Search NASA⌕ Search

Engineering topics

Levak, Daniel

Publications and source records attributed to Levak, Daniel.

Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 2

The Alternate Propulsion Subsystem Concepts contract had five tasks defined for the first year. The tasks were: F-1A Restart Study, J-2S Restart Study, Propulsion Database Development, Space Shuttle Main Engine (SSME) Upper Stage Use, and CER's for Liquid Propellant Rocket Engines. The detailed study results, with the data to support the conclusions from various analyses, are being reported as a series of five separate Final Task Reports. Consequently, this volume only reports the required programmatic information concerning Computer Aided Design Documentation, and New Technology Reports. A detailed Executive Summary, covering all the tasks, is also available as Volume 1.

Levak, Daniel↗

Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 3

The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.

Levak, Daniel↗

Advanced transportation system studies technical area 3: Alternate propulsion system concepts. SSME upper stage use

The main objective was to determine viable methods for starting the Space Shuttle Main Engine (SSME) in an altitude environment and restarting it in an orbit environment with minimum changes in utilization of the engine system or hardware. The study concluded that the use of the SSME in an upper stage is feasible with minimal changes to the engine systems. The altitude start case requires only a change in the valve sequencing during start and reorificing of the ASI lines. Inlet pressures can be moderately low at 40 psia for the LOX and 32 psia for the H2. The orbital restart case adds the need to recirculate propellant and thermal control paint (to keep the turbomachinery inlets cold to minimize the tank pressures needed), and the need to heat two small components (to maintain acceptable mixture ratios during the early part of the start). These actions allow start anytime after approximately 120 minutes. Earlier starts (approximately one hour) are also possible but would require additional component heating for mixture ratio control during the early portion of the start sequence.

Strangeland, Eric↗