Search NASA⌕ Search

Engineering topics

Kuiper, J A

Publications and source records attributed to Kuiper, J A.

Placing power linres : GIS helps site energy corridors.

Turn the lights on when you enter a room, then turn the lights off when you leave. Most of us repeat this sequence many times each day, and never give it another thought. But that seemingly simple light switch on the wall connects us to one of the most complex systems in the world: the electrical grid. Most of the United States is served by a highly reliable and adequate supply of electrical power, which is distributed through a grid of thousands of miles of electricity-transmission lines. However, as the electricity-supply infrastructure ages and consumer demand for electricity grows, the capacity to deliver electrical power hasn't kept pace with demand, and upgrading the electrical-transmission grid has become a more pressing need. From 1988-1998, demand for transmission grew by 30 percent while transmission grew by only 15 percent. From 1999-2009, demand grew by 20 percent and transmission by only 3 percent Despite a short-term decline related to the economic downturn and improved efficiency, U.S. energy consumption is expected to increase by 14 percent between 2008 and 2035. This growth will drive the need to develop viable routes for new transmission lines. Because transmission lines extend over large distances, they typically cross many federal, tribal, state, local and private land jurisdictions, each with a complex and varying set of siting issues and land-management practices. And as the existing grid needs improvement to meet growing demand, the U.S. is rapidly developing renewable energy sources, particularly solar and wind energy, often in areas far removed from existing electricity-transmission infrastructure and energy-consumption areas.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using collaborative tools for energy corridor planning.

In November 2007, the Draft Programmatic Environmental Impact Statement on Designation of Energy Corridors on Federal Land in the Western 11 States was released. The draft proposes a network of 6055 miles of energy corridors on lands managed by seven different federal agencies. Determining the proposed locations of the corridors was a large collaborative effort among the agencies and included local, state, and federal land managers. To connect this geographically dispersed group of people, the project team employed a variety of approaches to communicate corridor siting issues, including sharing GIS layers and electronic maps, a downloadable GIS database and ArcReader project, workshops, and Internet webcast teleconferences. This collaborative approach allowed difficult siting issues to be understood and discussed from many perspectives, which resulted in rapid and effective decision making. The result was a proposed corridor system that avoids many sensitive resources and protected lands while accommodating expected energy development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