Challenges and Lessons Learned From Fabrication, Testing, and Analysis of Eight MQXFA Low Beta Quadrupole Magnets for HL-LHC

By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low-beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some of the criteria and were disassembled. Furthermore, lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this article, we present a summary of 1) the fabrication and test data for all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

REBCO -- a silver bullet for our next high-field magnet and collider budget?

High-field superconducting magnets with a dipole field of 16 T and above enable future energy-frontier circular particle colliders. Although we believe these magnets can be built, none exists today. They can also be a showstopper for future high-energy machines due to a prohibitively high price tag based on the current conductor and magnet fabrication cost. The high-temperature superconducting REBCO coated conductor can address both the technical and cost issues, a silver bullet to lay both monsters to rest. The challenges and unknowns, however, can be too arduous to make the silver bullet. We lay out a potential road forward and suggest key action items. As a contribution from the accelerator community, we attempt to clarify for our theorist and experimenter colleagues a few aspects about the future high-field superconducting magnets. We hope to stimulate an effective plan for the 2023 P5 process that can lead to a cost-effective high-field magnet technology for future colliders and the exciting physics they can steward.

43 PARTICLE ACCELERATORS↗

Development and demonstration of next generation technology for Nb_3Sn accelerator magnets with lower cost, improved performance uniformity, and higher operating point in the 12-14 T range

The scope of the proposal outlined in this white paper is the development and demonstration of the technology needed for next generation of Nb_3Sn accelerator magnets in the 12-14 T range. The main goal is to cut magnet cold-mass cost by a factor 2 or higher with respect to the Nb_3Sn magnets produced by the US Accelerator Upgrade Project (AUP) for the High-Luminosity Large Hadron Collider (HL-LHC). This goal will be achieved by significant reduction of labor hours, higher operating point, and improved performance uniformity. A key factor will be automation that will be achieved through industry involvement and benefitting from the experience gained in US national laboratories through the production of the AUP magnets. This partnership will enable the development of a technology that will be easily transferable to industry for mid- and large-scale production of Nb_3Sn accelerator magnets in the 12-14 T range. This step is essential to enable next generation of colliders such as the FNAL-proposed Muon Collider, FCC and other HEP hadron colliders. This is a Directed R&D where direction is given by the field range and industry involvement for high-automation and industry-ready technology. The plan includes ten milestones, to be achieved in 6-8 years at the cost of 5-7 $M/year.

43 PARTICLE ACCELERATORS↗

Lessons Learned From the Prototypes of the MQXFA Low-Beta Quadrupoles for HL-LHC and Status of Production in the US

With the successful test of the first two pre-series magnets the US HL-LHC Accelerator Upgrade Project has started production of the MQXFA magnets to be used in Q1/Q3 inner triplet elements of the HL-LHC. This good start comes after the test of two prototypes with limited performance, and it demonstrates the importance of learning from past issues. Therefore, in this paper we want to share the most important lessons learned so far, focusing on those which may be more interesting for similar projects. Additionally, we will present the status of MQXFA fabrication in the US.

43 PARTICLE ACCELERATORS↗