Search NASA⌕ Search

Engineering topics

Kurnik, Charles W.

Publications and source records attributed to Kurnik, Charles W..

At least 19 records

Weatherization Crew Leader Job Task Analysis

The US Department of Energy's Guidelines for Home Energy Professionals project maintains job task analyses for jobs in the Weatherization Assistance Program and home performance industry. One of those jobs is Crew Leader, defined as: 'A Crew Leader is responsible for supervising and assisting in the retrofitting activities specified in the scope of work. He or she is responsible for interacting with the client plus managing personnel and materials on the job site in a safe and effective manner. The Crew Leader is responsible for quality control, testing procedures, documentation, and conducting a walk through in preparation that all work is completed in a satisfactory manner.' This document is an updated version of the Crew Leader job task analysis.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures: January 2012 - September 2016

This is the complete set of Uniform Methods Project protocols for determining energy efficiency savings for specific measures, all within one report. The report includes the following chapters: Chapter 1: Introduction. Chapter 2: Commercial and Industrial Lighting Evaluation Protocol. Chapter 3: Commercial and Industrial Lighting Controls Evaluation Protocol. Chapter 4: Small Commercial and Residential Unitary and Split System HVAC Cooling Equipment-Efficiency Upgrade Evaluation Protocol. Chapter 5: Residential Furnaces and Boilers Evaluation Protocol. Chapter 6: Residential Lighting Evaluation Protocol. Chapter 7: Refrigerator Recycling Evaluation Protocol. Chapter 8: Whole-Building Retrofit with Consumption Data Analysis Evaluation Protocol. Chapter 9: Metering Cross-Cutting Protocol. Chapter 10: Peak Demand and Time-Differentiated Energy Savings Cross-Cutting Protocol. Chapter 11: Sample Design Cross-Cutting Protocol. Chapter 12: Survey Design and Implementation for Estimating Gross Savings Cross-Cutting Protocol. Chapter 13: Assessing Persistence and Other Evaluation Issues Cross-Cutting Protocol. Chapter 14: Chiller Evaluation Protocol. Chapter 15: Commercial New Construction Evaluation Protocol. Chapter 16: Retrocommissioning Evaluation Protocol. Chapter 17: Residential Behavior Evaluation Protocol. Chapter 18: Variable Frequency Drive Evaluation Protocol. Chapter 19: HVAC Controls (DDC/EMS/BAS) Evaluation Protocol. Chapter 20: Data. Center IT Efficiency Measures Evaluation Protocol. Chapter 21: Estimating Net Savings - Common Practices. Chapter 22: Compressed Air Evaluation Protocol. Chapter 23: Combined Heat and Power Evaluation Protocol. Chapter 24: Strategic Energy Management (SEM) Evaluation Protocol

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Auditor and Quality Control Inspector Competency Model

The Energy Auditor (EA) and Quality Control Inspector (QCI) Competency model was developed to identify the soft skills, foundational competencies and define the levels of Knowledge, Skills, and Abilities (KSAs) required to successfully perform the tasks defined in the EA and QCI Job Task Analysis (JTAs), the U.S. Department of Energy (DOE) used the U.S. Department of Labor's (DOL) Competency Model Clearinghouse resources to develop a QCI and EA Competency Model. To keep the QCI and EA competency model consistent with other construction and energy management competency models, DOE and the National Renewable Energy Laboratory used the existing 'Residential Construction Competency Model' and the 'Advanced Commercial Building Competency Model' where appropriate.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Turf Conversion Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings as a result of water conservation measures (WCMs) in energy performance contracts associated with converting turfgrass or other water-intensive plantings to water-wise and sustainable landscapes. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Turf Conversion Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings as a result of water conservation measures (WCMs) in energy performance contracts associated with converting turfgrass or other water-intensive plantings to water-wise and sustainable landscapes. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Outdoor Irrigation Measurement and Verification Protocol

This measurement and verification (M&V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with outdoor irrigation efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M&V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Outdoor Irrigation Measurement and Verification Protocol

This measurement and verification (M&V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with outdoor irrigation efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M&V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Cooling Tower (Evaporative Cooling System) Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with cooling tower efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Cooling Tower (Evaporative Cooling System) Measurement and Verification Protocol

This measurement and verification (M and V) protocol provides procedures for energy service companies (ESCOs) and water efficiency service companies (WESCOs) to determine water savings resulting from water conservation measures (WCMs) in energy performance contracts associated with cooling tower efficiency projects. The water savings are determined by comparing the baseline water use to the water use after the WCM has been implemented. This protocol outlines the basic structure of the M and V plan, and details the procedures to use to determine water savings.

