Improved resistive plate chambers for HL-LHC upgrade of CMS
Not Available
Engineering topics
Publications and source records attributed to Lee, K. S..
Not Available
Not Available
During Run2 the high instantaneous luminosity, up to 2.2 · 10 34 cm -2 s -1 , lead to a substantial hit rate in the Compact Muon Solenoid experiment’s muon chambers due to multiple background sources to physics processes sought for at LHC. In this article we will describe the analysis method devised to measure and identify the contributions to such background in the Resistive Plate Chambers. Thorough understanding of the background rates provides the base for the upgrade of the muon detectors for the High-Luminosity LHC.
During Run-3, the LHC is preparing to deliver instantaneous luminosity in the range from 5 × 10 34 cm -2 s -1 to 7.5 × 10 34 cm -2 s -1 . To ensure stable data taking, providing redundant information for robust muon triggering, reconstruction and identification, the CMS RPC collaboration has used the opportunity given by the LHC long shutdown 2 (LS2), to perform a series of maintenance and preparation activities for the new data taking period. The overall performance of the RPC system after the LS2 commissioning period and the activities in preparation for future data taking will be presented.
With the HL-LHC upgrade of the LHC machine, an increase of the instantaneous luminosity by a factor of five is expected and the current detection systems need to be validated for such working conditions to ensure stable data taking. At the CERN Gamma Irradiation Facility (GIF++) many muon detectors undergo such studies, but the high gamma background can pose a challenge to the muon trigger system which is exposed to many fake hits from the gamma background. A tracking system using RPCs is implemented to clean the fake hits, taking profit of the high muon efficiency of these chambers. This work will present the tracking system configuration, used detector analysis algorithm and results.
In pursuit of the elusive mechanism of high-T C superconductors (HTSC), spectroscopic imaging scanning tunneling microscopy (SI-STM) is an indispensable tool for surveying local properties of HTSC. Since a conventional STM utilizes metal tips, which allow the examination of only quasiparticles and not superconducting (SC) pairs, Josephson tunneling using STM has been demonstrated by many authors in the past. An atomically resolved scanning Josephson tunneling microscopy (SJTM), however, was realized only recently on Bi 2 Sr 2 CaCu 2 O 8+x (Bi-2212) below 50 mK and on the Pb(110) surface at 20 mK. Here we report the atomically resolved SJTM on Bi 2 Sr 2 CaCu 2 O 8+x at 4.2 K using Bi-2212 tips created in situ. The I-V characteristics show clear zero bias conductance peaks following Ambegaokar-Baratoff (AB) theory. A gap map was produced for the first time using an atomically resolved Josephson critical current map I C (r) and AB theory. Surprisingly, we found that this new gap map is anticorrelated to the gap map produced by a conventional method relying on the coherence peaks. Quasiparticle resonance due to a single isolated zinc atom impurity was also observed by SJTM, indicating that atomically resolved SJTM was achieved at 4.2 K. Lastly, our result provides a starting point for realizing SJTM at even higher temperatures, rendering possible investigation of the existence of SC pairs in HTSC above the T C .
In order to study its wet natural frequency (in water) and dry frequency (in air), we conducted a two-year measurement campaign by deploying a full-scale prototype tidal current turbine system. A theoretical model is validated, and reveals the measured wet natural frequency of the device could be 54.6% of the dry frequency. Among short-term physics, inflow turbulence is important in the excitation of system resonances that can lead to fatigue damage and system failure. Among long-term physics, the wet natural frequency is highly dependent on tidal constituents, the semi-diurnal tides (M2 and S2) and diurnal tides (K1 and O1).