Mars Exploration Rover Heatshield Observation Campaign

For the first time ever, engineers were able to observe a heatshield on the surface of another planet after a successful entry through the atmosphere. A three-week heatshield observation campaign was conducted in December 2004 after the Mars Exploration Rover Opportunity rover exited "Endurance Crater." By utilizing the rover's scientific instruments, data was collected to make a qualitative assessment of the performance of the heatshield. This data was gathered to gain a better understanding of how the heatshield performed during entry through the Martian atmosphere. In addition, this unprecedented look at the heatshield offered engineers the opportunity to assess if any unexpected anomalies occurred. Once a survey of the heatshield debris was completed, multiple targets of interest were chosen for the collection of imaging data. This data was then used to assess the char depth of the thermal protection material, which compared well with computational predictions. Extensive imaging data was collected and showed the main seal in pristine conditions, and no observable indications of structure overheating. Additionally, unexpected vehicle dynamics during the atmospheric entry were explained by the observation of thermal blanket remnants attached to the heatshield.

MER↗

Mars Exploration Rover Mission: Entry, Descent, and Landing System Validation

System validation for a Mars entry, descent, and landing system is not simply a demonstration that the electrical system functions in the associated environments. The function of this system is its interaction with the atmospheric and surface environment. Thus, in addition to traditional test-bed, hardware-in-the-loop, testing, a validation program that confirms the environmental interaction is required. Unfortunately, it is not possible to conduct a meaningful end-to-end test of a Mars landing system on Earth. The validation plan must be constructed from an interconnected combination of simulation, analysis and test. For the Mars Exploration Rover mission, this combination of activities and the logic of how they combined to the system's validation was explicitly stated, reviewed, and tracked as part of the development plan.

system validation↗

Genesis failure investigation report : JPL Failure Review Board, Avionics Sub-Team

On January 7, 2001, the Genesis spacecraft lifted off from Cape Canaveral. Its mission was to collect solar wind samples and return those samples to Earth for detailed analysis by scientists. The mission proceeded successfully for three-and-a-half years. On September 8, 2004, the spacecraft approached Earth, pointed the Sample Return Capsule (SRC) at its entry target, and then fired pyros that jettisoned the SRC. The SRC carried the valuable samples collected over the prior 29 months. The SRC also contained the requisite hardware (mechanisms, parachutes, and electronics) to manage the process of entry, descent, and landing (EDL). After entering Earthas atmosphere, the SRC was expected to open a drogue parachute. This should have been followed by a pyro event to release the drogue chute, and then by a pyro event to deploy the main parachute at an approximate elevation of 6.7 kilometers. As the SRC descended to the Utah landing site, helicopters were in position to capture the SRC before the capsule touched down. On September 8, 2004, observers of the SRCas triumphant return became concerned as the NASA announcer fell silent, and then became even more alarmed as they watched the spacecraft tumble as it streaked across the sky. Long-distance cameras clearly showed that the drogue parachute had not deployed properly. On September 9, 2004, General Eugene Tattini, Deputy Director of the Jet Propulsion Laboratory formed a Failure Review Board (FRB). This board was charged with investigating the cause of the Genesis mishap in close concert with the NASA Mishap Investigation Board (MIB). The JPL-FRB was populated with experts from within and external to the Jet Propulsion Laboratory. The JPL-FRB participated with the NASA-MIB through all phases of the investigation, working jointly and concurrently as one team to discover the facts of the mishap.

solar wind↗

The Mars Exploration Rovers Entry Descent and Landing and the Use of Aerodynamic Decelerators

The Mars Exploration Rovers (MER) project, the next United States mission to the surface of Mars, uses aerodynamic decelerators in during its entry, descent and landing (EDL) phase. These two identical missions (MER-A and MER-B), which deliver NASA s largest mobile science suite to date to the surface of Mars, employ hypersonic entry with an ablative energy dissipating aeroshell, a supersonic/subsonic disk-gap-band parachute and an airbag landing system within EDL. This paper gives an overview of the MER EDL system and speaks to some of the challenges faced by the various aerodynamic decelerators.

Steltzner, Adam↗