Search NASA⌕ Search

Engineering topics

Mansfield, Eric

Publications and source records attributed to Mansfield, Eric.

At least 19 records

Vessel and method for solid-liquid separation

Devices, systems, and methods for separating solids from liquids are disclosed. A vessel includes an inlet, a carrier liquid outlet, a product outlet, a purifying section, and a heater. The inlet directs a slurry into the purifying section. The slurry comprises particles of a solid and a carrier liquid. The purifying section preferentially drives the particles of the solid towards a heating zone of the purifying section versus the carrier liquid. This displaces a first portion of the carrier liquid away from the heating zone of the purifying section. The heater heats the slurry. The carrier liquid outlet drives a majority of the carrier liquid out of the vessel. The product outlet is adjacent to the heating zone of the purifying section.

Baxter, Larry↗

Method for concentrating solids and removing solids from a filter medium

Disclosed are methods for concentrating solids and removing solids from a filter medium. The method includes the step of concentrating first particles of a first solid by removing a fluid stream through a filter medium in a filter. At least some of the first particles become blocking particles that block pores of the filter medium. The method also includes the step of inserting second particles of a second solid into the filter. These second particles scrape, vibrate, agglomerate, or a combination thereof along the filter medium, thus dislodging at least a portion of the blocking particles.

Frankman, David↗

Energy-Storing Cryogenic Carbon Capture™ for Utility and Industrial-scale Processes (Final Report)

This project leverages work completed under funding from previous U.S. Department of Energy (DOE) projects and other sources of funding around the Cryogenic Carbon Capture Process™ (CCC). The purpose of this project is to further develop a perturbation of the CCC process that stores energy called the Cryogenic Carbon Capture™ Energy Storing (CCC-ES) process. The successful completion of the tasks in this project has prepared the CCC-ES process for scaling and developed initial plans and a feasibility analysis for an engineering-scale or small-commercial scale system that can store at least 10 MWh of energy. The specific areas of work in this project are: (1) Develop a conceptual, site-specific integrated process flow diagram: Sustainable Energy Solutions (SES) developed a conceptual, site-specific plan including a process flow diagram for integrating CCC-ES at a specific location. The proposed system was based on a typical engineering-scale CCC system designed to capture 30-50 metric tonnes of CO 2 per day (TPD), with modifications and additional changes and equipment put in place to add the energy storage element to the system. The 30-50 TPD scale corresponds to the required 10 MWh of stored energy. This task includes updating simulation software for transient analysis. SES also coordinated with the Jim Bridger Power Plant in Point of Rocks, Wyoming to get site-specific data. Using these data, SES completed site-specific preliminary process flow diagrams, estimated capital and operating costs for the CCC-ES system, and used the upgraded software package to estimate the primary figures of merit. (2) Complete a technoeconomic analysis (TEA): SES completed a full-scale TEA of the CCC-ES system to meet specific success criteria. This TEA used process information from the host site selected above. (3) Technology and data gap assessment for the CCC-ES process: As part of the technology gap assessment, SES performed an assessment of the best alternative energy storage solutions including figures of merit and operational strengths and weaknesses. SES then compared the proposed system with a discussion of how it addresses the weaknesses of alternative systems, showing for example a cost of stored energy at less than $50/MWh and with a roundtrip efficiency of greater than 95%. This assessment includes technical and other risk analyses and technology gaps with research and development needs to commercialize the process by 2030. Finally, work includes a commercialization roadmap/development pathway outlining the major milestones to move to a commercially operating CCC-ES system. (4) Phase II pre-FEED project plan: SES completed a project plan for the Phase II pre-FEED analysis using the same host site as in the Phase I conceptual study.

03 NATURAL GAS↗

Method for removing a foulant from a gas stream without external refrigeration

A process for removing a foulant from a gas stream is disclosed. The gas stream, containing a foulant, is cooled across a first heat exchanger and a second heat exchanger, producing a solid foulant entrained in cryogenic liquid as a foulant slurry, and a foulant-depleted gas stream. The foulant-depleted gas stream is passed through a cryogenic turbine and a first separation vessel, producing a light gas stream and further solid foulant. The solid foulants are recovered by a combination of pressurization, melting, and distillation to produce a liquid foulant product. Heat is recovered from the various streams in the various heat exchangers and the melter.

