Search NASA⌕ Search

Engineering topics

Latif, Aadil

Publications and source records attributed to Latif, Aadil.

At least 19 records

Distribution System Dataset Generator for AI Applications [SWR-24-75]

This software is a simple, light-weight python package to generate pytorch compatible machine learning graph dataset representing electric power distribution system. User is able to use these graph datasets to test their graph generation artificial intelligence (AI) models, link prediction AI models, graph classification AI models and so much more. This package uses grid-data-models (https://github.com/NREL-Distribution-Suites/grid-data-models) as input data format for power distribution system. NREL-Ditto (https://github.com/NREL-Distribution-Suites/ditto) tool can be leveraged to transform popular distribution system file formats such as opendss, cyme and synergi to grid-data-models.

Duwadi, Kapil↗

GDM (Grid Data Models) [SWR-24-31]

Grid Data Models (GDM) is a collection of pydantic data models for power distribution and transmission system components. These data models can be easily serialized and deserialized. GDM provides a standard interface for accessing power system component data with built in validation. See also: https://pypi.org/project/grid-data-models/

Duwadi, Kapil↗

InfraSys (Infrastructure Systems) [SWR-24-42]

This package implements a data store for components and time series in support of Python-based modeling packages. While it is designed to support teams modeling transmission and distribution systems for electrical grids, it can be used by any package that needs to store components (e.g., generators and buses) that have quantities (e.g., power and voltage) which may vary over time. The package was inspired by InfrastructureSystems.jl (https://github.com/NREL-Sienna/InfrastructureSystems.jl).

Thom, Daniel↗

Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100): Final Report

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) is a comprehensive analysis based on extensive stakeholder input of possible pathways for Puerto Rico to achieve its goal of 100% renewable energy by 2050. PR100 was an integrated effort drawing on expertise and capabilities of the contributing national laboratories that explored possible pathways for Puerto Rico to achieve its goal of 100% renewable energy in the long term (by 2050), increase reliability and resilience in the immediate term (within the next few years), and work toward energy justice. The purpose of the study is to provide decision support and inform investment decisions for implementers of Puerto Rico's energy transition. See NREL/TP-6A20-88614 for the Spanish translation of this report.

100% renewable energy target↗

El Estudio de Resiliencia de la Red Electrica de Puerto Rico y Transiciones a Energia 100% Renovable (PR100): Informe Final [Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100): Final Report]

El Estudio de Resiliencia de la Red de Puerto Rico y Transiciones a Energia 100% Renovable (PR100) es un analisis integral basado en amplios aportes de las partes interesadas sobre posibles caminos para que Puerto Rico alcance su meta de 100% de energía renovable para 2050. PR100 fue un esfuerzo integrado que se baso en experiencia y capacidades de los laboratorios nacionales contribuyentes que exploraron posibles caminos para que Puerto Rico logre su objetivo de 100% de energía renovable en el largo plazo (para 2050), aumente la confiabilidad y la resiliencia en el plazo inmediato (dentro de los proximos anos), y trabajar hacia la justicia energetica. El proposito del estudio es brindar apoyo a las decisiones e informar las decisiones de inversion para los implementadores de la transicion energetica de Puerto Rico. See NREL/TP-6A20-88384 for the English translation of this report.

100% renewable energy target↗

Multi-Federate Co-Convergence with HELICS

In co-simulation studies, convergence refers to the ability of different simulation tools involved to achieve a consistent and stable solution. Convergence is a critical aspect of co-simulation as it determines the accuracy of the results obtained from the simulation. Convergence in co-simulation studies depends on several factors, this includes system complexity, the accuracy of the models used, and the numerical methods employed by the simulation tools. It is essential to ensure that the coupling interfaces between the different tools are designed to allow for data exchange in a consistent and accurate manner. Hierarchical Engine for Large-scale Infrastructure Co-Simulation (HELICS) is an open-source co-simulation framework developed for the energy domain. This paper explores the convergence performance of a set of co-simulation use cases. We further explore the use of a co-convergence helper federate to help with co-simulation convergence. The convergence efficacy of several algorithms (both gradient-based and gradient-free) is tested against these use cases. Finally, the sensitivity of these algorithms to several factors, such as system scaling and others, is tested and detailed in this paper. Our results show that for a subset of use cases, the co-convergence helper federate is able to improve co-simulation convergence significantly.

co-convergence↗

PR100 Final Results

This presentation includes a summary of the final results from the Puerto Rico Grid Resilience and Transition to 100% Renewable Energy Study (PR100). Led by the U.S. Department of Energy's Grid Deployment Office and the National Renewable Energy Laboratory, and funded by the Federal Emergency Management Agency, the PR100 Study was a two-year effort resulting in stakeholder-driven pathways for Puerto Rico to meet its clean energy goals. For Spanish version see https://www.nrel.gov/docs/fy24osti/88975.pdf.

100% renewable energy target↗

Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) (Summary Report)

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) is a comprehensive analysis based on extensive stakeholder input of possible pathways for Puerto Rico to achieve its goal of 100% renewable energy by 2050. In this summary report of the PR100 Final Report, we describe the background and motivation behind the study, provide an overview, summarize results, highlight key findings, and outline implementation actions for stakeholders to take in the immediate-, near-, mid-, and long-term to achieve Puerto Rico’s energy system goals.

