Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler

Modeling Deicing Operations in Departure Scheduling Using Fast Time Simulation

In winter snow conditions, aircraft need inspection for deicing service before takeoff. Deicing service is a procedure to remove frost, ice, slush, or snow from aircraft for safe operation. Deicing operations vary by airport in many ways. Some airports have designated deicing zones, whereas some use a closed runway or terminal area to perform the procedure. Nonetheless, deicing operations add extra workloads to controllers, and cause increased taxi traffic on the ground. NASA and Korea Aerospace Research Institute (KARI) have been collaborating to model deicing operations at Incheon International Airport (ICN). This paper describes the deicing model and the study of deicing operations in departure scheduling using fast time simulations. The deicing model uses a heuristic algorithm for deicing zone assignment. In the fast time simulations, the model uses probability distributions derived from actual operation data to model deicing request and deicing zone time. It is envisioned that such a deicing model can be useful in airport surface scheduling to provide decision support and improve traffic management performance in winter snow operations.

modeling and simulation

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler

Modeling Deicing Operations in Departure Scheduling using Fast Time Simulation

In winter snow conditions, aircraft need inspection for deicing service before takeoff. Deicing service is a procedure to remove frost, ice, slush, or snow from aircraft for safe operation. Deicing operations vary by airport in many ways. Some airports have designated deicing zones, whereas some use a closed runway or terminal area to perform the procedure. Nonetheless, deicing operations add extra workloads to controllers, and cause increased taxi traffic on the ground. NASA and Korea Aerospace Research Institute (KARI) have been collaborating to model deicing operations at Incheon International Airport (ICN). This paper describes the deicing model and the study of deicing operations in departure scheduling using fast time simulations. The deicing model uses a heuristic algorithm for deicing zone assignment. In the fast time simulations, the model uses probability distributions derived from actual operation data to model deicing request and deicing zone time. It is envisioned that such a deicing model can be useful in airport surface scheduling to provide decision support and improve traffic management performance in winter snow operations.

surface operation

A Tactical Scheduler for Surface Metering Under Minimum Departure Interval Restrictions

Minimum Departure Interval (MDI) and Miles-In-Trail (MIT) are common traffic management tools. They both require minimum separation between departures to meet specific traffic conditions. The MDI restriction is a time separation requirement between departures, usually on the same Standard Instrument Departure (SID), whereas the MIT restriction is a distance separation requirement between aircraft, including but not limited to departure flights, to meet specific criteria associated with flight path or destination. At Incheon International Airport (IATA code: ICN) in South Korea, MDIs are imposed on 92% of departure flights. They involve specific criteria including not only having identical SID, but also satisfying other conditions, imposed on the flight path and destination. To address complicated MDI constraints, Korea Aerospace Research Institute (KARI) has been developing and improving a tactical scheduler for surface metering at ICN to provide appropriate target times for pushbacks and takeoffs for departure flights under MDIs. This paper describes the MDI requirements at ICN, the development of a heuristic scheduling algorithm to work with the MDI restrictions, and the performance evaluation of the algorithm through fast-time simulations. The performance evaluation results indicate that the proposed heuristic algorithm can provide the surface metering schedules that comply with the MDI restrictions without significant performance degradation.

DMAN (Departure Management)

Airspace Technology Demonstration 2 (ATD-2): Simulation and Modeling Used in Surface Analysis

This presentation describes how the fast-time simualtion and modeling techniques are used in the development of ATD-2 system, especially for surface traffic data anlaysis. This presentation will answer the following questions: What analytical results are most important to communicate to Industry from ATD-2 simulation? What fast-time simulations are currently in the works, including EOBT quality impact study and benefits/costs assessment of ATD-2?

fast-time simulation

Assessment of Ramp Times 4 (ART-4) Human-in-the-Loop (HITL) Simulation - Final Results

