Search NASA⌕ Search

Engineering topics

Lim, Grace

Publications and source records attributed to Lim, Grace.

Robotics Instrument Deployment System Surface Operations for the InSight Mars Lander

This paper describes NASA’s first successful precision robotics instrument placement and release on another astronomical body since Apollo. This operations breakthrough enabled NASA’s InSight lander to detect the first known ‘marsquake’, a faint trembling of Mars’s surface on 6th April 2019, 128 Martian days after landing on Mars on the 26th November 2018. This is the first quake detected on an astronomical body other than Earth or the Moon. This paper describes the operations of the Robotics Instrument Deployment Systems (IDS) that successfully deployed the InSight science payload to the surface of Mars. The payload includes a seismometer (SEIS), Wind and Thermal Shield (WTS) and Heat Flow and Physical Properties Package (HP3), enabling scientists to perform the first comprehensive surface-based geophysical investigation of Mars’ interior structure. In addition, the paper describes the IDS planning and command sequence generation process used for the successful deployment of SEIS, WTS and HP3 on the surface of Mars. The paper concludes with recommendations based on the experience gained from InSight IDS operations. This includes identified technology gaps in the operations of in-situ manipulators for planetary exploration.

Yen, Jeng↗

InSight Robotic Arm Testing Activities for HP3 Mole Anomaly Recovery on Mars

The InSight lander’s Heat Flow and Physical Properties Package (HP3 ) was deployed on Mars in February 2019 and began attempting to penetrate to its target depth range of 3-5 meters shortly thereafter. However, the mole’s downward progress stopped after only 35 cm of penetration. In response, the project convened an Anomaly Response Team (ART) and since then has been attempting to diagnose the problem and assist the mole using the tools available on Mars. The key asset used in this effort has been the Instrument Deployment System (IDS), which includes two cameras and a robotic Instrument Deployment Arm (IDA). Since the IDS was originally intended only to deploy InSight’s primary instruments to the Martian surface, new testbed setups, experiments, and operational protocols (e.g., command sequences) were required and had to be developed on a short timeline. The HP3 Mole ART first focused on gathering all observable data on Mars about the state of the mole and Support Structure Assembly (SSA), as well as the physical properties of the Martian regolith. This included using the robotic arm to point the IDC (Instrument Deployment Camera) at the SSA during diagnostic hammering attempts to observe motion of the SSA and science tether. Images taken during these attempts revealed some motion of the SSA, but no apparent change in mole depth. At JPL, the IDS and Testbed teams re-created the hardware configuration on Mars based on limited knowledge of the mole’s state. They devised and tested techniques to use the robotic arm and cameras to accomplish previously untested activities on Mars, including imaging the HP3 , using the IDA to interact with the terrain, and using the IDA to move the SSA away from the partially-embedded mole. The team executed the more promising techniques on Mars. After diagnostic hammering on Mars, the team decided to move the SSA to gain visibility of the mole’s configuration and access to the soil around the mole. After developing the technique and practicing the maneuver in the InSight testbed, the team lifted the SSA on Mars and placed it behind the mole. This revealed a pit surrounding the now exposed mole, observations of which provided essential clues for determining the root cause of the mole’s lack of progress. The IDS and Testbed teams altered the testbed to match the situation on Mars. They devised IDA techniques to determine the Martian soil properties and assist the mole’s descent. They tested these techniques in the testbed and executed the more promising ones on Mars. These include using the robotic arm to alter the regolith near the mole and to push on the mole while it hammers. This paper discusses the anomaly resolution testing in the testbed at JPL, describes how the IDS team prepared for the anomaly recovery activities on Mars, and provides preliminary results of the efforts to assist the HP3 mole on Mars.

Kim, Junggon↗

Event-Driven Modeling and Execution of Robotic Activities and Contingencies in the Europa Lander Mission Concept Using BPMN

TRACE (Traceable Robotic Activity Composer and Executive) is a tool designed to address the model-ing, verification, and execution of planned and con-tingent activities during robotic space missions. These activities can be modeled (i.e., planned) graph-ically in TRACE using the Business Process Model and Notation (BPMN) language. This standardized language is used to model a sequence of robotic ac-tivities tied together by logical constructs, events, and time. TRACE includes verification tools to en-sure feasibility before mission models are executed by TRACE’s executive, which is integrated into the autonomy subsystem via a connector. In this paper, we describe TRACE in detail as it would apply to a conceptual Europa Lander surface mission with planned excavation and sample collection activities, as well as, contingency activities when execution is off-nominal—all highlighting our novel use of BPMN as a lingua franca for the pipeline from mis-sion planning to autonomous execution.

Lim, Grace↗

InSight Robotic Arm Testing Activities for HP3 Mole Anomaly Recovery on Mars

The InSight lander’s Heat Flow and Physical Properties Package (HP3) was deployed on Mars in February 2019and began attempting to penetrate to its target depth range of3-5 meters shortly thereafter. However, the mole’s downwardprogress stopped after only 35 cm of penetration. In response,the project convened an Anomaly Response Team (ART) andsince then has been attempting to diagnose the problem andassist the mole using the tools available on Mars. The key assetused in this effort has been the Instrument Deployment System(IDS), which includes two cameras and a robotic InstrumentDeployment Arm (IDA). Since the IDS was originally intendedonly to deploy InSight’s primary instruments to the Martiansurface, new testbed setups, experiments, and operational protocols (e.g., command sequences) were required and had to bedeveloped on a short timeline. The HP3 Mole ART first focusedon gathering all observable data on Mars about the state ofthe mole and Support Structure Assembly (SSA), as well asthe physical properties of the Martian regolith. This includedusing the robotic arm to point the IDC at the SSA duringdiagnostic hammering attempts to observe motion of the SSAand science tether. Images taken during these attempts revealedsome motion of the SSA, but no apparent change in mole depth.At JPL, the IDS and Testbed teams re-created the hardwareconfiguration on Mars based on limited knowledge of the mole’sstate. They devised and tested techniques to use the roboticarm and cameras to accomplish previously untested activitieson Mars, including imaging the HP3, using the IDA to interactwith the terrain, and using the IDA to move the SSA awayfrom the partially-embedded mole. The team executed the morepromising techniques on Mars. After diagnostic hammering onMars, the team decided to move the SSA to gain visibility ofthe mole’s configuration and access to the soil around the mole.After developing the technique and practicing the maneuver inthe InSight testbed, the team lifted the SSA on Mars and placedit behind the mole. This revealed a pit surrounding the nowexposed mole, observations of which provided essential cluesfor determining the root cause of the mole’s lack of progress.The IDS and Testbed teams altered the testbed to match thesituation on Mars. They devised IDA techniques to determinethe Martian soil properties and assist the mole’s descent. Theytested these techniques in the testbed and executed the more978-1-7281-2734-7/20/$31.00 c 2021 IEEE. Copyright 2020 CaliforniaInstitute of Technology. U.S. Government sponsorship acknowledged.promising ones on Mars. These include using the robotic arm toalter the regolith near the mole and to push on the mole while ithammers. This paper discusses the anomaly resolution testing inthe testbed at JPL, describes how the IDS team prepared for theanomaly recovery activities on Mars, and provides preliminaryresults of the efforts to assist the HP3 mole on Mars.

Kim, Junggon↗