Measuring the On-Orbit Clearance between ISS Hardware using Imagery
No abstract available
Engineering topics
Publications and source records attributed to Liddle, Donn.
No abstract available
When photogrammetrists read an article entitled "Photogrammetry in Space" they immediately think of terrestrial mapping using satellite imagery. However in the last 19 years the roll of close range photogrammetry in support of the manned space flight program has grown exponentially. Management and engineers have repeatedly entrusted the safety of the vehicles and their crews to the results of photogrammetric analysis. In February 2010, the Node 3 module was attached to the port side Common Berthing Mechanism (CBM) of the International Space Station (ISS). Since this was not the location at which the module was originally designed to be located on the ISS, coolant lines containing liquid ammonia, were installed externally from the US Lab to Node 3 during a spacewalk. During mission preparation I had developed a plan and a set of procedures to have the astronauts acquire stereo imagery of these coolant lines at the conclusion of the spacewalk to enable us to map their as-installed location relative to the rest of the space station. Unfortunately, the actual installation of the coolant lines took longer than expected and in an effort to wrap up the spacewalk on time, the mission director made a real-time call to drop the photography. My efforts to reschedule the photography on a later spacewalk never materialized, so rather than having an as-installed model for the location of coolant lines, the master ISS CAD database continued to display an as-designed model of the coolant lines. Fast forward to the summer of 2015, the ISS program planned to berth a Japanese cargo module to the nadir Common Berthing Mechanism (CBM), immediately adjacent to the Node 3 module. A CAD based clearance analysis revealed a negative four inch clearance between the ammonia lines and a thruster nozzle on the port side of the cargo vehicle. Recognizing that the model of the ammonia line used in the clearance analysis was "as-designed" rather than "as-installed", I was asked to determine the real clearance between the ammonia lines and expected position of the thruster bell using existing on-orbit imagery. Imagery of the area of interest, taken several years earlier from the Space Shuttle during a fly-around of the ISS, was found and used to set a stereo pair. Space Vision System Targets and Handrail bolts measured in the ISS analytical coordinate system (ISSACS) prior to launch, were used to obtain an absolute orientation so all photogrammetric measurement's would be in the ISSACS coordinate system. Coordinates for the design location of the edges of the thruster bell, when the cargo vehicle was fully berthed to the ISS, were displayed in 3-D relative to the as-installed ammonia lines. This immediately revealed a positive clearance, which was later quantified to be a minimum of 10" +/0.5". The analysis was completed over a single weekend by a single analyst. Using updated imagery, acquired from the station's robotic arm, a complete as-installed model of the coolant lines was generated from stereo photography and replaced the design model in the master ISS CAD database.
In early 2011, the ISS Vehicle Configuration Office began considering the relocation of the Permanent Multipurpose Module (PMM) to the aft facing Common Berthing Mechanism (CBM) on Node 3 to open a berthing location for visiting vehicles on the Node 1 nadir CBM. In this position, computer-aided design (CAD) models indicated that the aft end of the PMM would be only a few inches from the stowed Functional Cargo Block (FGB) port solar array. To validate the CAD model clearance analysis, in the late summer of 2011 the Image Science and Analysis Group (ISAG) was asked to determine the true geometric relationship between the on-orbit aft facing Node 3 CBM and the FGB port solar array. The desired measurements could be computed easily by photogrammetric analysis if current imagery of the ISS hardware were obtained. Beginning in the fall of 2011, ISAG used the Dynamic Onboard Ubiquitous Graphics (DOUG) program to design a way to acquire imagery of the aft face of Node 3, the aft end-cone of Node 1, the port side of