Airspace Technology Demonstration 2 (ATD-2) sub-project conducted a Human-in-the-Loop (HITL) simulation to assess Ramp Controllers ability to deliver aircraft to the spot within the compliance window (+/- 5 min) under various metering conditions. Compliance at the spot was similar between the different metering conditions ranging between 83% - 85% and increased to 92% - 99% when aircraft were initially compliant with gate advisories. Metering benefits that exist in the field did not appear in the simulation due to simulation artifacts such as gate holding departures in Baseline, which effectively metered the demand. The combined Target Off-Block Time (TOBT) +Target Movement Area entry Time (TMAT) condition resulted in higher workload on the Workload Assessment Keypad (WAK) than the Baseline and TOBT alone conditions, and lower situation awareness than the Baseline condition. Metering at Dallas/Fort Worth International Airport (DFW) with TOBT only or TMAT only could be equally effective, and either would be a better option than TOBT + TMAT due to increased workload and reduced situation awareness.

Jung, Yoon C.

ATD-2 Briefing to Southwest Data Science Community

The purpose of this presentation is to provide Southwest Airlines, an ATD-2 (Airspace Technology Demonstration-2) airline industry partner, with a project overview and the breadth of ATD-2 data analysis activities.

ATD-2 (Airspace Technology Demonstration-2)

Alternatives for Scheduling Departures for Efficient Surface Metering in ATD-2: Exploration in a Human-in-the-Loop Simulation

Human-in-the-Loop (HITL) simulation was conducted to explore the impacts of various surface metering goals on operations and Ramp Controllers at Charlotte Douglas International Airport (CLT). Three conditions were compared: Baseline, with no surface metering, instructions to meet advisory times at the gate only, and instructions to meet advisory times at the gate as well as the times at the scheduled taxiway spot, where aircraft are delivered to Air Traffic Control (ATC). Results showed increased compliance for taxiway spot times when compliance was first met for gate advisories. Instructing Ramp Controllers to meet advisory times at the gate improves spot time compliance and therefore surface scheduling predictability at CLT. Results also demonstrated there was increased compliance overall with gate and spot times in the second condition. This was likely due to higher Ramp Controller workload in the third condition.

Airport surface scheduling

Scheduling Improvements Following the Phase 1 Field Evaluation of the ATD-2 Integrated Arrival, Departure, and Surface Concept

NASA is conducting the Airspace Technology Demonstration-2 (ATD-2) to evaluate an Integrated Arrival, Departure, and Surface (IADS) traffic management system that extends traffic sequencing for the entire life-cycle of a flight from departure gate to arrival gate within multi-airport, metroplex environments. After development and testing in human-in-the-loop simulations, the IADS system was deployed to Charlotte Douglas International Airport for a three-year field evaluation. From the initial IADS concept development through the end of the Phase 1 field evaluation many lessons were learned with regards to the IADS scheduler. In this paper we describe how data from the Phase 1 field evaluation helped identify scheduler improvements and guided the implementation of refinements. The improvements in the IADS scheduler described in this paper are incorporated into the IADS Phase 2 scheduler enabling strategic Surface Metering Programs and will be evaluated during the field evaluation.

Airspace Technology Demonstration-2

Scheduling Improvements Following the Phase 1 Field Evaluation of the ATD-2 Integrated Arrival, Departure, and Surface Concept

NASA is conducting the Airspace Technology Demonstration-2 to evaluate an Integrated Arrival, Departure, and Surface (IADS) traffic management system that extends traffic sequencing for the entire life-cycle of a flight from departure gate to arrival gate within multi-airport, metroplex environments. After development and testing in human-in-the-loop simulations, the IADS system was deployed to Charlotte Douglas International Airport for a three-year field evaluation. From the initial IADS concept development through the end of the Phase 1 field evaluation many lessons were learned with regards to the IADS scheduler. In this paper we describe how data from the Phase 1 field evaluation helped identify scheduler improvements and guided the implementation of refinements. The improvements in the IADS scheduler described in this paper are incorporated into the IADS Phase 2 scheduler enabling strategic Surface Metering Programs and will be evaluated during the field evaluation.

