Search NASASearch

Engineering topics

Kruizinga, Gerhard

Publications and source records attributed to Kruizinga, Gerhard.

At least 19 records

Planetary Protection Requirements and Aimpoint Biasing for Mars 2020 Mission

The Mars 2020 mission was launched from Cape Canaveral, Florida on July 30, 2020, and landed at Mars Jezero Crater on February 18, 2021. Throughout the 7-month interplanetary trajectory, there were various requirements and constraints the navigation team had to observe. Particularly pertinent to trajectory control and maneuver design were the planetary protection requirements for preventing microbial contamination of Mars. Consequently, the aimpoints for injection and early TCMs were biased away to reduce the probability of unintended Mars impact, thus satisfying these requirements. In addition, extensive pre-launch analyses were done to ensure other requirements could be met with high probabilities.

Kruizinga, Gerhard

On-Orbit Contingency Plan for the Mars 2020 Mission

NASA’s Mars 2020 mission successfully launched to Mars July 30, 2020. An on-orbit contingency plan was developed to accomplish a controlled re-entry of the spacecraft in the event of a launch vehicle anomaly. The entire launch period was assessed, and satisfactory de-orbit burns were designed for every launch opportunity. An operational implementation was created for rapid adoption if needed, and validated using information from the Gravity Recovery and Climate Experiment (GRACE) satellites. This paper presents the orbit determination models and filter strategies used to conduct the pre-launch analyses, as well as the operational implementation validation methodologies and results.

Kruizinga, Gerhard

Mars 2020 Radiometric Data and Telemetry Processing, Attitude Estimation, and Thruster Calibration for Orbit Determination

The Mars 2020 spacecraft was spin-stabilized during cruise, just like its predecessor, the Mars Science Laboratory. This spinning motion imparts a signature in the radiometric tracking data that must be dealt with in order to properly model the motion of the spacecraft's center of mass. We discuss how the Orbit Determination team pre-processed the data for efficient computations while also providing other benefits such as high-fidelity attitude modeling and on-board clock verification. Finally, we discuss the analysis and results of the in-flight thruster calibration activity.

Seubert, Jill

Maneuver Design Implementation and Verification for the Mars 2020 Mission

On February 18, 2021, the Perseverance rover landed in Jezero Crater on Mars, transported by the Mars 2020 spacecraft on a nearly seven-month journey to the Red Planet. The execution of three propulsive maneuvers during the interplanetary cruise phase was required to remove the launch-injection bias and deliver the spacecraft to the Mars atmospheric entry point. This paper focuses on the maneuver implementation and verification process between the navigation and spacecraft teams. Additionally, this paper discusses the execution error models that were used to determine maneuver performance and delivery accuracy at the atmospheric entry interface point.

Kruizinga, Gerhard

Mars 2020 Trajectory Correction Maneuver Design

The Mars 2020 mission launched on 30 July 2020 and arrived at Mars on 18 February 2021. Delivering the mission’s Perseverance rover to Jezero Crater required adjusting the postlaunch trajectory to remove the launch injection bias and to target the atmospheric entry conditions, while also satisfying requirements on the propellant usage and non-nominal impact probability at Mars. The Mars 2020 maneuver design team achieved these goals by designing and executing three propulsive maneuvers in flight. The accurate on-board execution of those maneuvers delivered the spacecraft into the Martian atmosphere in a state that allowed for a successful entry, descent, and landing on the surface. This paper details the maneuver design process and describes the design and execution of the three in-flight propulsive maneuvers.

Kruizinga, Gerhard

Mars 2020 Navigation Performance

On February 18, 2021, the Perseverance rover and Ingenuity helicopter demonstration landed at Jezero Crater. The Entry, Descent, and Landing (EDL) architecture, largely the same used to land Curiosity at Gale Crater on August 6, 2012, required high-fidelity flight dynamics simulation with two independent tools to verify performance. The process for creating the EDL simulation using the Dynamics Simulator for Entry, Descent and Surface landing (DSENDS) tool will be discussed, along with its use for for independent verification of the EDL statistical analysis results and reference trajectory simulation. Analysis and usage details both in development and cruise, along with post-landing assessment of the prediction performance of the simulation, will also be discussed.

Wagner, Sean

Orbit Determination for the Mars 2020 Mission

NASA’s Mars 2020 Mission successfully executed its Martian entry, descent, and landing sequence on February 18, 2021. Spacecraft navigation guided the spacecraft from its launch injection to entry into the Martian atmosphere; to do so, three trajectory correction maneuvers and two onboard state updates were performed. Navigation was required to provide an entry state with a maximum uncertainty of 2.8 km in position and 2.0 m/sec in velocity (3-σ); the flight performance was approximately 900 m and 66 cm/sec (3-σ). This paper presents the orbit determination models, measurements, filter strategies and performance throughout launch, cruise and Mars approach.

Wong, Mau

Independent Navigation Team Contribution to New Horizons' Pluto System Flyby

The New Horizons spacecraft made it closest approach to Pluto on 14 July 2015. The most significant challenge of this mission was that the Pluto system ephemeris was initially known with a precision of ~1000 km. This needed to be improved significantly on approach in order to meet the science requirements. During the final six months leading to the flyby, a JPL Independent Navigation (INAV) Team was included in the ephemeris knowledge update process as a cross-check on the Project Navigation (PNAV) Team's results. This paper discusses the INAV team's experiences and challenges navigating New Horizons through the Pluto planetary system encounter.

orbit determination

A Journey with MOM

In late 2013, the Indian Space Research Organization (ISRO) launched its "Mars Orbiter Mission" (MOM). ISRO engaged NASA's Jet Propulsion Laboratory (JPL) for navigation services to support ISRO's objectives of MOM achieving and maintaining Mars orbit. The navigation support included planning, documentation, testing, orbit determination, maneuver design /analysis, and tracking data analysis. Several of MOM's attributes had an impact on navigation processes, e.g., S -band telecommunications, Earth Orbit Phase maneuvers, and frequent angular momentum desaturation s (AMDs). The primary source of tracking data was NASA/ JPL's Deep Space Network (DSN); JPL also conducted a performance assessment of Indian Deep Space Network (IDSN) tracking data. Planning for the Mars Orbit Insertion (MOI) was complicated by a pressure regulator failure that created uncertainty regarding MOM's main engine and raised potential planetary protection issues. A successful main engine test late on approach resolved these issues; it was quickly followed by a successful MOI on 24-September - 2014 at 02:00 UTC. Less than a month later, Comet Siding Spring's Mars flyby necessitated plans to minimize potential spacecraft damage. At the time of this writing, MOM's orbital operations continue, and plans to extend JPL 's support are in progress. This paper covers the JPL 's support of MOM through the Comet Siding Spring event.

Mars orbiter