Search NASASearch

Engineering topics

Leavitt, R. K.

Publications and source records attributed to Leavitt, R. K..

TOPEX/Poseidon orbit maintenance for the first five years

The TOPEX/Poseidon orbit maintenance strategy was changed following launch to include the effects of observed unmodeled, and hence anomalous, along-track accelerations. The anomalous force causes the semi-major axis, a, to either increase (called "boost") or decrease ("deboost" or "decay") depending on the satellite attitude and solar array pitch angle offset. Although this force is the most uncertain parameter in ground track prediction, it has been used as a passive technique for orbit maintenance, thereby reducing the number of propulsive maneuvers, enhancing maneuver spacing, and to place maneuvers at convenient times. This passive technique was first demonstrated in May 1993. The TOPEX/Poseidon orbit has been uniquely maintained using both passive (non-propulsive) and active (propulsive) maneuvers. Furthermore, the orbit has been maintained using only the passive technique since the ninth orbit maintenance maneuver on January 15, 1996. Only nine orbit maintenance maneuvers have been required to maintain the ground track, including verification site over flights, since achieving the operational orbit on September 21, 1992 (mission requirement: 95% within +/- l km). During this period, a has varied within 7,714,429 +/- 7 m, while the inclination i periodically fluctuated in the range 66.0408 deg. +/- 0.0040 deg. The frozen orbit (required e < 0.001 and omega approximately equals to 90 deg.) has been maintained without any dedicated eccentricity maneuvers. The frozen eccentricity vector has completed two periodic cycles and it is currently tracing its third cycle (period approximately equals 26.7 months).

Bhat, R. S.

Polynomial smoothing of DRVID data

Charged particle calibrations based on differenced range versus integrated Doppler (DRVID) are smoothed and fitted with a polynomial prior to its application in the orbit determination process. A description is given of the results of the tests performed on the computer program performing these calculations to determine its characteristics and to evaluate the acceptability of its computations. This program, called MEDIA, is described.

Leavitt, R. K.

The least squares process of MEDIA for computing DRVID calibration polynomials

A process is described and evaluated for computing a least squares polynomial approximation of data points in which the optimum degree of the polynomial is automatically determined. An iterative smoothing technique is used to replace every point with the value taken on by a moving least squares polynomial computed from a subset of points centered at the point to be replaced. The optimum degree of the resulting polynomial approximation is determined by analyzing the finite differences of each successive set of smoothed points. To evaluate the process, both artificially constructed data and actual Mariner Mars 1971 (MM'71) tracking data are used. This process was incorporated into a transmission media calibration computer program (MEDIA), which calibrates radiometric data to overcome the effects on the tracking signal of charged particle media. MEDIA was used in support of MM'71.

Leavitt, R. K.