Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

LCSL-II Cryomodule Testing at Fermilab

Cold powered testing of all LCLS-II production cryomodules at Fermilab is complete as of February 2021. A total of twenty-five tests on both 1.3 GHz and 3.9 GHz cryomodules were conducted over a nearly five year time span beginning in the summer of 2016. During the course of this campaign cutting-edge results for cavity Q₀ and gradient in continuous wave operation were achieved. A summary of all test results will be presented, with a comparison to established acceptance criteria, as well as overall test stand statistics and lessons learned.

43 PARTICLE ACCELERATORS↗