Using GIS analytics and social preference data to evaluate utility-scale solar power site suitability
Not Available
Engineering topics
Publications and source records attributed to Lee, Randy.
Not Available
There is a need for a spatial decision support application that allows users to create customized metrics for comparing proposed locations of a new solar installation. This document discusses how PVMapper was designed to overcome the customization problem through the development of loosely coupled spatial and decision components in a JavaScript plugin architecture. This allows the user to easily add functionality and data to the system. The paper also explains how PVMapper provides the user with a dynamic and customizable decision tool that enables them to visually modify the formulas that are used in the decision algorithms that convert data to comparable metrics. The technologies that make up the presentation and calculation software stack are outlined. This document also explains the architecture that allows the tool to grow through custom plugins created by the software users. Some discussion is given on the difficulties encountered while designing the system.
Determining economically viable locations for sola
Evaluating vegetation cover is an important factor in understanding the sustainability of many ecosystems. Methods that have sufficient accuracy and improved cost efficiency could dramatically alter how biotic resources are monitored on both public and private lands. This will be of interest to land managers because there are rarely enough resource specialists or funds available for comprehensive ground evaluations. In this project, unmanned helicopters were used to collect still-frame imagery to assess vegetation cover during May, June, and July in 2005. The images were used to estimate percent cover for six vegetative cover classes (shrub, dead shrub, grass, forbs, litter, and bare ground). The field plots were located on the INL site west of Idaho Falls, Idaho. Ocular assessments of digital imagery were performed using a software program called SamplePoint, and the results were compared against field measurements collected using a point-frame method to assess accuracy. The helicopter imagery evaluation showed a high degree of agreement with field cover class values for litter, bare ground, and grass, and reasonable agreement for dead shrubs. Shrub cover was often overestimated and forbs were generally underestimated. The helicopter method took 45% less time than the field method to set plots and collect and analyze data. This study demonstrates that UAV technology provides a viable method for monitoring vegetative cover on rangelands in less time and with lower costs. Tradeoffs between cost and accuracy are critical management decisions that are important when managing vegetative conditions across vast sagebrush ecosystems throughout the Intermountain West.
A site near the downstream tip of Cascades Island and a mid-level cantilever outfall type were selected for the high flow outfall of the new surface flow juvenile fish bypass at Bonneville Dam’s Second Powerhouse. The new bypass will be a modification of the existing ice and trash sluice chute, which discharges into the tailrace with jet impact on the bottom near a shoreline that predators inhabit. Thus, a new site and type are necessary for this high flow (> 28.3 m3/s) outfall. Technical guidelines on high flow outfall location and design were established and applied during the outfall development process. Critical design parameters included discharge at 150 m3/s, entry velocities approaching 15.2 m/s, and tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two sites – “Range D” 121.9 m straight downstream from the existing outfall and “Range F” 760 m downstream near the tip of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. During successive screening, evaluation, consolidation, and selection stages, professional judgment and quantitative comparisons were used to select two finalists – “Adjustable Cantilever” and “Mid-Level Cantilever.” The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models. The process resulted in selection of a mid-level cantilever with plunge pool at the tip of Cascades Island. The system is scheduled for completion in March 2004.
A comprehensive assessment of the gross power potential of the natural stream water energy resources of the United States was performed using state-of-the-art digital elevation models (DEMs) and geographic information system (GIS) tools. Water energy resource sites (stream segments) assessed in the basic resource assessment were further evaluated to identify which can be developed using a set of feasibility criteria. The gross power potential of each site was refined to determine its developable hydropower potential using a set of development criteria corresponding to a damless low power (less than 1 MWa) or small hydro (between 1 and 30 MWa) project. The methodologies for performing the basic resource assessment and subsequent feasibility assessment are described and the summary results for the nation are presented.