pressurized mating adapter 1 (PMA1), and the port side of the FGB out to the tip of the port solar array using cameras on the Space Station Remote Manipulator System (SSRMS). This was complicated by the need to thread the SSRMS under the truss, past Node 3 and the Cupola, and into the space between the aft side of Node 3 and the FGB solar array to acquire more than 100 images from multiple positions. To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which the cameras are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which all of the needed imagery could be acquired. Based on a photogrammetric simulation, it was estimated that the location of the FGB solar array could be measured within an accuracy of about 1 in. in each axis relative to the ISS Analysis Coordinate System (ISSACS). In October 2011, a proposed image-acquisition plan was drafted by ISAG and released for review. The ISS Robotics flight control team (ROBO) proposed minor changes to SPDM positions 1 and 4 to meet ISS proximity requirements. The updated image acquisition plan and draft chit were presented to and approved by the Systems Working Group (SWG) November 18 and were sent to the Vehicle Configuration Board (VCB) in early December 2011. Working with ROBO on 3 successive days (February 21, 22, and 23), ISAG collected 161 images of the ISS. Approximately 40 images were collected from each of the four different SSRMS/SPDM positions, with each set mapping the region from the Node 3 end cone, across Node 1, along the forward port side portion of the FGB, and out the port side FGB solar arrays. From this imagery, the best 80 images were selected for use in the analysis. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for 54 handrail attachment bolts on the aft face of Node 3, in the ISSACS coordinate system. The results of this analysis produced the measured coordinates of 116 points distributed across the face of the FGB solar array panels (see figure 3) along with propagated uncertainty estimates in each coordinate axis. These results were sent to the ISS Vehicle Configuration Office, which sent them to the Configuration Analysis Modeling and Mass Properties (CAMMP) team for comparison with the Russian-provided CAD model for the retracted FGB solar arrays. The CAMMP analysis unexpectedly showed that the measured location of the port FGB solar array was up to 41-in. further outboard than the design and was slightly twisted about its rotational axis. The unexpected comparison results produced some initial concern regarding the accuracy of the photogrammetric measurements. To verify the measured results, ISAG personnel conducted a second analysis using just the imagery of the solar arrays in an arbitrary coordinate system defined by the three corner points of the inboard-most panel, with the design distance between points A1 and A10 as the only scale. The new measurements agreed with the original results to within less than 1 in. RMS in each axis, confirming the original solar array measurements. ISAG produced a final report for the ISS Vehicle Configuration Office documenting an apparent anomaly in the retracted configuration of the port FGB solar arrays. A copy of the measurement report was translated and sent to the Russian Space Agency. During a Vehicle Integrated Performance and Resources (VIPeR) teleconference September 24, 2012, the Russians acknowledged receipt of a translated copy of the ISAG report. The Russian representative stated that the head of the solar array design team claimed that the measured configuration was impossible unless the structure was physically broken. The Russians acknowledged that they had no expertise in photogrammetry, so the analysis technique employed was a "black box" to them, and they did not know how to use the ISAG results. They asked for a single image in which the overextension of the port solar array could be obviously seen. On November 10, 2012, during a face-to-face meeting with their Russian counterparts at JSC, ISAG presented nadir-view imagery of the FGB acquired during Space Shuttle rendezvous. Using the known width of the pressurized portion of the FGB as a scale, this analysis clearly showed that the port FGB solar array was extended outboard further than the Russian design for the retracted solar array.
