Mach, Justin

Publications and source records attributed to Mach, Justin.

Diffusion bonding of tungsten-vanadium-zirconium using vacuum hot pressing for the development of a low decay heat cladding solution for tungsten spallation targets

Tantalum has been used as cladding material for water-cooled solid tungsten targets at many leading spallation neutron production facilities thanks to its high neutron yield, manageable radiation damage behavior, and excellent corrosion/erosion resistance in radiation environments. However, from a safety hazard perspective, thermal neutron capture of tantalum in spallation environments causes a high specific decay heat in the target volume, which often becomes a limiting factor in increasing the beam power on the target. In this paper, we studied vacuum hot pressing (VHP) parameters to diffusion bond zirconium to tungsten to explore the feasibility of using zirconium alloys as an alternative cladding material to tantalum. Zirconium alloys have long been used as cladding material for early generation solid spallation targets, and nuclear fuel rods. In spallation environments zirconium has significantly lower decay heat with shorter decay time compared to tantalum. The hot isostatic pressing (HIP) of zirconium and tungsten is known to produce limited bonding quality due to the formation of the brittle ZrW2 intermetallic layer. To overcome this problem, placing a vanadium interlayer between tungsten and zirconium has been proposed by exploring parameter space in binary alloy phase diagrams. Under the VHP conditions, 860 ◦C at 70 MPa for 4 hours, Zr-V and V-W showed good diffusion bonding, which demonstrates the feasibility of a single step HIP process to make the zirconium alloy clad tungsten spallation volumes.

Lee, Yong Joong↗

Second Target Station Project: LANSCE WNR Target 2 (Blue Room) Experiment 2022

The Second Target Station (STS) at SNS will address emerging scientific challenges by providing a source of intense, cold neutrons to instruments optimized for this source, using rotating, tungsten target blocks. The STS target will receive 1.3 GeV proton beam pulses from the SNS accelerator at a repetition rate of 15 Hz. The facility life is planned for 40 years, and each target assembly life is expected to be approximately 10 years. An accurate strain prediction is then critical for fatigue life assessment of STS target blocks because they will be subject to approximately 108 beam pulses per lifetime. As an R&D activity, the LANSCE WNR Target 2 (blue room) facility was used to test the strain response of prototypical target blocks to the thermal shock of a proton pulse. The blue room was well suited for a pulsed proton beam impact test of subscale STS target blocks; the 800 MeV proton energy is approximately 60% of the 1.3 GeV proton energy expected from the SNS accelerator to the STS. Both the LANSCE Proton Storage Ring (PSR) and SNS are short-pulse proton beam sources with nominal pulse widths of 250 ns and 661 ns, respectively, so the energy deposition in the target occurs in < 1 microsecond pulse duration.

43 PARTICLE ACCELERATORS↗

Model calibration of the liquid mercury spallation target using evolutionary neural networks and sparse polynomial expansions

The mercury constitutive model predicting the strain and stress in the target vessel plays a central role in improving the lifetime prediction and future target designs of the mercury targets at the Spallation Neutron Source. We leverage the experiment strain data collected over multiple years to improve the mercury constitutive model through a combination of large scale simulations of the target behavior and the use of machine learning tools for parameter estimation. We present two interdisciplinary approaches for surrogate-based model calibration of expensive simulations using evolutionary neural networks and sparse polynomial expansions. The newly calibrated simulations achieve 7% average improvement on the prediction accuracy and 8% reduction in mean absolute error compared to previously reported reference parameters, with some individual sensors experiencing up to 30% improvement. The calibrated simulations can aid in fatigue analysis to estimate the mercury target lifetime, which reduces abrupt failure and saves tremendous amount of costs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Modeling Needs for High Power Target

The next generation of high power targets will use more complex geometries, novel materials, and new concepts (like flowing granular materials); however, the current numerical approaches will not be sufficient to converge towards a reliable target design that satisfies the physical requirements. We will discuss what can be improved in the next 10 years in target modeling to support high power (MW class) targets.

43 PARTICLE ACCELERATORS↗

Design and structural assessment of the Spallation Neutron Source 2.0 MW target

The Proton Power Upgrade (PPU) project is underway at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory. The project will double the proton accelerator power from 1.4 MW to 2.8 MW, increase power to the First Target Station (FTS), and enable a future Second Target Station (STS). The power increase partly comes from raising proton energy from 1.0 GeV to 1.3 GeV. The STS will operate at 0.7 MW at 15 Hz when completed. Until then, PPU will provide the capability to operate the FTS at 2.0 MW at 60 Hz. Maximum power at the FTS to date has been 1.4 MW at 60 Hz with 1.0 GeV protons. A new mercury target module design to operate reliably under PPU conditions has been completed after a multi-year effort. The design philosophy and assessment of the structural analysis are described here. This target underwent an unprecedented design and analysis process for SNS using the latest engineering techniques and incorporating years of operating lessons and outcomes from R&D to meet structural design criteria. Finally, it also incorporates high-flow gas injection to further mitigate pulse fatigue stresses as well as cavitation damage to the mercury vessel.

47 OTHER INSTRUMENTATION↗