Identification and recovery of ATLAS18 strip sensors with high surface static charge
Not provided.
Engineering topics
Publications and source records attributed to Kvasnicka, J..
Not provided.
The CALICE collaboration is developing highly granular electromagnetic and hadronic calorimeters for detectors at future energy frontier electron-positron colliders. After successful tests of a physics prototype, a technological prototype of the Analog Hadron Calorimeter has been built, based on a design and construction techniques scalable to a collider detector. The prototype consists of a steel absorber structure and active layers of small scintillator tiles that are individually read out by directly coupled SiPMs. Each layer has an active area of 72 × 72 cm^2 and a tile size of 3 × 3 cm^2. With 38 active layers, the prototype has nearly 22,000 readout channels, and its total thickness amounts to 4.4 nuclear interaction lengths. The dedicated readout electronics provide time stamping of each hit with an expected resolution of about 1 ns. The prototype was constructed in 2017 and commissioned in beam tests at DESY. It recorded muons, hadron showers and electron showers at different energies in test beams at CERN in 2018. In this paper, the design of the prototype, its construction and commissioning are described. The methods used to calibrate the detector are detailed, and the performance achieved in terms of uniformity and stability is presented.
The successful pre-production delivery of strip sensors for the new Inner Tracker (ITk) for the upgraded ATLAS detector at the High Luminosity LHC (HL-LHC) at CERN was completed and based on their performance full production has commenced. The overall delivery period is anticipated to last 4 years to complete the approximately 22000 sensors required for the ITk. For Quality Assurance (QA), a number of test structures designed by the collaboration, along with a large area diode and miniature version of the main sensor, are produced in every wafer by the foundry Hamamatsu Photonics K.K (HPK). As well as Quality Control (QC) checks on every main sensor, samples of the QA pieces from each delivery batch are tested both before and after irradiation with results after exposure to neutrons, gammas or protons to fluences and doses corresponding to those anticipated after operation at the HL-LHC to roughly 1.5 times the ultimate integrated luminosity of 4000 fb -1 . In this paper the procedures are presented and the studies carried out to establish that the seven ITk QA Strip Sensor irradiation and test sites meet all the requirements to support this very extensive programme throughout the strip sensor production phase for the ITk project.
Abstract The ATLAS experiment is constructing new all-silicon inner tracking system for HL-LHC. The strip detectors cover the radial extent of 40 to 100 cm. A new approach is adopted to use p-type silicon material, making the readout in n + -strips, so-called n + -in-p sensors. This allows for enhanced radiation tolerance against an order of magnitude higher particle fluence compared to the LHC. To cope with varying hit rates and occupancies as a function of radial distance, there are two barrel sensor types, the short strips (SS) for the inner 2 and the long strips (LS) for the outer 2 barrel cylinders, respectively. The barrel sensors exhibit a square, 9.8 × 9.8 cm 2 , geometry, the largest possible sensor area from a 6-inch wafer. The strips are laid out in parallel with a strip pitch of 75.5 μm and 4 or 2 rows of strip segments. The strips are AC-coupled and biased via polysilicon resistors. The endcap sensors employ a “stereo-annulus” geometry exhibiting a skewed-trapezoid shapes with circular edges. They are designed in 6 unique shapes, R0 to R5, corresponding to progressively increasing radial extents and which allows them to fit within the petal geometry and the 6-inch wafer maximally. The strips are in fan-out geometry with an in-built rotation angle, with a mean pitch of approximately 75 μm and 4 or 2 rows of strip segments. The eight sensor types are labeled as ATLAS18xx where xx stands for SS, LS, and R0 to R5. According to the mechanical and electrical specifications, CAD files for wafer processing were laid out, following the successful designs of prototype barrel and endcap sensors, together with a number of optimizations. A pre-production was carried out prior to the full production of the wafers. The quality of the sensors is reviewed and judged excellent through the test results carried out by vendor. These sensors are used for establishing acceptance procedures and to evaluate their performance in the ATLAS collaboration, and subsequently for pre-production of strip modules and stave and petal structures.
Abstract The high-luminosity upgrade of the Large Hadron Collider, scheduled to become operational in 2029, requires the replacement of the ATLAS Inner Detector with a new all-silicon Inner Tracker. Radiation hard n + -in-p micro-strip silicon sensors were developed by the ATLAS Inner Tracker strip collaboration and are produced by Hamamatsu Photonics K.K. Production of the total amount of 22000 strip sensors has started in 2020 and will continue until 2025. The ATLAS strip sensor collaboration has the responsibility to monitor the quality of the fabricated devices by performing detailed measurements of individual sensor characteristics and by comparing the obtained results with the tests done by the manufacturer. Dedicated Quality Control procedures were developed to check whether the delivered large-format sensors adhere to the ATLAS specifications. The institutes performing the Quality Control testing of the pre-production and production ATLAS ITk strip sensors had to initially be qualified for multiple high-throughput tests by successfully completing the Site Qualification process. The Quality Control procedures and the qualification process are described in this paper.
The production of strip sensors within the framework of the ATLAS Inner Tracker (ITk) development is a process which requires continuous evaluation during the full production period (about 4 years). Such an evaluation is divided into two different parts: Quality Control (QC), which focuses on the final product (the actual sensors) and tries to identify possible defects once the fabrication is completed, and Quality Assurance (QA), which aims to prevent deviations in the manufacturing process and uses specifically-designed test structures. The initial sensor pre-production consists of 5% (1041 sensors) of the total number of sensors expected during production. As part of pre-production, the collaboration has measured key parameters from miniature strip sensors (minis), monitor diodes (MD8), and the ATLAS Testchip, before and after irradiation. In this contribution we focus on the analysis of the results of the MD8 and the Testchip. All parameters have been obtained from the test structures (MD8, bias resistors, interdigitated structures, field oxide capacitors, coupling capacitors, punch-through protection structures and cross-bridge resistors) measured at the different test sites (KEK/Tsukuba, Birmingham, Toronto, Ljubljana, Valencia, Carleton, Prague, CNM-Barcelona). The results are compared to predefined pre- and post-irradiation specifications for each tested parameter.
The Quality Control (QC) of pre-production strip sensors for the Inner Tracker (ITk) of the ATLAS Inner Detector upgrade has finished, and the collaboration has embarked on the QC test programme for production sensors. This programme will last more than 3 years and comprises the evaluation of approximately 22000 sensors. 8 Types of sensors, 2 barrel and 6 endcap, will be measured at many different collaborating institutes. The sustained throughput requirement of the combined QC processes is around 500 sensors per month in total. Measurement protocols have been established and acceptance criteria have been defined in accordance with the terms agreed with the supplier. For effective monitoring of test results, common data file formats have been agreed upon across the collaboration. To enable evaluation of test results produced by many different test setups at the various collaboration institutes, common algorithms have been developed to collate, evaluate, plot and upload measurement data. This allows for objective application of pass/fail criteria and compilation of corresponding yield data. These scripts have been used to process the data of more than 3000 sensors so far, and have been instrumental for identification of faulty sensors and monitoring of QC testing progress.