Coupe, William J.

Prediction of Pushback Times and Ramp Taxi Times for Departures at Charlotte Airport

When optimizing the takeoff sequence and schedule for departures at busy airports, it is important to accurately predict the taxi times from gate to runway because those are used to calculate the earliest possible takeoff times. Several airports like Charlotte Douglas International Airport show relatively long taxi times inside the ramp area with large variations, with respect to the travel times in the airport movement area. Also, the pushback process times have not been accurately modeled so far mainly due to the lack of accurate data. The recent deployment of the integrated arrival, departure, and surface traffic management system at Charlotte airport by NASA enables more accurate flight data in the airport surface operations to be obtained. Taking advantage of this system, actual pushback times and ramp taxi times from historical flight data at this airport are analyzed. Based on the analysis, a simple, data-driven prediction model is introduced for estimating pushback times and ramp transit times of individual departure flights. To evaluate the performance of this prediction model, several machine learning techniques are also applied to the same dataset. The prediction results show that the data-driven prediction model is as good as the machine learning algorithms when comparing various prediction performance metrics.

Lee, Hanbong

Prediction of Pushback Times and Ramp Taxi Times for Departures at Charlotte Airport

When optimizing the takeoff sequence and schedule for departures at busy airports, it is important to accurately predict the taxi times from gate to runway because those are used to calculate the earliest possible takeoff times. Several airports like Charlotte Douglas International Airport show relatively long taxi times inside the ramp area with large variations, with respect to the travel times in the airport movement area. Also, the pushback process times have not been accurately modeled so far mainly due to the lack of accurate data. The recent deployment of the integrated arrival, departure, and surface traffic management system at Charlotte airport by NASA enables more accurate flight data in the airport surface operations to be obtained. Taking advantage of this system, actual pushback times and ramp taxi times from historical flight data at this airport are analyzed. Based on the analysis, a simple, data-driven prediction model is introduced for estimating pushback times and ramp transit times of individual departure flights. To evaluate the performance of this prediction model, several machine learning techniques are also applied to the same dataset. The prediction results show that the data-driven prediction model is as good as the machine learning algorithms when comparing various prediction performance metrics.

airport surface operations

Assessment of Ramp Times (ART 2) Human-In-The-Loop (HITL) Simulation - Final Results

Airspace Technology Demonstration 2 (ATD-2) sub-project conducted a human-in-the-loop (HITL) simulation to assess various strategies for Ramp controllers to deliver aircraft to the spot at a specified time. Results show that the rate of compliance with the spot time improved when Ramp controllers first complied with a gate hold advisory for pushing aircraft off the gates. Results also show that Ramp controller workload was lower when they only had to focus on complying with the gate hold advisories.

Stevens, Lindsay K.

Performance Evaluation of Conflict-Free Trajectory Taxiing in Airport Ramp Area Using Fast-Time Simulations

The German Aerospace Center (DLR) and the National Aeronautics and Space Administration (NASA) have been collaborating to conduct joint research addressing future surface traffic management challenges. The surface management tool from DLR, called Taxi Routing for Aircraft: Creation and Controlling (TRACC), was adapted to be integrated in NASA's fast-time simulation environment called Surface Operations Simulator and Scheduler (SOSS). The research described in this paper 1) applied TRACC to trajectory-based ramp traffic management, where TRACC generates conflict-free aircraft trajectories in a congested ramp area, 2) investigated the feasibility of the concept through the integrated TRACC-SOSS fast-time simulation, and 3) evaluated the performance of the integrated system. For this activity, TRACC was adapted for ramp operations at Charlotte Douglas International Airport, called TRACC_PB (TRACC for pushback optimization). TRACC_PB provides four-dimensional taxi trajectories with a command speed profile for each aircraft following standard taxi routes within the ramp area. In this study, departures are given the Target Movement Area entry Times (TMATs) provided by the baseline surface metering scheduler based on NASA's Spot and Runway Departure Advisor (SARDA). TRACC_PB also calculates optimal pushback times for departures, as well as the times when arrivals shall enter the ramp, the Target Movement area Exit Times (TMETs). The initial results showed that the TRACC_PB successfully generated conflict-free trajectories for the ramp area taxi operations and improved taxiing efficiency compared to the baseline results. TRACC_PB aimed to provide conflict-free taxi routes avoiding any stops while taxiing. This resulted in longer gate hold times for departures and postponed throughput values compared to the baseline simulation without trajectory optimization. Having conflict-free routes without stoppage also created shorter taxi times but required renegotiation of the given TMATs. TRACC_PB also achieved reductions in both fuel consumption and engine emissions (17% for departures and 10% for arrivals), which correlate with the ramp taxi time reduction.

