Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

LCLS-II-HE Cryomodule Testing at Fermilab

22 Linac Coherent Light Source II (LCLS-II) cryomodules were successfully tested at the Cryomodule Test Facility (CMTF) at Fermilab. Following the completion of the LCLS-II testing program, CMTF has shifted to testing cryomodules for the LCLS-II High Energy upgrade (LCLS-II-HE). The first LCLS-II-HE cryomodule, the verification cryomodule (vCM), was successfully tested and verified the readiness of LCLS-II-HE cryomodule testing at CMTF, and production cryomodule testing has begun. Presented here are the production cryomodule test acceptance criteria, testing plan, and cryomodule test results so far.

43 PARTICLE ACCELERATORS↗

PIP-II 800 MeV Proton Linac Beam Pattern Generator

The PIP2 IT Beam Pattern Generator is the system that synchronizes beam injection and the RF systems between the PIP2 LINAC to the Booster. The RF frequencies of these two accelerator systems are not harmonically related. Synchronization is accomplished by controlling two MEBT Beam Choppers, which select 162.5MHz beam bunches from the LEBT and RFQ to produce an appropriate reduced beam bunch pattern that enables bucket-to-bucket transfer to the Booster RF at 46.46MHz (84th harmonic). This chopping pattern also reduces the beam current to an average of 2mA over the Booster injection, matching the Linac nominal beam current. The BPG also generates the RF frequency/phase reference which the Booster will phase lock to during injection. The BPG is fully programmable, allowing for arbitrary beam patterns with adjustable timing parameters, having a fine adjustment resolution of 38ps. The latter is accomplished using digital signal processing techniques. This paper discusses the design of the BPG, its construction, test results, and operational experience after being integrated into the PIP2 IT test accelerator and concludes with a discussion of the system’s performance and future plans.

43 PARTICLE ACCELERATORS↗

Resonance Control System for the PIP-II IT HWR Cryomodule

The HWR (half-wave-resonator) cryomodule is the first one in the superconducting section of the PIP-II LINAC project at Fermilab. PIP-II IT is a test facility for the project where the injector, warm front-end, and the first two superconducting cryomodules are being tested. The HWR cryomodule comprises 8 cavities operating at a frequency of 162.5 MHz and accelerating beam up to 10 MeV. Resonance control of the cavities is performed with a pneumatically operated slow tuner which compresses the cavity at the beam ports. Helium gas pressure in a bellows mounted to an end wall of the cavity is controlled by two solenoid valves, one on the pressure side and one on the vacuum side. The resonant frequency of the cavity can be controlled in one of two modes. A pressure feedback control loop can hold the cavity tuner pressure at a fixed value for the desired resonant frequency. Alternately, the feedback loop can regulate the cavity tuner pressure to bring the RF detuning error to zero. The resonance controller is integrated into the LLRF control system for the cryomodule. The control system design and performance of the resonance control system are described in this paper.

43 PARTICLE ACCELERATORS↗

Performance of the LLRF System for the Fermilab PIP-II Injector Test

PIP-II IT is a test facility for the PIP-II project where the injector, warm front-end, and the first two superconducting cryomodules are being tested. The 8-cavity half-wave-resonator (HWR) cryomodule operating at 162.5 MHz is followed by the 8-cavity single-spoke resonator(SSR1) cryomodule operating at 325 MHz. The LLRF systems for both cryomodules are based on a common SOC FPGA-based hardware platform. The resonance control systems for the two cryomodules are quite different, the first being a pneumatic system based on helium pressure and the latter a piezo/stepper motor type control. The data acquisition and control system can support both CW and Pulsed mode operations. Beam loading compensation is available which can be used for both manual/automatic control in the LLRF system. The user interfaces include EPICS, Labview, and ACNET. Testing of the RF system has progressed to the point of being ready for a 2 mA beam to be accelerated to 25 MeV. The design and performance of the field control and resonance control system operation with beam are presented in this paper.