Search NASA⌕ Search

Engineering topics

Losito, R.

Publications and source records attributed to Losito, R..

Magnets for a Muon Collider—Needs and Plans

We describe the magnet challenges for a Muon Collider, an exciting option considered for the future of particle physics at the energy frontier. Starting from the comprehensive work performed by the US Muon Accelerator Program, we have reviewed the performance specifications dictated by beam physics and the operating conditions to satisfy the accelerator needs. Among the many magnets that make up a muon collider, we have identified four systems that represent well the envelope of challenges: the target and capture solenoid, the final cooling solenoid, the accelerator dipoles and the collider dipoles. These systems provide focus for the development of novel concepts, largely based on HTS for reasons of performance, cost and sustainability. After giving a consolidated overview of the needs for the magnet systems, we describe here the basic technology options considered, and the plan for design and development activities.

43 PARTICLE ACCELERATORS↗

First considerations on the supporting structures of FCC-ee booster and collider in the arc regions

In 2022, the FCC Feasibility Study management mandated a working group to analyse the best configuration of the FCC-ee tunnel in the arc regions, in view of the construction of a mock-up of the arc half-cell. One of the main and most challenging goals of the study, named FCC-ee Arc Half-Cell Mock-up Project, was to perform a preliminary investigation on the principles of supporting the Short-Straight Sections and dipoles of the half-cells, both for the booster and for the collider machines. This is an important input needed for the choice of the best configuration of the relative placement of the booster with respect to the collider. The structural stiffness, mass and stability of the supporting structures must be optimized to minimize the vibrations transmitted/transferred to the magnetic system of the accelerators by elements such as pumps, water cooling system, beam thermomechanical stresses, powering elements, etc. To perform the study, tools such as CAD software, FEM and analytical techniques were employed. This paper summarizes the preliminary design concepts and the results of the simulations performed.

Accelerator Subsystems and Technologies↗

Feasibility of crystal-assisted collimation in the CERN accelerator complex

Bent silicon crystals mounted on high-accuracy angular actuators were installed in the CERN Super Proton Synchrotron (SPS) and extensively tested to assess the feasibility of crystal-assisted collimation in circular hadron colliders. The adopted layout was exploited and regularly upgraded for about a decade by the UA9 Collaboration. The investigations provided the compelling evidence of a strong reduction of beam losses induced by nuclear inelastic interactions in the aligned crystals in comparison with amorphous orientation. A conceptually similar device, installed in the betatron cleaning insertion of CERN Large Hadron Collider (LHC), was operated through the complete acceleration and storage cycle and demonstrated a large reduction of the background leaking from the collimation region and radiated into the cold sections of the accelerator and the experimental detectors. The implemented layout and the relevant results of the beam tests performed in the SPS and in the LHC with stored proton and ion beams are extensively discussed.

43 PARTICLE ACCELERATORS↗

Future Circular Hadron Collider FCC-hh: Overview and Status

The Future Circular Collider (FCC) study was launched as a world-wide international collaboration hosted by CERN. Its goal is to push the field to the next energy frontier beyond LHC, increasing by an order of magnitude the mass of particles that could be directly produced, and decreasing by an order of magnitude the subatomic distances to be studied. The FCC study covers two accelerators, namely, an energy-frontier hadron collider (FCC-hh) and a highest luminosity, high-energy lepton collider (FCC-ee). Both rings are hosted in the same 100 km tunnel infrastructure, replicating the CERN strategy for LEP and LHC, i.e. developing a lepton and a hadron ring sharing the same tunnel. This paper is devoted to the FCC-hh and summarizes the key features of the FCC-hh accelerator design, performance reach, and underlying technologies. The material presented in this paper builds on the conceptual design report published in 2019, and extends it, including also the progress made and the results achieved since then.

43 PARTICLE ACCELERATORS↗