Search NASA⌕ Search

Engineering topics

Marhauser, Frank

Publications and source records attributed to Marhauser, Frank.

At least 37 records · Page 2

Advance Additive Manufacturing Method for SRF Cavities of Various Geometries

An alternative fabrication method for superconducting radio frequency (SRF) cavities is presented. The novel fabrication method, based on 3D printing (or additive manufacturing, AM) technology capable of producing net-shape functional metallic parts of virtually any geometry, promises to greatly expand possibilities for advance cavity and end-group component designs. A description of the AM method and conceptual cavity designs are presented along with material analysis and RF measurement results of additively manufactured niobium samples.

Frigola, P.↗

Calculations for RF Cavities with Dissipative Material

3D simulations have been performed for a variety of SRF cavities which incorporate Higher Order Mode dampers, either in form of coaxial couplers or waveguide dampers. Instead of utilizing the rather standard approach of matching the output port of the dampers with a broadband coaxial or waveguide port, dissipative materials are modelled for RF field absorption. This for instance not only avoids the otherwise required definition of the number of modes considered for damping, which has an impact on the computational time, but also allows tailoring the load material to conform with experimental data of e.g. non-perfect absorbers. The new calculation scheme is presented. Findings are partially compared with those achieved with the standard waveguide port approach by means of external quality factors. CPU speeds are briefly discussed for both approaches.

Marhauser, Frank↗

Cavity Procurement and Qualification Plan for LCLS-II

The LCLS-II project aims to build 35 accelerating cryomodules, which are based on the European XFEL design but modified for operation in CW mode. Each cryomodule houses eight TESLA-style nine-cell superconducting radio-frequency cavities. The activities to assemble the first two prototype cryomodules are ongoing at FNAL and JLab. 264 cavities worth of cavities for the remaining 33 cryomodules will be procured from two industrial vendors in similar quantity considering the option to produce spares. The assembly of cavities into the production cryomodules will be distributed among FNAL (16 cryomodules) and JLab (17 cryomodules). In this paper the cavity procurement and qualification plan for the LCLS-II project is detailed.

Marhauser, Frank↗

Procurements for LCLS-II Cryomodules at Jlab

The Thomas Jefferson National Accelerator Facility is currently engaged, along with several other DOE national laboratories, in the Linac Coherent Light Source II project (LCLS II). The SRF Institute at Jefferson Lab will be building 1 prototype and 17 production cryomodules based on the TESLA / ILC / XFEL design. Each cryomodule will contain eight nine cell cavities with coaxial power couplers operating at 1.3 GHz. Procurement of components for cryomodule construction has been divided amongst partner laboratories in a collaborative manner. JLab has primary responsibility for six procurements include the dressed cavities, cold gate valves, higher-order-mode (HOM) and field probe feedthroughs, beamline bellows cartridges, cavity tuner assemblies and HOM absorbers. For procurements led by partner laboratories, JLab collaborates and provides technical input on specifications, requirements and assembly considerations. This paper will give a detailed description of plans and status for JLab procurements.

Daly, Edward F.↗

Supression of Upstream Field Emission in RF Accelerators

So-called elec­tron load­ing is the pri­mary cause for cav­ity per­for­mance lim­i­ta­tions in mod­ern RF ac­cel­er­at­ing cav­i­ties. In su­per­con­duct­ing RF cav­i­ties in par­tic­u­lar, the onset of par­a­sitic elec­tron ef­fects may start at field lev­els as low as a few MV/m. Elec­tron load­ing can be at­trib­uted to mainly three phe­nom­ena: field emis­sion, mul­ti­ple im­pact elec­tron am­pli­fi­ca­tion, and RF elec­tri­cal break­down. Field emis­sion has been a per­sis­tent issue de­spite ad­vances in SRF tech­nol­ogy, whereas RF elec­tri­cal break­down and mul­ti­pact­ing can be con­trolled by ap­pro­pri­ate cav­ity de­sign choices. Field emis­sion be­comes a major con­cern when the elec­trons emit­ted are cap­tured by the ac­cel­er­at­ing RF field and di­rected along the beam axis through a se­ries of cav­i­ties or even en­tire cry­omod­ules. Con­se­quently, elec­trons can ac­cu­mu­late en­ergy com­pa­ra­ble to that of the main beam over sim­i­lar dis­tances. This can rep­re­sent a con­sid­er­able dark cur­rent, which can travel down­stream or up­stream de­pend­ing on the field-emit­ting site of ori­gin. In this paper, a method is pre­sented that can sig­nif­i­cantly sup­press the up­stream field emis­sion by de­sign.

