Search NASA⌕ Search

Engineering topics

Loutan, Clyde

Publications and source records attributed to Loutan, Clyde.

Regional Real-Time PV Spinning Reserve Estimator

Curtailed photovoltaic (PV) generation is a zero-marginal-cost spinning reserve that can be used for a number of active power control services. Unlike traditional spinning reserve providers, however, i.e., fossil-fueled generators, which have well-defined operating characteristics, e.g., available headroom or potential high limit (PHL), PV plants have by nature variable and uncertain operating characteristics. To ensure the effective coordination between PV plants and the system operator during an active power control event, accurate knowledge of the PV PHL is essential. It ensures that enough headroom is reserved by the PV plants to deliver the award services in real time and informs feasible dispatch decisions made by the market operator. To tackle this challenge, a novel reference-control grouping-based PV plant reserve estimation method has been proposed by the National Renewable Energy Laboratory under past projects funded by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office. The estimation method separates inverters within a plant into two groups: a control group and a reference group. While the reference group is reserved to operate at its PHL, the control group can be curtailed to provide the grid services. Real-time outputs from the reference inverters are used to estimate the PHL for the whole plant based on the ratio between capacities of the reference group and of the plant. This work further enhances the methodology by (1) improving the model accuracy through machine learning; (2) automating the reference inverter selection through correlation analysis; (3) considering estimation look-ahead windows; and (4) applying to regional spinning reserve estimation. Significant performance improvement has been observed based on real-world data collected by CAISO, Southern Company, and Terabase Energy. Compared with the original scaling method, the newly proposed machine learning-based approach reduces the estimation errors by 30% and 13% at the plant level and region level, respectively. Results obtained from this project are intended to be used by grid operators, market operators, balancing authorities, and PV plant owners and operators to facilitate PV participation in ancillary service markets. Regulators, policymakers, and system planners can also consider the results of this work in their decision-making processes. In addition to the performance improvement on the existing reference-control based grouping method, we also investigated how the variability of PV generation from a single PV inverter can be used to represent the variability of PV generation at the plant level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ensuring System Reliability: Distributed Energy Resources and Bulk Power System Considerations

Rooftop solar energy, storage batteries, and electric vehicles are changing the way people use and produce electricity. These are among the growing set of technologies called distributed energy resources (DERs) because they are typically connected to the utility at the medium-voltage distribution system. In general, the utility distribution system connects substations to homes and businesses. The effect of DE Rs on operating the power grid has been dramatic and exciting, and they provide both challenges and benefits to the entire grid: spanning utilization, distribution, and transmission voltage ranges. The zero-carbon resources among the broader family of DE Rs are critical in complying with state and federal energy policies. This, in turn, has required grid operators, utilities, regulators, consumer advocates, and lawmakers to reach out across traditional domains to engage in the robust dialog and coordination needed to integrate distribution-level resources to the larger high-voltage grid and the networked bulk power systems (BPSs).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Geographic smoothing of solar photovoltaic electric power production in the Western USA

We examined the geographic smoothing of solar photovoltaic generation from 15 utility-scale plants in California, Nevada, and Arizona and from 19 commercial building installations in California. This is the first comparison of geographic smoothing from utility-scale and building-mounted PV and the first examination of solar PV smoothing in this region. Our research questions were (1) how does geographic smoothing of commercial building rooftop PV compare to that of utility scale PV?, (2) is the geographic smoothing found for utility-scale plants the same for the western US as in India?, and (3) how does the geographic smoothing for PV compare to that of wind? By examining the power output of these generators in the frequency domain, we quantified the smoothing obtained by combining the output of geographically separated plants. We found that utility-scale and commercial rooftop plants exhibited similar geographic smoothing, with 10 combined plants reducing the amplitude of fluctuations at 1 h to 18%–28% of those seen for a single plant. We find that combining a few PV sites together reduces fluctuations, but that the point of quickly diminishing returns is reached after ∼5 sites, and that for all the locations and plant sizes considered, PV does not exhibit as much geographic smoothing as is seen for combining wind plants. We present preliminary theoretical arguments for why geographic smoothing of PV plants is less effective than that for wind plants. The slope of the high-frequency part of the PV power spectrum can at best be geographically smoothed (steepen) to an asymptotic spectrum of [Formula: see text]. This limit for PV has considerably less smoothing than that for wind's geographic smoothing, shown theoretically and from observed data to be [Formula: see text].

Klima, Kelly↗

Improving BA Control Performance Through Advanced Regulation Requirements Prediction

The paper presents a comprehensive approach to predict balancing authority (BA) regulation requirements in order to improve BAs control performance. The proposed probabilistic approach takes into account multiple uncertain and time dependent factors affecting the system balance (e.g., wind and solar generation, electrical loads). A set of methods to predict the regulation has been developed: (1) probabilistic analysis of regulation requirements with respect to time of the day, (2) linear or nonlinear regression models linking regulation requirements to different influencing factors, (3) adopting time series forecasting techniques (e.g., autoregressive integrated moving average (ARIMA)) to account for temporal continuity and auto-correlation in the regulation requirements data. Proposed methodology has been tested and validated using actual California Independent System Operator (ISO) data.

Solar Generation, Wind Generation, Area Control Er↗

Benefit Cost Analysis of Improved Forecasting for Day-Ahead Hourly Regulation Requirements

A benefit cost analysis (BCA) of the Day-Ahead Regulation Prediction (DARP) tool found substantial savings to providing an improved forecast of the California Independent System Operators (CAISO) reserve requirements for regulation services with increasing amounts of solar generation. DARP predicts day-ahead reserve requirements for Regulation Up (Reg Up) and Regulation Down (Reg Down) using the balancing authority’s Area Control Error (ACE) and actual frequency. The BCA approach statistically estimated the price-quantity relationships for Reg Up and Reg Down. The estimated changes in Regulation reserve prices along with the estimated changes in day-ahead reserve requirements, forecast by DARP, provide a cost savings estimate. The results indicate that more savings were found for reducing Reg Up than reducing Reg Down purchases. A similar approach may be used to estimate savings from improved forecasting of reserves for other ancillary services, or to estimate benefits from other forecasting tools and methodologies.

Ancillary Services, Benefit Cost Analysis, Frequen↗

Balancing Needs Assessment Using Advanced Probabilistic Forecasts

This paper presents a comprehensive approach to predict Balancing Authority (BA) regulation and load following requirements in order to improve BA control performance. In this paper the Pacific Northwest National Laboratory’s (PNNL) “ramp and uncertainty prediction tool (RUT) and day-ahead regulation prediction (DARP) tool” were upgraded to incorporate advanced probabilistic forecast information provided by AWS Truepower. The proposed methodology has been tested and validated using actual California Independent System Operator (CAISO) data. Simulation confirmed that integration probabilistic forecast information can reduce the predicted regulation range by about 12-31%. This means that BAs can procure fewer balancing resources without compromising their reliability and control performance requirements.

Regulation, Solar Generation, Wind Generation, Con↗