100% renewable energy target↗

Estudio de Resiliencia de la Red Electrica de Puerto Rico y Transiciones a Energia 100% Renovable (PR100): Informe resumido [Spanish Translation of Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) (Summary Report)]

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) is a comprehensive analysis based on extensive stakeholder input of possible pathways for Puerto Rico to achieve its goal of 100% renewable energy by 2050. In this summary report of the PR100 Final Report, we describe the background and motivation behind the study, provide an overview, summarize results, highlight key findings, and outline implementation actions for stakeholders to take in the immediate-, near-, mid-, and long-term to achieve Puerto Rico’s energy system goals. For the English version of this report, see NREL/TP-6A20-88615 (https://www.nrel.gov/docs/fy24osti/88615.pdf).

100% renewable energy target↗

Presentacion del Webinar Publico sobre Resultados Finales del Estudio PR100

Esta presentacion incluye un resumen de los resultados finales del Estudio de Resiliencia de la Red Electrica de Puerto Rico y Transiciones a Energia 100% Renovable (PR100). Dirigido por el Departamento de Energia y el Laboratorio Nacional de Energias Renovables, y financiado por la Agencia Federal para el Manejo de Emergencias, el estudio PR100 fue un esfuerzo de dos anos que ha resultado en caminos impulsados por las partes interesadas para que Puerto Rico alcance sus metas de energia limpia. For the English version of this presentation, see NREL/PR-6A20-88773 (https://www.nrel.gov/docs/fy24osti/88773.pdf).

100% renewable energy target↗

Automating the Solar Interconnection Technical Evaluation Process: PREconfiguring and Controlling Inverter SEt-Points (PRECISE)

Utilities are receiving an increasing number of interconnection requests for distributed solar photovoltaic (PV) systems from their customers, requiring a solution to quickly and intelligently perform technical assessments of these requests and to manage these new renewable energy assets. In this paper, we present a stand-alone interconnection tool, PREconfiguring and Controlling Inverter SEt-points (PRECISETM), and how it overcomes the challenges of accelerating technical evaluations and leverages smart inverter functionality to provide local voltage support on an as-needed basis. The paper details the purpose and architecture of PRECISE, including tools, data source requirements, the model-based interconnection evaluation process, and technical results. PRECISE is an integrated software tool that customizes PV inverter settings for utilities by modeling and assessing impacts on local voltages and the need for advanced inverter functions (AIFs) (e.g., volt-VAR and volt-watt). PRECISE maximizes the use of readily available utility data sets to make fast online assessments of incoming PV interconnection requests and makes accept/reject recommendations along with custom settings for AIFs.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Developing Synthetic Distribution Models Using Open-Source Data Sets

The deployment of distributed generation resources at scale with the distribution side of the power system network over the last two decades has spurred a lot of research interest in distribution networks. Given, the sensitive nature of power system data sets, utilities are still reluctant to open-source distribution networks. Although some open-source data sets are available, they may not cover the region of interest. In this paper, we introduce the Synthetic dIstribution Network Generator (SING), new software that allows users to develop synthetic distribution models, using open-source data sets, in any region of interest within the continental US.

data set↗

CyMEpy [SWR-21-20]

CYMEpy is a high-level Python package that provides users HELICS bindings for CYMEDIST, CYME’s distribution system simulator.

Latif, Aadil↗

SING (Synthetic dIstribution Network Generator) [SWR-22-57]

Synthetic dIstribution Network Generator is a standalone python module that is able to create synthetic distribution models for OpenDSS using GIS datasets. The software uses road and building information from OpenStreetMaps to generate these synthetic models.

Latif, Aadil↗

Rapid QSTS Simulations for High-Resolution Comprehensive Assessment of Distributed PV

The rapid increase in penetration of distributed energy resources on the electric power distribution system has created a need for more comprehensive interconnection modeling and impact analysis. Unlike conventional scenario-based studies, quasi-static time-series (QSTS) simulations can realistically model time-dependent voltage controllers and the diversity of potential impacts that can occur at different times of year. However, to accurately model a distribution system with all its controllable devices, a yearlong simulation at 1-second resolution is often required, which could take conventional computers a computational time of 10 to 120 hours when an actual unbalanced distribution feeder is modeled. This computational burden is a clear limitation to the adoption of QSTS simulations in interconnection studies and for determining optimal control solutions for utility operations. The solutions we developed include accurate and computationally efficient QSTS methods that could be implemented in existing open-source and commercial software used by utilities and the development of methods to create high-resolution proxy data sets. This project demonstrated multiple pathways for speeding up the QSTS computation using new and innovative methods for advanced time-series analysis, faster power flow solvers, parallel processing of power flow solutions and circuit reduction. The target performance level for this project was achieved with year-long high-resolution time series solutions run in less than 5 minutes within an acceptable error.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Considerations for Distributed Energy Resource Integration in Puerto Rico: DOE Multi-Lab Grid Modeling Support for Puerto Rico; Analytical Support for Interconnection and IEEE Std 1547-2018 National Renewable Energy Laboratory (Task 3.0)

To ensure the sustainable long-term recovery of Puerto Rico's electric power grid from hurricanes María and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, the U.S. Department of Energy (DOE) convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. A resilient electric grid is vital to Puerto Rico's security, economy, and way of life, and it will provide the foundation for essential services that people and businesses on the island rely on every day. This report shows progress for a grid modeling task under the DOE-sponsored project that is a collaboration among the National Renewable Energy Laboratory (NREL) and other national laboratories. In Phase 1 of the multilab effort to support Puerto Rico's recovery, NREL provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliably, safety, or security. This Phase 2 report focuses on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico. This report is intended to familiarize the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provides considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard (RPS) goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers (IEEE) 1547-2018 interconnection standard.

24 POWER TRANSMISSION AND DISTRIBUTION↗