Marhauser, Frank↗

The Transfer of Improved Cavity Processing Protocols to Industry for LCLS-II: N-Doping and Electropolishing

Based on the R&D efforts of colleagues at FNAL, Cornell, and JLab, the LCLS-II project adopted a modification to the rather standard niobium SRF cavity surface processing protocol that incorporates a high temperature diffusion doping with nitrogen gas. This change was motivated by the resulting higher Q0 and the prospect of significantly lower cryogenic heat load for LCLS-II. JLab is responsible for managing the cavity procurement for the LCLS-II project. The first phase of the procurement action is to transfer the nitrogen-doping protocol to the industrial vendors. We also seek to exploit improvements in understanding of the niobium electropolishing process as part of the production processing of the TESLA-style LCLS-II cavities. We report on the technology transfer activities and progress toward the envisaged performance demonstration of vendor-processed cavities.

Reece, Charles E.↗

Investigation of differential surface removal due to electropolishing at JLab

Surface chemistry carried out for Superconducting Radio Frequency (SRF) cavities such as Buffered Chemical Polishing (BCP) and Electropolishing (EP) aims to uniformly remove the internal surface of a cavity along the entire structure and within each cell from equator to iris in order to obtain an equally etched surface. A uniform removal, however, is not readily achievable due to the complex fluid flow and varying temperatures of the acid mixture, which can lead to differential etching. This needs to be considered when envisaging a certain surface damage removal throughout the interior. The process-specific differential etching influences the target frequency set at the manufacturing stage as well as the field flatness and length of the as-built cavity. We report on analyses of JLab's present EP system using experimental data for six nine-cell cavities that have been processed recently in the frame of the LCLS-II high-Q development plan. In conjunction with numerical simulations, the differential etching and the impact on field flatness is assessed.

43 PARTICLE ACCELERATORS↗

CEBAF Upgrade: Cryomodule Performance And Lessons Learned

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

43 PARTICLE ACCELERATORS↗

Field Emission and Consequences as Observed and Simulated for CEBAF Upgrade Cryomodules

High gamma and neutron radiation levels were monitored at the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory (JLab) after installation of new cavity cryomodules and initial test runs in the frame of the ongoing 12 GeV upgrade program. The dose rates scaled exponentially with cavity accelerating fields, but were independent of the presence of an electron beam in the accelerator. Hence, field emission (FE) is the source of origin. This has led to concerns regarding the high field operation (100 MV per cryomodule) in the future 12 GeV era. Utilizing supercomputing, novel FE studies have been performed with electrons tracked through a complete cryomodule. It provides a principal understanding of experimental observations as well as ways to mitigate FE as best as practicable by identification of problematic cavities.

Marhauser, Frank↗

Muon Beam Helical Cooling Channel Design

The Helical Cooling Channel (HCC) achieves effective ionization cooling of the six-dimensional (6d) phase space of a muon beam by means of a series of 21st century inventions. In the HCC, hydrogen-pressurized RF cavities enable high RF gradients in strong external magnetic fields. The theory of the HCC, which requires a magnetic field with solenoid, helical dipole, and helical quadrupole components, demonstrates that dispersion in the gaseous hydrogen energy absorber provides effective emittance exchange to enable longitudinal ionization cooling. The 10-year development of a practical implementation of a muon-beam cooling device has involved a series of technical innovations and experiments that imply that an HCC of less than 300 m length can cool the 6d emittance of a muon beam by six orders of magnitude. We describe the design and construction plans for a prototype HCC module based on oxygen-doped hydrogen-pressurized RF cavities that are loaded with dielectric, fed by magnetrons, and operate in a superconducting helical solenoid magnet.

Johnson, Rolland↗

Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the project is a doubling of the available beam energy of CEBAF from 6 GeV to 12 GeV. This increase in beam energy will be due primarily to the construction and installation of ten "C100" cryomodules in the CEBAF linacs. The C100 cryomodules are designed to deliver an average 108 MV each from a string of eight seven-cell, electropolished superconducting RF cavities operating at an average accelerating gradient of 19.2 MV/m. The new cryomodules fit in the same available linac space as the original CEBAF 20 MV cryomodules. Cryomodule production started in September 2010. Initial acceptance testing started in June 2011. The first two C100 cryomodules were installed and tested from August 2011 through October 2011, and successfully operated during the last period of the CEBAF 6 GeV era, which ended in May 2012. This paper will present the results of acceptance testing and commissioning of the C100 style cryomodules to date.