In response to the planned retirement of the Space Shuttle Program, International Space Station (ISS) management began stockpiling spare parts on the ISS. Many of the larger orbital replacement units were stored on the Expedite the Processing of Experiments to Space Station (EXPRESS) Logistics Carriers (ELCs) mounted on the end of the S3 and P3 truss segments, immediately outboard of the Thermal Radiator Rotary Joints (TRRJs) and their attached radiators. In an August 2009 computer-aided design (CAD) assessment, it was determined that mounting the Cargo Transport Container (CTC) 2 on the inboard face of ELC4 as planned would create insufficient clearance between the CTC2 and the rotational envelope of the radiators when the TRRJs were rotated to a gamma angle of 35.0 degrees. The true clearance would depend on how the Unpressurized Cargo Carrier Attachment System (UCCAS) was mounted to the S3 truss and how the ELC4 was attached to it. If the plane of the UCCAS attachment points were tilted even slightly inboard, it would significantly change the clearance between CTC2 and the Starboard TRRJ (S-TRRJ) radiators. Additionally, since CTC2 would be covered in multilayer insulation (MLI), the true outer profile of CTC2 was not captured in the CAD models used for the clearance assessment. It was possible that, even if the S-TRRJ radiators cleared CTC2, they could snag the MLI covering. In the fall of 2010, the Image Science and Analysis Group (ISAG) was asked to perform an on-orbit clearance analysis to determine the location of CTC2 on ELC4 and the S-TRRJ radiators at the angle of closest approach so that a positive clearance could be assured. To provide the measurements as quickly as possible to aid in the assessment, it was decided that the clearance analysis would be broken into two phases. Phase I: The location and orientation of the UCCAS fittings, which support and hold the ELC4 in place, would be measured relative to the ISS Analytical Coordinate System (ISSACS) as defined by nine preexisting Space Vision System (SVS) targets affixed to the forward/zenith side of the S1 and S3 truss segments. The location of the outboard edge of the S-TRRJ radiator would also be measured when positioned at the angle of closest approach to CTC2 (gamma = 35.0 degrees). This data would allow the Digital Pre-Assembly Group to predict how the ELC4 would sit on the UCCAS and how that would translate into the clearance between CTC2 and the S-TRRJ radiators. Phase II: After the ELC4 was delivered and installed into the UCCAS, the position of the CTC2 mounting plate on the inboard face of ELC4, would be measured in the ISSACS coordinate system relative to the SVS control points used in Phase I. Although CTC2 would not yet be mounted on ELC4, the working envelope of CTC2 could be mathematically added to the measured position of ELC4 to produce a best estimate for CTC2's mounted location. Comparing CTC2's best estimated location to the S-TRRJ radiator (measured in Phase I); relative to the ISSACS coordinate system, would provide a direct measurement of the expected clearance. Due to the impending delivery of ELC4 (scheduled for January 2011), planning for the Phase I clearance analysis began immediately. Using the Dynamic Onboard Ubiquitous Graphics (DOUG) program, ISAG designed a way to acquire images of the SVS control points on truss segments S1 and S3, the aft facing edge of the S-TRRJ Heat Rejection Subsystem (HRS) radiator, and the three UCCAS latch mechanisms mounted on the zenith face of the S3 truss using the Space Station Remote Manipulator System (SSRMS). To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which they are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which the majority of the needed imagery could be acquired. Five additional images would be acquired using the CP-3 external ISS camera mounted on the S1 truss immediately inboard of ELC4. Based on a photogrammetric simulation, it was estimated that the measured location of the HRS radiator and UCCAS latch points would be accurate to about 0.3 in. in each of the three axes relative to ISSACS. Working with ROBO, ISAG collected 78 images of the ISS December 29, 2010. From this imagery, the best 40 were selected for use in the analysis process. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for the nine SVS targets on the S1 and S3 trusses in the ISSACS coordinate system.
A Concept Definition Study (CDS) was conducted to develop a proposed "Lightweight High-Voltage Stretched-Lens Concentrator Solar Array Experiment" under NASA's New Millennium Program Space Technology-6 (NMP ST-6) activity. As part of a multi-organizational team, NASA Langley Research Center's role in this proposed experiment was to lead Structural Characterization of the solar array during the flight experiment. In support of this role, NASA LaRC participated in the CDS to de.ne an experiment for static, dynamic, and deployment characterization of the array. In this study, NASA LaRC traded state-of-the-art measurement approaches appropriate for an in-space, STS-based flight experiment, provided initial analysis and testing of the lightweight solar array and lens elements, performed a lighting and photogrammetric simulation in conjunction with JSC, and produced an experiment concept definition to meet structural characterization requirements.