The Science Performance of JWST as Characterized in Commissioning

This paper characterizes the actual science performance of the James Webb Space Telescope (JWST), as determined from the six month commissioning period. We summarize the performance of the spacecraft, telescope, science instruments, and ground system, with an emphasis on differences from pre-launch expectations. Commissioning has made clear that JWST is fully capable of achieving the discoveries for which it was built. Moreover, almost across the board, the science performance of JWST is better than expected; in most cases, JWST will go deeper faster than expected. The telescope and instrument suite have demonstrated the sensitivity, stability, image quality, and spectral range that are necessary to transform our understanding of the cosmos through observations spanning from near-earth asteroids to the most distant galaxies.

Infrared astronomy

JWST NIRCam Defocused Imaging Photometric Stability Performance and How It Can Sense Mirror Tilts

We use JWST NIRCam short-wavelength photometry to capture a transit lightcurve of the exoplanet HAT-P-14 b to assess performance as part of instrument commissioning. The short-wavelength precision is 152 ppm per 27 s integration as measured over the full time series compared to a theoretical limit of 107 ppm, after corrections to spatially correlated 1/f noise. Persistence effects from charge trapping are well fit by an exponential function with short characteristic timescales, settling on the order of 5–15 minutes. The short-wavelength defocused photometry is also uniquely well suited to measure the real-time wave-front error of JWST. Analysis of the images and reconstructed wave-front maps indicates that two different hexagonal primary mirror segments exhibited “tilt events,” where they changed orientation rapidly in less than ∼1.4 s. In some cases, the magnitude and timing of the flux jumps caused by tilt events can be accurately predicted with a telescope model. These tilt events can be sensed by simultaneous longer-wavelength NIRCam grism spectral images alone in the form of changes to the point-spread function, diagnosed from the full width at half maximum. They can also be sensed with the fine guidance sensor instrument from difference images. Tilt events possibly from sudden releases of stress in the backplane structure behind the mirrors were expected during the commissioning period because they were found in ground-based testing. Tilt events have shown signs of decreasing in frequency but have not disappeared completely. The detectors exhibit some minor (less than 1%) deviations from linear behavior in the first few groups of each integration, potentially impacting absolute fluxes and transit depths on bright targets, where only a handful of groups are possible. Overall, the noise is within 50% of the theoretical photon noise and read noise. This bodes well for high-precision measurements of transiting exoplanets and other time variable targets.

Everett Schlawin

Status of the James Webb Space Telescope Mission

The James Webb Space Telescope ( Webb) is the largest space telescope realized to-date, with a 6.5 m segmented primary mirror that must be folded to fit within its Ariane 5 launcher fairing. This infrared telescope is passively cooled using a five-layer sunshield that will keep the optical telescope and its four science instruments in the shade throughout the lifetime of the mission in an L2 orbit. Webb's science instruments include near- and mid­ infrared imagers and spectrometers that cover the spectral range from 0.6-28.5 µm. The Webb mission has a long history with numerous first of its kind technology developments, ground support equipment innovations, and algorithmic characterization advances. This conference proceeding summarizes the technical progress over the past two years, from the Spacecraft Element environmental testing to the Observatory integration and testing, and the final Observatory test plans leading up to launch, on-orbit commissioning, and science operations.

Michael W McElwain

Commissioning the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is going through final integration and testing and is planned to launch in 2021. The last remaining optical challenge for JWST is to fully align the observatory in flight to meet the optical requirements but this effort involves many system considerations to do this safely and efficiently and the entire effort will take several months. This talk will cover what it takes to deploy and optically commission the telescope including the many interactions and constraints of deployment, thermal, optical, attitude control and contamination properties of the observatory. The talk will cover the final optical requirements that the telescope will need to meet and will provide the roadmap of timelines, cooldown profiles, Wavefront Sensing and Control steps, system constraint considerations, and implementation of lessons learned from the ground test campaign that will result in meeting those optical requirements. The talk will also cover the organizational structure and processes in place to assure this process will be successful and efficient.

Commissioning JWST OBS

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg

The Habitable Worlds Observatory Engineering View: Status, Plans and Opportunities

The NASA has begun the Great Observatory Maturation Program (GOMAP) with the goal of studying and advancing the Habitable Worlds Observatory (HWO), a large ultraviolet, optical, infrared space telescope recommended by the Astro 2020 Decadal Survey. Among its many goals, HWO will obtain spectra of at least 25 exo-Earth candidates to search for signs of life and conduct transformative astrophysics at ultraviolet, optical, and near-infrared wavelengths. The observatory, like HST and JWST, will be a powerful general class observatory. This past Fall the GOMAP program stood up two study groups, the Science Technology Architecture Review Team (START) and the Technical Assessment Group (TAG) aimed at helping to study the science, technology and architecture options for this new flagship mission. This talk will discuss the engineering activities associated with these studies including the team and organization, the study plan and the use of the Concept Maturity Level (CML) approach. In addition, the talk will discuss the key initial engineering efforts, the key technology gaps, and overall engineering plans.

HWO