13 HYDRO ENERGY↗

Chapter 23: Combined Heat and Power Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

The main focus of most evaluations is to determine the energy-savings impacts of the installed measure. This protocol defines a combined heat and power (CHP) measure as a system that sequentially generates both electrical energy and useful thermal energy from one fuel source at a host customer's facility or residence. This protocol is aimed primarily at regulators and administrators of ratepayer-funded CHP programs; however, project developers may find the protocol useful to understand how CHP projects are evaluated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Chapter 8: Whole-Building Retrofit with Consumption Data Analysis Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

Whole-building retrofits involve the installation of multiple measures. Whole-building retrofit programs take many forms. With a focus on overall building performance, these programs usually begin with an energy audit to identify cost-effective energy efficiency measures for the home. Measures are then installed, either at no cost to the homeowner or partially paid for by rebates and/or financing. The methods described here may also be applied to evaluation of single-measure retrofit programs. Related methods exist for replace-on-failure programs and for new construction, but are not the subject of this chapter.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 15: Commercial New Construction Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

This protocol is intended to describe the recommended method when evaluating the whole-building performance of new construction projects in the commercial sector. The protocol focuses on energy conservation measures (ECMs) or packages of measures where evaluators can analyze impacts using building simulation. These ECMs typically require the use of calibrated building simulations under Option D of the International Performance Measurement and Verification Protocol (IPMVP).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 16: Retrocommissioning Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

Retrocommissioning (RCx) is a systematic process for optimizing energy performance in existing buildings. It specifically focuses on improving the control of energy-using equipment (e.g., heating, ventilation, and air conditioning [HVAC] equipment and lighting) and typically does not involve equipment replacement. Field results have shown proper RCx can achieve energy savings ranging from 5 percent to 20 percent, with a typical payback of two years or less (Thorne 2003). The method presented in this protocol provides direction regarding: (1) how to account for each measure's specific characteristics and (2) how to choose the most appropriate savings verification approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 19: HVAC Controls (DDC/EMS/BAS) Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

The HVAC Controls Evaluation Protocol is designed to address evaluation issues for direct digital controls/energy management systems/building automation systems (DDC/EMS/BAS) that are installed to control heating, ventilation, and air-conditioning (HVAC) equipment in commercial and institutional buildings. (This chapter refers to the DDC/EMS/BAS measure as HVAC controls.) This protocol may also be applicable to industrial facilities such as clean rooms and labs, which have either significant HVAC equipment or spaces requiring special environmental conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 3: Commercial and Industrial Lighting Controls Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

This Commercial and Industrial Lighting Controls Evaluation Protocol (the protocol) describes methods to account for energy savings resulting from programmatic installation of lighting control equipment in large populations of commercial, industrial, government, institutional, and other nonresidential facilities. This protocol does not address savings resulting from changes in codes and standards, or from education and training activities. When lighting controls are installed in conjunction with a lighting retrofit project, the lighting control savings must be calculated parametrically with the lighting retrofit project so savings are not double counted.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Chapter 7: Refrigerator Recycling Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy-Efficiency Savings for Specific Measures

Refrigerator recycling programs are designed to save energy by removing operable, albeit less efficient, refrigerators from service. By offering free pickup, providing incentives, and disseminating information about the operating cost of less efficient refrigerators, these programs are designed to encourage consumers to: - Limit the use of secondary refrigerators -Relinquish refrigerators previously used as primary units when they are replaced (rather than keeping the existing refrigerator as a secondary unit) -Prevent the continued use of less efficient refrigerators in another household through a direct transfer (giving it away or selling it) or indirect transfer (resale on the used appliance market). Commonly implemented by third-party contractors (who collect and decommission participating appliances), these programs generate energy savings through the retirement of inefficient appliances. The decommissioning process captures environmentally harmful refrigerants and foam, and enables recycling of the plastic, metal, and wiring components.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