Search NASA⌕ Search

Engineering topics

Macha, K.

Publications and source records attributed to Macha, K..

Performance of Oak Ridge National Laboratory spallation neutron source proton power upgrade cavities and cryomodule production

The Proton Power Upgrade initiative at Oak Ridge National Lab’s Spallation Neutron Source aims to greatly boost the capability of proton beam power. This upgrade involves the integration of seven additional cryomodules, each housing four six-cell high-beta ( β = 0.81 ) superconducting radio frequency cavities. These cavities, manufactured and processed by Research Instruments in Germany, underwent meticulous treatment, including electropolishing as the bulk and final vital step. Upon delivery to Jefferson Lab, a total of 28 cavities for seven cryomodules, along with an additional four cavities for a spare cryomodule, underwent thorough vertical qualification tests, meeting the required specifications. Following cavity tanking and subsequent rf testing, the assembly of eight cryomodules was successfully executed, with all 32 cavities demonstrating compliance with acceptance criteria. The transportation of the cryomodule to SNS for high-power testing in the tunnel yielded exceptional results. Notably, the performance surpassed specifications, in terms of quality factor and accelerating gradient. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

First Results from Two Nb3Sn Cavities Assembled in a CEBAF Quarter Cryomodule

Two 1.5 GHz CEBAF C75-shape 5-cell accelerator cavities were coated with Nb3Sn film using the vapor diffusion technique at Fermilab and Jefferson Lab coating facilities. Both cavities were measured at 4 K and 2 K in the vertical cavity test facility (VCTF) in each lab, then assembled into a CEBAF quarter cryomodule at Jefferson Lab. The cryomodule was tested at 4 K and 2 K in the CryoModule Test Facility (CMTF) at Jefferson Lab. RF test results for both cavities in the cryomodule are similar to those in the qualification test in VTS, with one cavity reaching Eacc = 7.9 MV/m and the other - 13.3 MV/m at 4 K.

Eremeev, G.↗

The Continuous Electron Beam Accelerator Facility at 12 GeV

This review paper describes the energy-upgraded Continuous Electron Beam Accelerator Facility (CEBAF) accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing 88 superconducting cavities that have operated cw at an average accelerating gradient of 20 MV / m . After reviewing the attributes and performance of the previous 6 GeV CEBAF accelerator, we discuss the upgraded CEBAF accelerator system in detail with particular attention paid to the new beam acceleration systems. In addition to doubling the acceleration in each linac, the upgrade included improving the beam recirculation magnets, adding more helium cooling capacity to allow the newly installed modules to run cold, adding a new experimental hall, and improving numerous other accelerator components. We review several of the techniques deployed to operate and analyze the accelerator performance and document system operating experience and performance. In the final portion of the document, we present much of the current planning regarding projects to improve accelerator performance and enhance operating margins, and our plans for ensuring CEBAF operates reliably into the future. For the benefit of potential users of CEBAF, the performance and quality measures for the beam delivered to each of the experimental halls are summarized in the Appendix. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