Converter/Compressor Building Solid Waste Management Unit (SWMU) #89 Monitoring Well 21 Area Interim Measure Work Plan

This Work Plan details the approach and design for the Interim Measure (IM) to remediate groundwater within the MW21 Area where VOC concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The IM includes in-situ bioremediation via injection of emulsified vegetable oil (EVO) and emulsified zero-valent iron (EZVI). The in-situ bioremediation technology consists of injecting an electron donor substrate into the subsurface to promote microbial breakdown of VOCs. The EVO injections for this IM are designed based on the use of Provectus ERD-CH4, which is a vegetable oil/carbon substrate mixture. The EZVI injections for this IM are designed based on the use of Provectus EZVI-CH4. The IM treatment layout consists of nine injection locations of EVO at approximately 10-foot radius of influence (ROI) and three injections locations of EZVI at approximately 6-foot ROI. The injection method will be direct push using a DPT rig. The overall injection depths range from 7 to 17 ft bls. The 7 ft bls top depth is designed to be 2 ft below the water table to prevent substrates from reaching the top of the water table. Injections are planned to be implemented using 2 ft intervals and will take place using a bottom-up approach to 2 ft below the water table. This work plan further describes the IM design, injection calculations, performance monitoring plan, and provides an injection layout. Revision 1 of this Work Plan includes quarterly performance sampling during Year 1 in accordance with F.A.C. 62-780. These changes are reflected in Section 7 and Table 2 of the Work Plan.

Mark J Jonnet

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34

Pedestal Hazard Abatement and Soil Removal Construction Completion Report for Launch Complex 34, Solid Waste Management Unit CC054, Cape Canaveral Space Force Station, Florida

This Construction Completion Report summarizes the activities associated with implementation of an interim measure (IM) for hazard abatement of the Launch Pedestal and soil removal at Launch Complex 34 (LC34), Cape Canaveral Space Force Station, Florida. The purpose of the hazard abatement IM was to mitigate any continuing source of contamination associated with residual paint on the Launch Pedestal that contained polychlorinated biphenyls (PCBs). Sampling determined that residual PCB concerns were limited to the steel elements on the top-side of the Pedestal, which included the torus ring, feed pipe, down pipes, pipe straps and shields, remaining steel cover plates and bolts, and railing support steel. The IM also mitigated the potential spread of contamination to surrounding areas by removing fallen metal fragments from the concrete launch pad, as well as soil from trenches on the launch pad where PCB-containing paint chips may have accumulated prior to or during Pedestal hazard abatement activities.

Complex 34

Area South of K7-516, SWMU 100 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This Operations, Maintenance, and Monitoring Report documents groundwater interim measure activities from March 30, 2019 through December 31, 2019 at the Area South of K7-516 site located at Kennedy Space Center (KSC), Florida. An air sparge (AS) system consisting of 16 AS wells was installed along the Barge Canal in 2012 to be protective of the Outstanding Florida Waters (OFW). The AS system was expanded in 2015 by installing 40 AS wells to remediate the hot spot (HS) area. Additional expansion activities were performed in 2018 through the installation of eight additional AS wells along the Barge Canal. Currently 24 OFW and 40 HS AS wells are in operation. This report includes performance monitoring events for the OFW and HS areas, along with an annual Interim Groundwater Monitoring (IGWM) event in the Western Area. The 516S site has been designated Solid Waste Management Unit 100 under KSC’s Resource Conservation and Recovery Act Corrective Action program. This document was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011/80KSC019F0068. The OFW and HS AS systems are meeting the performance criteria and IM objectives of preventing contaminant migration and remediating groundwater within the treatment zone. Team consensus was reached to continue operation of the combined OFW and HS AS systems (Meeting Minute 2002-M02, Decisions 2002-D06, D09 and D04). Team consensus was also reached to continue semi-annual OFW performance monitoring and annual monitoring for the IGWM Western Area for the same wells sampled during 2019 events. In the eastern area, MW13, MW14, and MW15 will be reduced from semi-annual to annual frequency. For the HS Area, team consensus was reached to continue the current annual/biennial monitoring program (Meeting Minute 2002-M02, Decisions 2002-D02, D03, D05, D07 and D08).

Patrice L. Lehocky

Air Sparge Pilot Study in the DNAPL Source Zone at Launch Complex 34

Multiple releases of trichloroethene (TCE) occurred at Launch Complex 34 (LC34) between the late 1950s and 1968. A 2007 conceptual site model estimated a 2-acre dense non-aqueous phase liquid (DNAPL) source area with mass in excess of 90,000 pounds, nearly 40 years after termination of launch activities. Located on a barrier island, LC34 currently has no complete exposure pathways and a historical groundwater flow radial from the DNAPL source zone (DSZ), the focus area of this study. The geology at LC34 is classified as Layers 1 through 9 with each layer representing a different lithology. These lithologies contribute to large variations in hydraulic conductivity (1x10-3 cm/sec to 1x10-8 cm/sec) with notable fine-grained units at Layer 4 (sandy clay) and Layer 7 (fine silty sand). Historically, technologies implemented at LC34 have been split vertically based on technology limitations and lithology. Remedial technologies have been evaluated to control and/or remediate the DSZ in the past; however, more aggressive technologies required significant cost and would likely leave considerable mass. Thus, an adaptive site management strategy has been implemented that adopts a treatment train approach which began in 2009 with hydraulic containment via pump and treat to control mass discharge from the DSZ while removing mass as a secondary benefit. Concurrently, hot spot areas in the larger dissolved plume are being treated by air sparging to reduce overall mass and the plume footprint. In 2019, a re-characterization of the DSZ was completed to update conditions in support of implementing more aggressive technologies as part of the treatment train approach. The results showed that the DSZ remained relatively the same size but with a slightly different morphology. Moreover, data showed that the fine-grained units (Layers 4 and 7) are storing most of the remaining mass, with TCE concentrations suggestive of DNAPL extending into Layer 7 (approximately 80 to 100 ft below land surface). Based on the current conditions, more aggressive technologies are still cost prohibitive; therefore, a different approach is warranted to determine the next implementable step in the treatment train. Air sparging is being proposed as a technology alternative based on several factors including lower treatment costs. A pilot study was conducted to test the feasibility of air sparging in the DSZ as the next step in the treatment train for that area.

Launch Complex 34