SEDSAT 1 Technologies
The original goals of this project were to support the development of SEDSAT 1 for a tethered launch in July of 1997. This specifically required: (1) Monitoring development progress against a comprehensive delivery plan; (2) Incremental development and release of CDS and SEASIS software; (3) Supporting the integration of version 1.0 SEASIS software that will allow minimal autonomous operation without a software reload. These algorithms would include image quality evaluation, attitude determination, and autonomous earth imaging; and (4) Developing software requirements and design for ground segment software, concentrating on command and data download capability; and interface to external development efforts for a more comprehensive software suite to be used after the initial mission. Because of an unfavorable space shuttle safety review of the SEDS-3 tether deployer, and cost and schedule problems in upgrading the deployer, the mission was changed to an independent launch of SEDSAT. The original plan was to do a tether-less deployment from the space shuttle. Since this would have resulted in an unacceptable orbital lifetime, the mission was changed again to a tethered launch from a Delta II in June 1998. As a result of Marshall Space Flight Center's redirection of the SEDS-3 mission away from a tether launch, the whole question of a tether endmass had to be reconsidered. The net result of these multiple changes was twofold. First, we completed work needed to define some aspects of ground software on SEDSAT 1 that would remain constant no matter the launch mode. Second, we developed a set of concepts for using SEDSAT 1 technology to support alternative endmass missions on SEDS-3. Both of these are included.