTICLE ACCELERATORS↗