Publications and source records attributed to Makarov, Yuri.

GRAF-Plan for Vietnam

Evaluates the reserve requirements for power system balancing areas based on variability and uncertainty of load as well as wind and solar generation scenarios. The tool uses minute‐by‐minute site‐specific generation and load information, as well as information from generation and load forecasting algorithms used in the balancing areas. The Balancing‐Plan Tool can be used directly by utility planners and operators to aid in the integration of intermittent renewable resources. The tool provides reserve requirements of various kinds, such as day‐ahead, load following and regulation, as well as estimates the capacity of the generation fleet to provide the require reserves.

Campbell, Allison↗

Coordinated voltage control and reactive power regulation between transmission and distribution systems

Systems and methods are described for coordinating volt-var control between sub-transmission and distribution systems. Distributed energy resources of a distribution system are aggregated into virtual power plants from which reactive power can optimally be dispatched to the sub-transmission system. A sub-transmission controller executes a volt-var AC optimal power flow optimisation function to minimize voltage fluctuations that might otherwise occur when coordinating with a distribution system having distributed energy resources. The distribution system can use a sensitivity matrix for regulating voltage at distribution feeders while fulfilling a transmission or sub-transmission system's demand requests.

Samaan, Nader A.↗

A Framework to Support Generator Ramping Uncertainty Analysis and Visualization

Power system operation requires maintaining a continuous balance between system demand and generation within certain constraints. Traditionally, the balancing processes are based on deterministic models, which do not consider possible random deviations of system generation and load from their predicted values. With the increasing penetration of the renewable generation, unexpected balancing problems can happen due to the deviations. This can result in serious risks to system reliability and efficiency. When the available balancing reserve is not enough to cover the predicted net load range with uncertainty, deficiency of balancing needs occurs. In this case, it is necessary to commit or de-commit additional conventional generators to achieve the desired confidence level for the balancing needs. The framework is built for solving this problem. The ramping tool engine is used to predict additional balancing requirements caused by the variability and uncertainty of the renewable energy, under the constraints of the generation ramping capability and interchange schedule. The web browser- based GUI is used to visualize the data in web-environment, which provides flexibility to allow user to see the ramping outputs in any platform. The GOSS structure provides strong support to allow easy communication between ramping engine, and system inputs, as well as the GUI.

Chen, Yousu↗

Transmission Planning Analysis Tool

Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domain-specific and system-specific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identify weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision-making process or in the offline study environment.

Vyakaranam, Bharat↗

Ramping and Uncertainty Prediction Tool - Analysis and Visualization of Wind Generation Impact on Electrical Grid

RUT software is designed for use by the Balancing Authorities to predict and display additional requirements caused by the variability and uncertainty in load and generation. The prediction is made for the next operating hours as well as for the next day. The tool predicts possible deficiencies in generation capability and ramping capability. This deficiency of balancing resources can cause serious risks to power system stability and also impact real-time market energy prices. The tool dynamically and adaptively correlates changing system conditions with the additional balancing needs triggered by the interplay between forecasted and actual load and output of variable resources. The assessment is performed using a specially developed probabilistic algorithm incorporating multiple sources of uncertainty including wind, solar and load forecast errors. The tool evaluates required generation for a worst case scenario, with a user-specified confidence level.

Etingov, Pavel↗

Demand Response as a System Reliability Resource

The Demand Response as a System Reliability Resource project consists of six technical tasks: • Task 2.1. Test Plan and Conduct Tests: Contingency Reserves Demand Response (DR) Demonstration—a pioneering demonstration of how existing utility load-management assets can provide an important electricity system reliability resource known as contingency reserve. • Task 2.2. Participation in Electric Power Research Institute (EPRI) IntelliGrid—technical assistance to the EPRI IntelliGrid team in developing use cases and other high-level requirements for the architecture. • Task 2.3. Research, Development, and Demonstration (RD&D) Planning for Demand Response Technology Development—technical support to the Public Interest Energy Research (PIER) Program on five topics: Sub-task 1. PIER Smart Grid RD&D Planning Document; Sub-task 2. System Dynamics of Programmable Controllable Thermostats; Sub-task 3. California Independent System Operator (California ISO) DR Use Cases; Sub-task 4. California ISO Telemetry Requirements; and Sub-task 5. Design of a Building Load Data Storage Platform. • Task 2.4. Time Value of Demand Response—research that will enable California ISO to take better account of the speed of the resources that it deploys to ensure compliance with reliability rules for frequency control. • Task 2.5. System Integration and Market Research: Southern California Edison (SCE)—research and technical support for efforts led by SCE to conduct demand response pilot demonstrations to provide a contingency reserve service (known as non-spinning reserve) through a targeted sub-population of aggregated residential and small commercial customers enrolled in SCE’s traditional air conditioning (AC) load cycling program, the Summer Discount Plan. • Task 2.6. Demonstrate Demand Response Technologies: Pacific Gas and Electric (PG&E)—research and technical support for efforts led by PG&E to conduct a demand response pilot demonstration to provide non-spinning reserve through a targeted sub-population of aggregated residential customers enrolled in PG&E’s AC load curtailment program, the Smart AC™ Demand Response Program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