Search NASASearch

Engineering topics

Lam, Try

Publications and source records attributed to Lam, Try.

31 records · Page 2

Navigation Challenges in the MAVEN Science Phase

The MAVEN spacecraft will explore Mars' upper atmosphere. The primary science phase will last one (Earth) year, during which the spacecraft will be in an elliptical 4.5 hour orbit at an inclination of 75 degrees. The 75 degree inclination results in the orbit periapsis oscillating between +/-75 degrees latitude, thus naturally covering most Mars latitudes during the primary mission. The orbit will be controlled via maneuvers so that the maximum orbit density remains in a density corridor. This results in the MAVEN science phase being in a light aerobraking type orbit of around 160 km for an extended period. In addition, the mission has significantly less tracking data than aerobraking phases of other missions, and even less than other NASA Mars orbiter primary phases. This results in significant challenges for the Navigation Team. They can be summarized as a difficulty in determining the current density profile, which maps into degraded trajectory predictions and less accurate control over the spacecraft location in the targeted density corridor via maneuvers. This paper describes these challenges and the Navigation Team's plans to meet them.

MAVEN

Europa Planetary Protection for Juno Jupiter Orbiter

NASA's Juno mission launched in 2011 and will explore the Jupiter system starting in 2016. Juno's suite of instruments is designed to investigate the atmosphere, gravitational fields, magnetic fields, and auroral regions. Its low perijove polar orbit will allow it to explore portions of the Jovian environment never before visited. While the Juno mission is not orbiting or flying close to Europa or the other Galilean satellites, planetary protection requirements for avoiding the contamination of Europa have been taken into account in the Juno mission design.The science mission is designed to conclude with a deorbit burn that disposes of the spacecraft in Jupiter's atmosphere. Compliance with planetary protection requirements is verified through a set of analyses including analysis of initial bioburden, analysis of the effect of bioburden reduction due to the space and Jovian radiation environments, probabilistic risk assessment of successful deorbit, Monte-Carlo orbit propagation, and bioburden reduction in the event of impact with an icy body.

Juno

Broad Search Solar Electric Propulsion Trajectories to Saturn with Gravity Assists

Solar electric propulsion (SEP) trajectories to Saturn using multiple gravity assists are explored for the joint NASA and ESA Titan Saturn System Mission study. Results show that these new trajectories enable greater performance compared to chemical propulsion with similar gravity assists or SEP without gravity assists. This paper describes the method used in finding these interplanetary trajectories and examines variations in the performance for different SEP systems, flight times, and flyby sequences. The benefits of the SEP trajectories for a mission to Saturn are also discussed.

Titan

Planetary protection trajectory analysis for the Juno mission

Juno is an orbiter mission expected to launch in 2011 to Jupiter. Juno’s science orbit is a highly eccentric orbit with a period of about 11 days and a nominal duration of one year. Initially, the equatorial crossing near apojove occurs outside Callisto’s orbit, but as the mission evolves the apsidal rotation causes this distance to move much closer to Jupiter. This motion could lead to potential impacts with the Galilean satellites as the ascending node crosses the satellite orbits. In this paper, we describe the method to estimate impact probabilities with the satellites and investigate ways of reducing the probabilities for the Juno mission.

Kowalkowski, Theresa D.

Planetary Protection Trajectory Analysis for the Juno Mission

Juno is an orbiter mission expected to launch in 2011 to Jupiter. Juno's science orbit is a highly eccentric orbit with a period of about 11 days and a nominal duration of one year. Initially, the equatorial crossing near apojove occurs outside Callisto's orbit, but as the mission evolves the apsidal rotation causes this distance to move much closer to Jupiter. This motion could lead to potential impacts with the Galilean satellites as the ascending node crosses the satellite orbits. In this paper, we describe the method to estimate impact probabilities with the satellites and investigate ways of reducing the probabilities for the Juno mission.

Lam, Try

Launch Period Development for the Juno Mission to Jupiter

The Juno mission to Jupiter is targeted to launch in 2011 and would reach the giant planet about five years later. The interplanetary trajectory is planned to include two large deep space maneuvers and an Earth gravity assist a little more than two years after launch. In this paper, we describe the development of a 21-day launch period for Juno with the objective of keeping overall launch energy and delta-V low while meeting constraints imposed on Earth departure, the deep space maneuvers' timing and geometry, and Jupiter arrival.

mission design

The Jupiter Icy Moons Orbiter reference trajectory

The proposed NASA Jupiter Icy Moons Orbiter (JIMO) mission would have used a single spacecraft to orbit Callisto, Ganymede, and Europa in succession. The enormous Delta-Velocity required for this mission (nearly [25 km/s]) would necessitate the use of very high efficiency electric propulsion. The trajectory created for the proposed baseline JIMO mission may be the most complex trajectory ever designed. This paper describes the current reference trajectory in detail and describes the processes that were used to construct it.

optimization

Designing capture trajectories to unstable periodic orbits around Europa

The hostile environment of third body perturbations restricts a mission designer's ability to find well-behaved reproducible capture trajectories when dealing with limited control authority as is typical with low-thrust missions. The approach outlined in this paper confronts this shortcoming by utilizing dynamical systems theory and an extensive preexisting database of Restricted Three Body Problem (RTBP) periodic orbits. The stable manifolds of unstable periodic orbits are utilized to attract a spacecraft towards Europa. By selecting an appropriate periodic orbit, a mission designer can control important characteristics of the captured state including stability, minimum altitudes, characteristic inclinations, and characteristic radii among others. Several free parameters are optimized in the non-trivial mapping from the RTBP to a more realistic model. Although the ephemeris capture orbit is ballistic by design, low-thrust is used to target the state that leads to the capture orbit, control the spacecraft after arriving on the unstable quasi-periodic orbit, and begin the spiral down towards the science orbit. The approach allows a mission designer to directly target fuel efficient captures at Europa in an ephemeris model. Furthermore, it provides structure and controllability to the design of capture trajectories that reside in a chaotic environment.

low-thrust

The role of invariant manifolds in lowthrust trajectory design (part III)

This paper is the third in a series to explore the role of invariant manifolds in the design of low thrust trajectories. In previous papers, we analyzed an impulsive thrust resonant gravity assist flyby trajectory to capture into Europa orbit using the invariant manifolds of unstable resonant periodic orbits and libration orbits. The energy savings provided by the gravity assist may be interpreted dynamically as the result of a finite number of intersecting invariant manifolds. In this paper we demonstrate that the same dynamics is at work for low thrust trajectories with resonant flybys and low energy capture. However, in this case, the flybys and capture are effected by continuous families of intersecting invariant manifolds.

low thrust trajectories