Search NASA⌕ Search

Engineering topics

Lang, B R

Publications and source records attributed to Lang, B R.

Design of the FRIB Cryomodule

An advanced, modular bottom-supported cryomodule design is described which is highly optimized for mass-production and efficient precision-assembly. The FRIB driver linac uses 4 types of superconducting resonators and 2 solenoid lengths which in turn require 7 individual cryomodule configurations. To meet alignment tolerances a precision-machined bolted cryomodule rail system is described. A novel, kinematic mounting system of the cold mass is introduced which allows for thermal contractions while preserving alignment. A first prototype will incorporate a wire position monitor for alignment verification. The cold alignment structure is supported by composite posts which also function as thermal isolators. The cryogenic system provides separate 2 K and 4.5 K liquid helium lines to cavities and solenoids. Details of the JT valves, heat exchanger, cool-down circuit and junction to cryogenic line will be provided. Transient cool-down was simulated for stresses and buckling failure. A 1100-O Aluminum shield is used as a thermal radiation shield. The paper also describes cryomodule interfaces with the linac tunnel, the RF input cables, and the cryogenic distribution system.

43 PARTICLE ACCELERATORS↗

Ion Source Development at the SNS

The Spallation Neutron Source (SNS) now routinely operates near 1 MW of beam power on target with a highly-persistent {approx}38 mA peak current in the linac and an availability of {approx}90%. The {approx}1 ms-long, 60 Hz, {approx}50 mA H{sup -} beam pulses are extracted from a Cs-enhanced, multi-cusp, RF-driven, internal-antenna ion source. An electrostatic LEBT (Low Energy Beam Transport) focuses the 65 kV beam into the RFQ accelerator. The ion source and LEBT have normally a combined availability of {approx}99%. Although much progress has been made over the last years to achieve this level of availability further improvements are desirable. Failures of the internal antenna and occasionally impaired electron dump insulators require several source replacements per year. An attempt to overcome the antenna issues with an AlN external antenna source early in 2009 had to be terminated due to availability issues. This report provides a comprehensive review of the design, experimental history, status, and description of recently updated components and future plans for this ion source. The mechanical design for improved electron dump vacuum feedthroughs is also presented, which is compatible with the baseline and both external antenna ion sources.

07 ISOTOPE AND RADIATION SOURCES↗