Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

LCLS-II-HE Cryomodule Testing at Fermilab

22 Linac Coherent Light Source II (LCLS-II) cryomodules were successfully tested at the Cryomodule Test Facility (CMTF) at Fermilab. Following the completion of the LCLS-II testing program, CMTF has shifted to testing cryomodules for the LCLS-II High Energy upgrade (LCLS-II-HE). The first LCLS-II-HE cryomodule, the verification cryomodule (vCM), was successfully tested and verified the readiness of LCLS-II-HE cryomodule testing at CMTF, and production cryomodule testing has begun. Presented here are the production cryomodule test acceptance criteria, testing plan, and cryomodule test results so far.

43 PARTICLE ACCELERATORS↗

Simulation of DWPF Chemical Process Cell Using a Reaction Calorimeter

The Defense Waste Processing Facility (DWPF) converts liquid radioactive waste into glass using a Sludge Receipt Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) in addition to other processes. The SRAT and SME processes can be simulated on a small-scale using the Mettler-Toledo Reaction Calorimeter (RC1). This equipment is able to automate the execution and monitoring of experiments involving nonradioactive chemical simulants. During the chemical processing of sludge in the SRAT process, foam begins to form and can foam over the reaction vessel. The current antifoam used at DWPF creates a risk of increased flammability and has a limited pH range. Usually, mercury is circulated back into the reaction vessel during the SRAT process, making it difficult to remove. To combat foam over, novel antifoams will be tested during the boil-up process using the RC1. To improve mercury extraction, 3D-printed coalescer columns will be tested within the Mercury Water Wash Tank (MWWT) of the RC1. Testing of Simulant Sludge Batch 6 (SB6) was performed to ensure: the sludge would form a stable foam at boiling during full SRAT/SME runs; the antifoam would reduce the amount of foam within the vessel The sludge and a Precipitate Reactor Feed Tank (PRFT) simulant with monosodium titanate (MST) were mixed separately, combined, and then heated to boiling. As shown below, the antifoam used was able to eliminate the foam within the vessel, as expected. The FormLabs Form2 3D Printer can be used to create roughly 3-inch tall and 1-inch diameter columns from clear and ceramic resins. The columns will utilize chemical and physical forces to draw the mercury out of a condensed offgas stream leaving the RC1 reaction vessel. These columns will be tested during full SRAT/SME runs on the basis of how well they are able to collect elemental mercury. In preparation for full-scale runs, the RC1 equipment was assembled onto a custom table and tested with water runs. The software used to control automation, iControl, has a user-friendly interface that allows the experiment to be altered as needed. An example of the data recorded during an experimental run is represented in Figure 1 below. Water runs were utilized as a way to prove if the RC1 system was functioning in the following areas: Boil-up rates, Chemical additions using pumps, Temperature readings, Balance readings, Probe readings, Offgas system, Agitation. Future Plans: Five novel antifoams will be tested during full SRAT/SME runs. The most effective antifoam will be utilized in DWPF's Chemical Process Cell. The design of the Mercury Extraction Coalescer can be further manipulated to increase the extraction of not only elemental mercury, but other heavy metals in environmental remediation processes as well.