Baxter, Larry↗

Method for removing a foulant from a gas stream with minimal external refrigeration

A process for removing a foulant from a gas stream. The gas stream is cooled in a series of heat exchangers, causing a portion of the foulant to desublimate and become entrained in a cryogenic liquid. This foulant slurry stream is pressurized, cooled, and separated into a pressurized foulant solid stream and the cryogenic liquid stream. The pressurized foulant solid stream is melted to produce a liquid foulant stream. Heat exchange processes, both internal and external, are provided that close the heat balance of the process. In this manner, the foulant is removed from the gas stream.

Baxter, Larry↗

Apparatus and method for measuring level

A vessel with a cavity for measuring level is disclosed. The vessel includes a differential pressure sensor having a first port and a second port, a reference tube that connects the first port of the differential pressure sensor to a bottom portion of the cavity, and an impulse tube that connects the second port of the differential pressure sensor to an impulse tube ending. At least a portion of the impulse tube extends through the cavity and ends at a fluid inlet. The fluid inlet is located at a level above the reference tube.

42 ENGINEERING↗

Hail tower for gas-vapor separations

A device and process for removing vapors from a gas is disclosed. A tower is provided. Sub-cooled pellets are distributed by the solids distributor across a horizontal cross-section of the tower. A process gas, comprising a product vapor, passes through the gas inlet. The product vapor and the sub-cooled pellets comprise the same material. The product vapor and the sub-cooled pellets agglomerate as the product vapor desublimates onto the sub-cooled pellets, forming product pellets and a vapor-depleted gas. A crushing device, a screening device, and a solids heat exchanger are provided. A portion of the product pellets are recycled as sub-cooled pellets to the solids distributor by crushing and screening the portion of the product pellets to the size distribution of the sub-cooled pellets and cooling the portion of the product pellets to produce the sub-cooled pellets.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Method for separating components using solids producing multi-stage direct and indirect-contact exchange

A process for forming a solid product or products is disclosed. The process is provided with n desublimating exchangers. An exchanger E1 being associated with a first exchanger and an exchanger En being associated with an nth exchanger, n representing the number of exchangers. The n exchangers comprise at least one direct-contact exchanger comprising a contact fluid. A process fluid is passed through the n exchangers in order from E1 through En. The process fluid comprises a product component or components. The solid product or products form from the product component or components in the plurality of exchangers by desublimation. The solid product or products are separated from the process fluid. In this manner, a solid product or products is formed.

36 MATERIALS SCIENCE↗

Method for removal of carbon dioxide from a carrier liquid

A method for removing carbon dioxide from a carrier liquid using a heat exchanger. A carrier liquid, containing carbon dioxide, is heated through the heat exchanger, causing the carbon dioxide to vaporize. The carrier liquid and the carbon dioxide gas pass to a liquid removal vessel. The carrier liquid is removed and the carbon dioxide gas is compressed. The compressed carbon dioxide gas is provided to the heat exchanger, cooling the carbon dioxide gas opposite the carrier liquid, producing a carbon dioxide liquid.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Process for component separation utilizing miscibility depression near a freezing point

A process for separating a mixture of components is disclosed. A liquid mixture is provided to a separation vessel substantially near a temperature at which a product component freezes. The liquid mixture comprises the product component and a carrier component. The product component and the carrier component are essentially immiscible substantially near the temperature. The liquid mixture is separated into two or more phases, the two or more phases comprising a product component-rich liquid phase and a product component-depleted liquid phase. In this manner, a mixture of components is separated.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Apparatus and method for intrachannel defouling of a heat exchanger using induction heaters

An apparatus comprising a heat exchanger and one or more induction heating elements is disclosed. The heat exchanger comprises a coolant side conduit and a process side conduit, the process side conduit being susceptible to fouling by at least partial desublimation, condensation, crystallization, deposition, or combinations thereof of a fouling component of a circulating process fluid. An electrically conductive first metal is disposed adjacent to the process side conduit. The one or more induction heating elements are disposed proximate to the heat exchanger. The one or more induction heating elements are connected to a source of electrical current. When the electrical current flows through the induction heating elements, eddy currents are induced in the first metal, heating the first metal such that the fouling component sublimates, melts, absorbs, or a combination thereof into the circulating process fluid.

