Search NASA⌕ Search

Engineering topics

Lu, Xueying

Publications and source records attributed to Lu, Xueying.

Design Initiative for a 10 TeV pCM Wakefield Collider

This document outlines a community-driven Design Study for a 10 TeV pCM Wakefield Accelerator Collider. The 2020 ESPP Report emphasized the need for Advanced Accelerator R&D, and the 2023 P5 Report calls for the ``delivery of an end-to-end design concept, including cost scales, with self-consistent parameters throughout." This Design Study leverages recent experimental and theoretical progress resulting from a global R&D program in order to deliver a unified, 10 TeV Wakefield Collider concept. Wakefield Accelerators provide ultra-high accelerating gradients which enables an upgrade path that will extend the reach of Linear Colliders beyond the electroweak scale. Here, we describe the organization of the Design Study including timeline and deliverables, and we detail the requirements and challenges on the path to a 10 TeV Wakefield Collider.

43 PARTICLE ACCELERATORS↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Summary of Working Group 3: Laser and High-Gradient Structure-Based Acceleration

Accelerating particles at high gradients with high efficiencies is essential for reduction of size and cost of future accelerators for science and industry. This includes a future multi-TeV e+e- collider for particle, free-electron lasers for basic energy sciences and national security, industrial accelerators for energy and environmental applications, and accelerators for other applications. One way to achieve this is to use advanced externally-powered structures, both laser and RF driven. Working Group 3 (WG3) discussed novel accelerating structures with new geometries, new materials, frequencies from microwave to THz and optical spectrum, and operating conditions from room temperature to cryogenic. Presentations included recent advances in understanding RF breakdown and multipactor phenomena at different frequencies and materials, and other physics limitations to the accelerating gradient. Other relevant topics, such as developing high-gradient photoinjectors, high-efficiency RF power sources, and RF structures for a potential muon collider were discussed also. More details on each of the WG3 topics can be found in the articles published in these proceedings.

43 PARTICLE ACCELERATORS↗

Demonstration of sub-GV/m accelerating field in a photoemission electron gun powered by nanosecond 𝑋-band radio-frequency pulses

Radio-frequency (rf) photoemission electron guns operating at higher accelerating gradients offer a pathway to produce brighter electron bunches. Brighter beams are expected to revolutionize many areas of science: they could form the backbone of next-generation compact x-ray free-electron lasers or provide coherent ultrafast quantum electron probes. We report on the experimental demonstration of an rf photoemission electron source supporting an accelerating field close to 400 MV/m at the photocathode surface without major rf breakdown or significant dark current over a 3-week experimental run. This unprecedented gradient was achieved by operating the gun in a new regime with short rf pulses, ~9ns X-band (11.7 GHz). The demonstrated paradigm provides a viable path to form relativistic electron beams with unprecedented brightness.

43 PARTICLE ACCELERATORS↗

An X-Band Ultra-High Gradient Photoinjector

High brightness beams appealing for XFELs and UEM essentially imply a high current and a low emittance. To obtain such beams we propose to raise the accelerating voltage in the gun mitigating repealing Coulomb forces. An ultra-high gradient is achieved utilizing a short-pulse technology. We have designed a room temperature X-band 1,5 cell gun that is able to inject 4 MeV, 100 pC bunches with as low as 0.15 mcm normalized transverse emittance. The gun is operated with as high gradients as 400 MV/m and fed by 200 MW, 10 ns RF pulses generated with Argonne Wakefield Accelerator (AWA) power extractor. We report results of low RF power tests, laser alignment test results, and successful gun conditioning results carried out at nominal RF power.

43 PARTICLE ACCELERATORS↗

A proton beam energy modulator for rapid proton therapy

We present the design for a rapid proton energy modulator with radiofrequency accelerator cavities, which can deliver the proton radiation dose to varied depth in human tissues much faster than traditional mechanical beam energy degraders. The proton energy modulator is designed as a multi-cell 1-m long accelerator working at 2.856 GHz. Each individual accelerator cavity is powered by a 400 kW compact klystron to provide an accelerating/decelerating gradient of 30 MV/m. The high gradient is enabled by the individual power coupling regime, which provides a high shunt impedance. Beam dynamics simulations were performed, showing that the energy modulator can provide ±30 MeV of beam energy change for a 150 MeV, 7 mm long (full length) proton bunch, and the total energy spread of 3 MeV is satisfactory to clinical needs. A prototype experiment of a single cell has been built and tested, and the low-power microwave measurement results agree very well with simulations. The energy modulator is optimized for the 150 MeV cyclotron proton beam, while this approach can work with different beam energies.

47 OTHER INSTRUMENTATION↗

Coherent high-power RF wakefield generation by electron bunch trains in a metamaterial structure

In this paper, we present an experimental study of coherent high-power wakefield generation in a metamaterial (MTM) structure at 11.7 GHz by 65 MeV electron bunch trains at the Argonne Wakefield Accelerator (AWA), following a previous experiment, the Stage-I experiment, at the AWA. Both the Stage-II experiment, reported in this paper, and the Stage-I experiment were conducted using MTM structures, which are all-metal periodic structures with the period being much smaller than the wavelength. Differences between the two experiments include (1) structure length (Stage-I 8 cm and Stage-II 20 cm); (2) number of bunches used to excite the structure (Stage-I with two bunches, up to 85 nC of total charge; Stage-II with eight bunches, up to 224 nC of total charge); and (3) highest peak power measured (Stage-I 80 MW in a 2 ns pulse and Stage-II 380 MW in a 10 ns pulse). High-power radio frequency pulses were generated by reversed Cherenkov radiation of the electron beam due to the negative group velocity in the MTM structures. Because the radiation is coherent, a train of bunches with a proper spacing can build up to achieve a high peak power. The observed output power levels are very promising for future applications in direct collinear wakefield acceleration or in transfer to a second accelerator for two-beam acceleration.

36 MATERIALS SCIENCE↗