Search NASA⌕ Search

Engineering topics

Lozier, David

Publications and source records attributed to Lozier, David.

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning, and actual results of the the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

The Lunar Prospector Mission: Final Results of Trajectory Design, Quasi-Frozen Orbits, Extended Mission Targeting, and Lunar Topography and Potential Models

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission was NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control will focus on the use of innovative and proven trajectory analysis programs. As part of this effort, the Goddard Space Flight Center and the Ames Research Center became partners in the Lunar Prospector trajectory team to provide the trajectory analysis and orbit determination support. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100-km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered its extended mission phase. The mission orbit was lowered from 100 km to a mean altitude of 40 km. Due to lunar potential effects, the altitude of Lunar Prospector varied from 25 to 55 km above the mean lunar geoid. After one month at 40 km, the lunar potential model was updated based upon the new tracking data at 40 km. On January 15, 1999, the altitude was lowered again to a mean altitude of 30 km. The spherical altitude varied between 15 km and 45 km above the mean lunar geoid while the topographical altitude varied between 10 km and 50 km. Various means were employed to get accurate lunar surface elevation including Clementine altimetry and LOS analysis. Based upon the best available terrain maps, Lunar Prospector reached actual altitudes of 8 km above lunar mountains in the southern polar region. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. At the end of the operations mission, LP was targeted for impact at a chosen location that allowed optical observation of the lunar ejecta as LP ended its mission at 1.6 km/sec. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector nominal and extended mission including maneuver design, eccentricity vs. argument of perigee evolution, topographical altitude estimation, and lunar potential modeling. This paper provides understanding of the quasi-frozen orbit design of the LP mission, the optimization process of lunar orbit targets, the impacts that the selected lunar potential models play, and discusses the feasibility of meeting the mission goals. Observed evolution of the Keplerian orbit elements are compared to the theoretical predictions using the latest lunar potential model available which incorporates the Lunar Prospector Doppler data. Mapping orbit maintenance maneuver design along with results of the actual maneuvers to maintain the orbital requirements are also presented.

Folta, David↗

Lunar prospector mission design and trajectory support

The Lunar Prospector mission is the first dedicated NASA lunar mapping mission since the Apollo Orbiter program which was flown over 25 years ago. Competitively selected under the NASA Discovery Program, Lunar Prospector was launched on January 7, 1998 on the new Lockheed Martin Athena 2 launch vehicle. The mission design of Lunar Prospector is characterized by a direct minimum energy transfer trajectory to the moon with three scheduled orbit correction maneuvers to remove launch and cislunar injection errors prior to lunar insertion. At lunar encounter, a series of three lunar orbit insertion maneuvers and a small circularization burn were executed to achieve a 100 km altitude polar mapping orbit. This paper will present the design of the Lunar Prospector transfer, lunar insertion and mapping orbits, including maneuver and orbit determination strategies in the context of mission goals and constraints. Contingency plans for handling transfer orbit injection and lunar orbit insertion anomalies are also summarized. Actual flight operations results are discussed and compared to pre-launch support analysis.

Lozier, David↗

Lunar Prospector Mission Design

The National Aeronautics and Space Administration (NASA) has selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and will be launched in September 1997. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control will focus on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis and orbit determination support. The mission design of Lunar Prospector is characterized by a direct minimum energy transfer trajectory to the moon with an injection into a circular 100 km altitude polar mapping orbit. The mission design will incorporate the optimization of the reference trajectory for a new launch vehicle. An extended mission includes a periselene altitude approaching 10 km. As part of the navigation, a new lunar potential model will be used that incorporates data from the recent Clementine mission. This paper provides understanding of the design of the Lunar Prospector mission and the optimization process of the nominal trajectory, orbit determination, launch windows, and lunar orbit targets, and discusses the feasibility of meeting the mission goals.

Folta, David↗