trajectory-based taxi operations

Tactical Surface Metering Procedures and Information Needs for Charlotte Douglas International Airport

NASA has been working with the FAA and aviation industry partners to develop and demonstrate new concepts and technologies that integrate arrival, departure, and surface traffic management capabilities. In the fall of 2017, NASA began deployment of their technologies in a phased manner to assist with the integrated surface and airspace operations at Charlotte Douglas International Airport (Charlotte, NC). Initial technologies included a tactical surface metering tool and data exchange elements between the airline-controlled ramp and Federal Aviation Administration controlled ATC Tower. In this paper, we focus on the procedures associated with the tactical surface metering tool used in the ramp control tower. This tool was first calibrated in Human-In-the-Loop simulations and was further developed when it was used in the operational world. This paper describes the collaborative procedures that the users exercised in their respective operational worlds to enable surface metering and how several metrics were used to improve the metering algorithm.

Human Factors

Tactical Surface Metering Procedures for Charlotte Douglas International Airport

NASA has been collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for the Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. The primary goal of the ATD-2 project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments while maintaining or improving throughput by enhancing and integrating arrival, departure and surface prediction, scheduling, and management systems. In the Phase 1 Baseline IADS Demonstration, the tactical surface scheduling capability and the user interfaces for ramp controllers and ramp traffic managers were implemented for ramp operations. The purpose of the tactical surface scheduling capability is to provide the airline ramp controller with aircraft pushback advisories that prevent surface congestion and to respond to surface and airspace constraints that become known over relatively short time horizons. For this purpose, the tactical surface metering tool first estimates the capacity of current and near-future runway resources from flight schedule and surveillance data. With demand forecasts and predicted taxi trajectories, this tool computes an efficient runway schedule of aircraft in the planning horizon based on their readiness, Earliest Off-Block Times (EOBTs), and a ration by schedule (RBS) rule. Details on the implementation of the Tactical Surface Metering tool will be provided in the full paper. Both pushback and recommended hold times advisories provided by this surface metering tool are shown on the user interfaces for the ramp controller and the ramp traffic manager, called Ramp Traffic Console (RTC) and Ramp Manager Traffic Console (RMTC), respectively. There is excess queue time in the system due to demand capacity imbalance, this time can be taken as a hold on the runway queue or at the gate and was referred to as the Metering Value. This metering value can be adjusted by the Ramp Manager in collaboration with Air Traffic Controller-Tower Traffic Management Coordinator (TMC). They selected a set of metering values as default values for the tool during human-in-the-loop simulation. As the metering value increases, there is a decrease in the gate hold and increase in the queue time at the runway. Procedures and Information needs related to managing the surface metering procedures were researched in the simulated environment. These procedures will be compared to the procedures adopted at Charlotte Douglas International Airport when the tools were deployed and adopted in November 2017 for one departure push bank per day. Feedback regarding initial issues, information needs such as the need to see EOBTs on the flight data tags and how they compare to scheduled times will also be discussed in the full paper. Initial results will be provided regarding the choice of the metering value and how it was adjusted on a daily basis and what procedures evolved will also be presented in the paper.