43 PARTICLE ACCELERATORS↗

A Two-stage Injection-locked Magnetron for Accelerators with Superconducting Cavities

A concept for a two-stage injection-locked CW magnetron intended to drive Superconducting Cavities (SC) for intensity-frontier accelerators has been proposed. The concept considers two magnetrons in which the output power differs by 15-20 dB and the lower power magnetron being frequency-locked from an external source locks the higher power magnetron. The injection-locked two-stage CW magnetron can be used as an RF power source for Fermilab's Project-X to feed separately each of the 1.3 GHz SC of the 8 GeV pulsed linac. We expect output/locking power ratio of about 30-40 dB assuming operation in a pulsed mode with pulse duration of ~ 8 ms and repetition rate of 10 Hz. The experimental setup of a two-stage magnetron utilising CW, S-band, 1 kW tubes operating at pulse duration of 1-10 ms, and the obtained results are presented and discussed in this paper.

43 PARTICLE ACCELERATORS↗

JLab SRF Cavity Fabrication Errors, Consequences and Lessons Learned

Today, elliptical superconducting RF (SRF) cavities are preferably made from deep-drawn niobium sheets as pursued at Jefferson Laboratory (JLab). The fabrication of a cavity incorporates various cavity cell machining, trimming and electron beam welding (EBW) steps as well as surface chemistry that add to forming errors creating geometrical deviations of the cavity shape from its design. An analysis of in-house built cavities over the last years revealed significant errors in cavity production. Past fabrication flaws are described and lessons learned applied successfully to the most recent in-house series production of multi-cell cavities.

43 PARTICLE ACCELERATORS↗

Preliminary Test Results from 650 MHz Single Cell Medium Beta Cavities for Project X

We have fabricated two single cell 650 MHz {beta}=0.61 cavities of a JLab design, which possibly can be used for the proposed Project X proton linac application. Both cavities were manufactured at JLab from RRR>250 niobium sheet of 4 mm thickness using standard techniques such as deep drawing, electron beam welding, buffered chemical polishing, hydrogen degassing heat treatment, high pressure ultrapure water rinsing and clean room assembly. Initially cavity no. 1 was -- after final surface treatment by buffered chemical polishing (BCP) -- measured without any provisions for stiffening. As expected, the pressure sensitivity and the Lorentz Force detuning coefficients were relatively high; however, the RF performance was very encouraging: the cavity exhibited a Q-value > 10{sup 11} at 1.6K, corresponding to a residual resistance of < 1.5 n{Omega} The initial gradient was limited to E{sub acc} ~ 18 MV/m, limited by field emission. In a subsequent test, the cavity was re-rinsed and stiffened up, resulting in a somewhat improved mechanical behavior, but no improvement in rf performance. The second cavity was also tested twice, before and after low temperature baking. The results from all tests are reported in this contribution.

43 PARTICLE ACCELERATORS↗

COMMISSIONING OF THE SRF SURFACE IMPEDANCE CHARACTERIZATION SYSTEM AT JEFFERSON LAB

Superconducting radio frequency (SRF) technology is widely adopted in particle accelerators. There remain many open questions, however, in developing a systematic understanding of the fundamental behavior of SRF materials, including niobium treated in different ways and various other bulk/thin film materials that are fabricated with different methods under assorted conditions. A facility that can measure the SRF properties of small samples in a range of 0~180 mT surface field and 2~20 K temperature is needed in order to fully answer these questions. The Jefferson Lab surface impedance characterization (SIC) system [1] has been designed to attempt to meet this requirement. It consists of a sapphire-loaded cylindrical Nb TE011 cavity at 7.5 GHz with a 50 mm diameter flat sample placed on a non-contacting end plate and uses a calorimetric technique [2-5] to measure the rf induced heat on the sample. Driving the resonance to a known field on this surface enables one to derive the surface resistance of the small localized area. TE011 mode identification has been done at room temperature and 4 K, and has been compared with Microwave Studio® simulation results. The variable input and transmitted rf couplers have been characterized. Rf loss mechanisms in the SIC system are under investigation. Thermal properties of the calorimeter have been well studied. A second generation calorimeter is being developed to optimize the dynamic range of the system. A prototype VCO phase lock loop system has been used in CW mode. Preliminary tests with bulk Nb samples have been done at <3 mT magnetic field. The presently available hardware is expected to enable up to 20 mT peak magnetic field on the sample, and paths to higher field tests have been identified.

Xiao, Binping↗