Stabilizing the Power System in 2035 and Beyond: Evolving from Grid-Following to Grid-Forming Distributed Inverter Controllers (Final Technical Report)

Under existing grid operations, large synchronous generators provide sufficient rotational inertia to form a rigid backbone for the bulk power system. With photovoltaics (PV) forecasted to provide more than 600 GW of generation by 2050 under the U.S. Department of Energy’s SunShot Initiative objectives, however, it is clear that power electronic inverters will play a dominant role in future systems, and low-inertia stability must be ensured to maintain system reliability. Today, the risks to system stability can be observed on geographically small islands, such as Hawaii, which contain a relatively large amount of installed PV. These risks stem from a fundamental shortcoming of contemporary control strategies—existing inverter controllers cannot guarantee grid stability. Given that future power systems driven by sustainable resources will be characterized by low inertia, locations such as Hawaii provide a glimpse into the obstacles facing future power systems. Considering these challenges, the aim of this project was to develop and demonstrate distributed inverter controllers that enable the reliable control of low-inertia power systems with hundreds of gigawatts of integrated PV.

14 SOLAR ENERGY↗

Bulk Power System Dynamics with Varying Levels of Synchronous Generators and Grid-Forming Power Inverters

Inverters using phase-locked loops for control depend on voltages generated by synchronous machines to operate. This might be problematic if much of the conventional generation fleet is displaced by inverters. To solve this problem, grid-forming control for inverters has been proposed as being capable of autonomously regulating grid voltages and frequency. Presently, the performance of bulk power systems with massive penetration of grid-forming inverters has not been thoroughly studied as to elucidate benefits. Hence, this paper presents inverter models with two grid-forming strategies: virtual oscillator control and droop control. The two models are specifically developed to be used in positive-sequence simulation packages and have been implemented in PSLF. The implementations are used to study the performance of bulk power grids incorporating inverters with gridforming capability. Specifically, simulations are conducted on a modified IEEE 39-bus test system and the microWECC test system with varying levels of synchronous and inverter-based generation. The dynamic performance of the tested systems with gridforming inverters during contingency events is better than cases with only synchronous generation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Value and Technology Assessment to Enhance the Business Case for the CERTS Microgrid

The CERTS Microgrid concept is an advanced approach for enabling integration of, in principle, an unlimited quantity of distributed energy resources into the electricity grid. A key feature of a microgrid, is its ability, during a utility grid disturbance, to separate and isolate itself from the utility seamlessly with no disruption to the loads within the microgrid (including no reduction in power quality). Then, when the utility grid returns to normal, the microgrid automatically resynchronizes and reconnects itself to the grid, in an equally seamless fashion. What is unique about the CERTS Microgrid is that it can provide this technically challenging functionality without extensive (i.e., expensive) custom engineering. In addition, the design of the CERTS Microgrid also provides high system reliability and great flexibility in the placement of distributed generation within the microgrid. The CERTS Microgrid offers these functionalities at much lower costs than traditional approaches by incorporating peer-to-peer and plug-and-play concepts for each component within the Microgrid. The predecessor to the current project involved the construction of and completion of initial testing using the world's first, full-scale, inverter-based, distributed generation test bed. The project demonstrated three advanced techniques, collectively referred to as the CERTS Microgrid concept, which collectively significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques are: (1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; (2) an approach to electrical protection within the microgrid that does not depend on high fault currents; and (3) a method for microgrid control that achieves voltage and frequency stability under both grid and islanded conditions without requiring high-speed communications. The work conducted in this phase of RD&D on the CERTS Microgrid Concept builds upon this base of technical accomplishments to prioritize, develop, and then demonstrate technology enhancements to further enhance the business case for microgrids. That is, having demonstrated the technical feasibility of microgrid functions, RD&D optimization efforts are now needed to accelerate commercial deployment. The current phase is a contribution to these efforts. This project involved seven distinct analysis, bench-, and full-scale testing tasks. The first five tasks were described in the original proposal submitted and awarded through DOE's solicitation. Two additional tasks were added to address issues that had been identified in the earlier, first phase of testing.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CERTS Microgrid Laboratory Test Bed

The objective of the CERTS Microgrid Test Bed project was to enhance the ease of integrating energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of generating sources less than 100kW. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation, islanding the microgrid's load from a disturbance, thereby maintaining a higher level of service, without impacting the integrity of the utility's electrical power grid; 2) an approach to electrical protection within a limited source microgrid that does not depend on high fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications between sources. These techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations,and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers Standard 1547 and power quality requirements. The electrical protection system was able to distinguish between normal and faulted operation. The controls were found to be robust under all conditions, including difficult motor starts and high impedance faults. The results from these tests are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or more of the CERTS Microgrid concepts. Future planned microgrid work involves unattended continuous operation of the microgrid for 30 to 60 days to determine how utility faults impact the operation of the microgrid and to gage the power quality and reliability improvements offered by microgrids.