Search NASA⌕ Search

Engineering topics

Lamalle, Philippe

Publications and source records attributed to Lamalle, Philippe.

Status of the ITER Ion Cyclotron H&CD

The ITER Ion Cyclotron Heating and Current Drive system (IC H&CD) is designed to deliver 20MW to a broad range of plasma scenarios between 40 and 55MHz, during very long pulses. It consists of two broadband equatorial port plug antennas, their pre-matching and matching systems, transmission lines, Radio Frequency (RF) Sources and High Voltage Power Supplies. The overall project schedule has been revised and agreed by ITER Council; it re-integrates the second antenna and its power supplies in construction baseline and sets the dates for progressive installation with DT phase planned in 2035. Recent progress on ICRF subsystems is reported, covering design evolution, qualification of test articles and specific R&D results in domestic agencies, suppliers, associated laboratories and IO.

Agarwal, Rohit↗

Commissioning of the ITER-like ICRF antenna for JET

The new JET ion cyclotron resonance frequency (ICRF) ITER-like antenna (ILA), which was assembled during 2006, was commissioned on the JET RF testbed prior to installation on the JET torus. The 4 resonant double loops (RDL) of the ILA were tested at high power at 42 MHz up to 42 kV for 5 s in 10 min intervals. Low power matching studies using a saltwater load placed in front of the ILA have allowed testing and optimizing proposed matching algorithms on single RDLs, paired RDLs and finally on the full array. The upper limit of the frequency range of the ILA appears to be limited to 47 49 MHz due to the effect on the electrical lengths of the connection between the capacitors and the conjugate T point. Capacitor position scans have allowed obtaining the necessary data to confirm the RF model of the RDL which is necessary for the scattering matrix arc detection. The latter is deemed necessary in order to detect arcs at the low impedance conjugate T of the circuit. The antenna was installed onto JET during August 2007 and commissioning on plasma started May 2008. At present the commissioning of the ILA on JET is ongoing in a series of dedicated experimental campaigns.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Progress on the heating and current drive systems for ITER

The electron cyclotron (EC), ion cyclotron (IC), heating-neutral beam (H-NB) and, although not in the day 1 baseline, lower hybrid (LH) systems intended for ITER have been reviewed in 2007/2008 in light of progress of physics and technology in the field. Although the overall specifications are unchanged, notable changes have been approved. Firstly, it has been emphasized that the H&CD systems are vital for the ITER programme. Consequently, the full 73 MW should be commissioned and available on a routine basis before the D/T phase. Secondly, significant changes have been approved at system level, most notably: the possibility to operate the heating beams at full power during the hydrogen phase requiring new shine through protection; the possibility to operate IC with 2 antennas with increased robustness (no moving parts); the possible increase to 2 MW of key components of the EC transmission systems in order to provide an easier upgrading of the EC power as may be required by the project; the addition of a building dedicated to the RF power sources and to a testing facility for acceptance of diagnostics and heating port plugs. Thirdly, the need of a plan for developing, in time for the active phase, a CD system such as LH suitable for very long pulse operation of ITER was recognised. The review describes these changes and their rationale.

08 HYDROGEN↗