42 ENGINEERING↗

Circulating fluidized bed connected to a desublimating heat exchanger

Condensable vapors such as carbon dioxide are separated from light gases in a process stream. The systems and methods employ a circulating fluidized particle bed cooled by an out-bed heat exchanger to desublimate the solid form of condensable vapors from the process stream. Gas and solids may be sorted in a separator, and the solids may then be subcooled in a heat exchanger. The condensable vapors may be condensed on the bed particles or in the heat exchanger while the light gases from the process stream, which are not condensed, form a separated light-gas stream.

Baxter, Larry↗

Separation of components from a fluid by solids production

A method for separating components from a fluid is disclosed. A cooling element is provided and is disposed in contact with a distal side of one or more thermally-conductive surfaces. One or more resistive heating elements are provided and are disposed in contact with or embedded in a proximal side of the one or more thermally-conductive surfaces. A fluid comprising one or more secondary components is provided. The fluid is passed across the one or more thermally conductive surfaces, the one or more secondary components freezing, crystallizing, desublimating, depositing, condensing, or combinations thereof, out of the fluid. The one or more resistive heating elements engage such that the one or more solid secondary components detach and pass out the solids outlet. The one or more resistive heating elements disengage, restarting production of the one or more solid secondary components.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Method for removal of a foulant from a carrier gas in a single vessel using recycled cold solids

A method for removal of a foulant from a carrier gas is disclosed. A solids conveyance device that spans a vessel and a solids coolant system are provided. A cold solid foulant is provided to the solid inlet of the vessel. The carrier gas containing the foulant is provided to the carrier gas inlet of the vessel. The foulant condenses or desublimates onto the recycled solid foulant, forming a foulant-depleted carrier gas and a solid foulant product. The solids conveyance device passes the solid foulant product out of the vessel. The foulant-depleted carrier gas leaves the vessel. The solid foulant product is split into a final solid foulant product and a recycled solid foulant. The recycled solid foulant is cooled through the coolant system to produce the cold solid foulant. In this manner, the foulant is removed from the carrier gas.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Cryogenic Carbon Capture Development (Final Report)

This project extends and leverages the work completed under funding from ARPA-E and other sources by exploring aspects of the Cryogenic Carbon Capture™ (CCC) process and issues discovered during those projects, but that were not within the scope or budget of previous projects or that became apparent during field tests. Our successful completion of the tasks outlined in this project has increased the reliability, efficiency, and scalability of the CCC process and we are better prepared for pilot-scale testing. The first phase of this project improved key areas of the process through iterative design and experiment, culminating with recommendations for improvements to the existing skid-scale system developed under non-federal funding. The second phase of this project implemented the improved unit operations into the Cryogenic Carbon Capture External Cooling Loop (CCC ECL™) skid and field tests the improved system at a coal-fired power plant. The specific areas of work in this project are: Budget Period 1: 1) Selection of the most energy-efficient drying system for ambient-pressure flue gas. Sustainable Energy Solutions, LLC (SES) has successfully demonstrated a dryer that removes bulk water using a low-temperature brine to remove about 99% of the water followed by a mol sieve 3A desiccant dryer to remove the remaining 1% water; 2) Selection and demonstration of efficient solution to fouling due to dissolved CO 2 . SES has tested several commercial heat exchangers that purport to be able to handle fouling issues similar to those experienced in the contact liquid chiller. Replicated tests using the CCC ECL™ skid and dimpled brazed plate heat exchangers demonstrate that quick throttling of refrigerant combined with a burst of clean gas mitigate the fouling caused by CO 2 solubility in contact liquid with only minor increases in parasitic load. SES models indicate that parasitic load would increase by approximately 0.0125 GJ/tonne, an order of magnitude less than what was determined to be the maximum allowable additional parasitic load caused by this system; 3) Selection and demonstration of efficient and scalable solid–liquid separation system. The screw press technology met or exceeded the 70% solids loading benchmark during several test runs exceeding 24 hours on the CCC ECL™ skid. The average solids loading during the entire 50-hour run was 67%. The energy demand for this system is less than 0.1 GJ e /tonne of CO 2 processed; 4) Optimize design and demonstration of patented desublimating heat exchangers. We designed and built a hybrid spray tower that was tested over many hundreds of hours and a 50-hour continuous test run was completed capturing over 0.5 tonne CO 2 /day at >90% capture; (5) Plan for safe dilution of oxygen-depleted, cleaned flue-gas stream. The AERSCREEN simulator developed by the EPA modeled the dispersion of oxygen-depleted flue gas from the CCC process at a commercial plant. The results indicate that this plan effectively mitigates the flue gas hazards; (6) Simulation of and experimental work related to multi-pollutant capture. SES programmed an upgrade to its solid/vapor/liquid equilibrium (SVLE) algorithm. This enables simultaneous modeling of multiple pollutants (i.e., CO 2 , SO x , NO x , Hg, HCl). Budget Period 2; (7) Modify the CCC ECL™ skid for field testing and complete shakedown testing. The plans for modifying the CCC ECL™ skid were finalized and put into place. Shakedown testing of the updated CCC ECL™ skid occurred at SES using closed-loop mode (i.e., using a synthetic flue gas consisting of only N 2 and CO 2 ) and at the Hunter Power Plant using flue gas from the coal-fired boiler. Shakedown testing took longer than expected due to delays in receiving equipment and unexpected equipment performance in the field; (8) Operate the CCC ECL™ skid in the field. Longer testing of the CCC ECL™ skid occurred at the Hunter Power Plant. Multiple tests exceeding 35 hours were completed, with a total of over 600 hours of CO 2 capture completed using flue gas at the Hunter Power Plant with an average CO 2 capture rate of over 91% during those hours. Extensive notes and documentation were acquired informing improved methods for controls, startup, operation, and shut down; (9) Determine figures of merit and quantify process improvement. SES defined figures of merit for unit operation performance and overall CCC ECL™ process performance. All figures of merit were achieved or surpassed, except for 500 continuous hours of demonstration at the Hunter Power Plant; (10) Complete an Environmental Health and Safety Risk assessment by a third party. Tri-State completed an Environmental Health and Safety Risk assessment; (11) Update techno-economic analysis with third-party validation. The techno-economic analysis has been completed. It confirms the potential large reduction in energy and cost of the CCC process compared with leading alternatives and that the estimates and estimation techniques are reliable.

