Search NASA⌕ Search

Engineering topics

Liu, Chuyu

Publications and source records attributed to Liu, Chuyu.

At least 19 records

An Induction-Type Septum Magnet for the Hadron and Electron Injection of the EIC Complex

The design of the electron Ion Collider (EIC) project is under way to be built at the Brookhaven National Laboratory (BNL) with the collaboration of the Thomas Jefferson National Accelerator Facility (TJNAF). The Rapid Cycling Synchrotron (RCS) which is part of the EIC accelerator complex will accelerate the electron beam up to 18 GeV, and the beam will be injected into the Electron Storage Ring (ESR) to collide with the hadron beam circulating in the Hadron Storage Ring (HSR) which is a modified version of the Relativistic Heavy Ion Collider (RHIC). All three synchrotrons will be located in the same tunnel. This technical note provides information on the latest electromagnetic design of the induction-type septum magnet which will be employed by EIC to Inject the beam into the HSR and RCS and also extract the beam from the RCS.

43 PARTICLE ACCELERATORS↗

The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

Progress on the design of the interaction region of the Electron-Ion Collider EIC

We present an update on the design of the Interaction Region (IR) for the the Electron Ion Collider (EIC) being built at Brookhaven National Laboratory (BNL). The EIC will collide high energy and highly polarized hadron and electron beams with a center of mass energy up to 140 GeV with luminosities of up to 10^34 /cm^2/s. The IR, located at RHIC's IR6, is designed to meet the requirements of the nuclear physics community as outlined in [1]. A second IR is technically feasible but not part of the project.The magnet apertures are sufficiently large to allow desired collision products to reach the far-forward detectors; the electron magnet apertures in the rear direction are chosen to be large enough to pass the synchrotron radiation fan. In the forward direction the electron apertures are large enough for non-Gaussian tails.The paper discusses a number of recent recent changes to the design. The machine free region was recently increased from 9 to 9.5 m to allow for more space in the forward direction for the detector. The superconducting magnets on the forward side now operate at 1.9 K, which helps crosstalk and space issues.

43 PARTICLE ACCELERATORS↗

Design Status of the Electron-Ion Collider

The Electron-Ion Collider is gearing up for "Critical Decision 2", theproject baseline with defined scope, cost and schedule.Lattice designs are beingfinalized, and preliminary component design is being carried out. Beam dynamicsstudies such as dynamic aperture optimization, instability and polarizationstudies, and beam-beam simulations are continuing in parallel. We report onthe latest developments and the overall status of the project, and presentthe plans for future activities.

43 PARTICLE ACCELERATORS↗

DESIGN UPDATE ON THE HSR INJECTION KICKER FOR THE EIC

The Electron-Ion Collider (EIC), the next-generation nuclear science facility, is under the design at the Brookhaven National Laboratory. The present RHIC rings will be reconfigured as the Hadron Storage Ring (HSR) for the EIC. Design of a stripline injection kicker for the HSR for beams with the rigidity of ~ 81 T-m poses some technical challenges due to the expected shorter bunch spacing, heating due to higher peak current and the larger number of bunches, and the required higher pulsed voltage. Recently, we updated its mechanical design to optimize the characteristic and beam coupling impedances. In addition, we incorporated the impedance tuning capability by introducing the kicker aperture adjustment mechanism. Finally, we incorporated high voltage FID feedthroughs (FC26) to this kicker. This paper reports the design and optimization updates of the HSR injection kicker including the impedance tuning capability, optimization of both the characteristic and the beam coupling impedances, and finally the incorporation of a high voltage feedthrough design.

HSR INJECTION KICKER FOR THE EIC∗↗

Gold-gold luminosity increase in RHIC for a beam energy scan with colliding beam energies extending below the nominal injection energy

The Beam Energy Scan phase II (BES-II), performed in the Relativistic Heavy Ion Collider (RHIC) from 2019 to 2021, explored the phase transition between quark-gluon plasma and hadronic gas. BES-II exceeded the goal of a fourfold increase in the average luminosity over that achieved during Beam Energy Scan phase I (BES-I), at five gold beam energies: 9.8, 7.3, 5.75, 4.59, and 3.85 GeV / nucleon. This was accomplished by addressing several beam dynamics effects, including intrabeam scattering, beam-beam, space charge, beam instability, and field errors induced by superconducting magnet persistent currents. Some of these effects are especially detrimental at low energies. BES-II achievements are presented, and the measures taken to improve RHIC performance are described. These measures span the whole RHIC complex, including ion beam sources, injectors, beam lifetime improvements in RHIC, and operation with the world’s first bunched beam Low Energy RHIC electron Cooler (LEReC).

43 PARTICLE ACCELERATORS↗

Preparation for the Beam Energy Scan II at RHIC in 2020

RHIC will provide Au-Au collisions at beam energies of 5.75, 4.59 GeV/nucleon for physics program in 2020, and at beam energy of 3.85 GeV/nucleon for physics program in 2021 as part of the BeamEnergy Scan II (BES-II). The oper- ational experience gained in the first year (2019) of BES-II operation will be applied toward operations in the coming years. This article will present some technical details and the outlook of the BES-II operations in the coming years.

43 PARTICLE ACCELERATORS↗

Improving the luminosity for Beam Energy Scan II at RHIC

The QCD (Quantum Chromodynamics) phase diagram [1], one of the most im-portant graphs in nuclear physics, has many uncharted territories. In particular,the nature of the transformation from Quark-Gluon plasma (QGP) to the stateof Hadronic gas is totally unknown [2]. A beam energy scan [3,4], scanning thephase diagram with variable collision energy, has been conducted at RHIC toexplore the first-order phase transition and determine the location of a possible critical point.

43 PARTICLE ACCELERATORS↗

Experimental study of the persistent current in RHIC superconducting dipole

The first goal [1] of this study is to reduce the high order magnetic component (mostly sextupole component) generated by persistent current in RHIC superconducting dipoles [2]. For Beam Energy Scan Phase II (BES-II) [3,4], reduction of lattice non-linearity is desirable for better beam control and beam lifetime. The sextupole component from RHIC dipole persistent current was too strong to be compensated at low operating current. The store length demonstrated in 2010 low energy operation at 3.85 GeV [5] was 10 minutes partially due to the lattice non -linearity. The measurement and compensation of lattice non-linearity were very difficult with such a short lifetime.

43 PARTICLE ACCELERATORS↗