Search NASASearch

Engineering topics

Lefever, A. E.

Publications and source records attributed to Lefever, A. E..

High-Ratio Gear Train

Proposed arrangement of two connected planetary differentials results in gear ratio many times that obtainable in conventional series gear assembly of comparable size. Ratios of several thousand would present no special problems. Selection of many different ratios is available with substantially similar gear diameters. Very high gear ratios would be obtained from small mechanism.

Lefever, A. E.

Self-energized screw coupling

Threaded coupling carries its own store of rotational energy. Originally developed to ease task of astronauts assembling structures in space, coupling offers same advantages in other hazardous operations, such as underwater and in and around nuclear reactors. Coupling consists of two parts: crew portion and receptacle. When screw portion is inserted into receptacle and given slight push by operator, trigger pins release ratchet, allowing energy stored in springs to rotate screw into nut in receptacle.

Lefever, A. E.

Space platform utilities distribution study

Generic concepts for the installation of power data and thermal fluid distribution lines on large space platforms were discussed. Connections with central utility subsystem modules and pallet interfaces were also considered. Three system concept study platforms were used as basepoints for the detail development. The tradeoff of high voltage low voltage power distribution and the impact of fiber optics as a data distribution mechanism were analyzed. Thermal expansion and temperature control of utility lines and ducts were considered. Technology developments required for implementation of the generic distribution concepts were identified.

Lefever, A. E.

A mechanical adapter for installing mission equipment on large space structures

A mechanical attachment adapter was designed, constructed, and tested. The adapter was was included in a simulation program that investigated techniques for assembling erectable structures under simulated zero-g conditions by pressure-suited subjects in a simulated EVA mode. The adapter was utilized as an interface attachment between a simulated equipment module and one node point of a tetrahedral structural cell. The mating performance of the adapter, a self-energized mechanism, was easily and quickly demonstrated and required little effort on the part of the test subjects.

Lefever, A. E.

Space construction system analysis. Part 2: Construction analysis

The construction methods specific to the end to end construction process for building the ETVP in low Earth orbit, using the space shuttle orbiter as a construction base, are analyzed. The analyses concerned three missions required to build the basic platform. The first mission involved performing the fabrication of beams in space and assembling the beams into a basic structural framework. The second mission was to install the forward support structure and aft support structure, the forward assembly, and a TT&C antenna. The third mission plan was to complete the construction of the platform and activate it to begin operations in low Earth orbit. The integration of the activities for each mission is described along with the construction requirements and construction logic.

Roebuck, J. A.