20 FOSSIL-FUELED POWER PLANTS↗

Cryogenic Carbon Capture Development Final/Technical Report

This project extends and leverages the work completed under funding from ARPA-E and other sources by exploring aspects of the Cryogenic Carbon Capture™ (CCC) process and issues discovered during those projects, but that were not within the scope or budget of previous projects or that became apparent during field tests. Our successful completion of the tasks outlined in this project has increased the reliability, efficiency, and scalability of the CCC process and we are better prepared for pilot-scale testing. The first phase of this project improved key areas of the process through iterative design and experiment, culminating with recommendations for improvements to the existing skid-scale system developed under non-federal funding. The second phase of this project implemented the improved unit operations into the Cryogenic Carbon Capture External Cooling Loop (CCC ECL™) skid and field tests the improved system at a coal-fired power plant.

20 FOSSIL-FUELED POWER PLANTS↗

Air-sparged hydrocyclone for cryogenic gas vapor separation

An air-sparged hydrocyclone for separating a vapor from a carrier gas is disclosed. The cyclone comprises a porous sparger covered by an outer gas plenum. A cryogenic liquid is injected to a tangential feed inlet at a velocity that induces a tangential flow and a cyclone vortex in the air-sparged hydrocyclone. The carrier gas is injected into the cyclone through the porous sparger. The vapor dissolves, condenses, desublimates, or a combination thereof, forming a vapor-depleted carrier gas and a vapor-enriched cryogenic liquid. The vapor-depleted carrier gas is drawn through a vortex finder and the vapor-enriched cryogenic liquid is drawn through an apex nozzle outlet. In this manner, the vapor is removed from the carrier gas.

Baxter, Larry↗

Hydrocyclone for cryogenic gas-vapor separation

A hydrocyclone for separating a vapor from a carrier gas is disclosed. The hydrocyclone comprises one or more nozzles. A cryogenic liquid is injected to a tangential feed inlet at a velocity that induces a tangential flow and a cyclone vortex in the hydrocyclone. The carrier gas is injected into the cryogenic liquid, causing the vapor to dissolve, condense, desublimate, or a combination thereof, forming a vapor-depleted carrier gas and a vapor-enriched cryogenic liquid. The vapor-depleted carrier gas is drawn through a vortex finder and the vapor-enriched cryogenic liquid is drawn through an apex nozzle outlet. In this manner, the vapor is removed from the carrier gas.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