Search NASASearch

Engineering topics

Markham, Brian L.

Publications and source records attributed to Markham, Brian L..

At least 19 records

Landsat-8 Operational Land Imager On-Orbit Radiometric Calibration

The Operational Land Imager (OLI), the VIS/NIR/SWIR sensor on the Landsat-8 has been successfully acquiring Earth Imagery for more than four years. The OLI incorporates two on-board radiometric calibration systems, one diffuser based and one lamp based, each with multiple sources. For each system one source is treated as primary and used frequently and the other source(s) are used less frequently to assist in tracking any degradation in the primary sources. In addition, via a spacecraft maneuver, the OLI instrument views the moon once a lunar cycle (approx. 29 days). The integrated lunar irradiances from these acquisitions are compared to the output of a lunar irradiance model. The results from all these techniques, combined with cross calibrations with other sensors and ground based vicarious measurements are used to monitor the OLI's stability and correct for any changes observed. To date, the various techniques have other detected significant changes in the shortest wavelength OLI band centered at 443 nm and these are currently being adjusted in the operational processing.

radiometric calibratio

Landsat 9: Status and Plans

The Landsat 9 mission, currently under development and proceeding towards a targeted launch in late 2020, will be very similar to the Landsat 8 mission, launched in 2013. Like Landsat 8, Landsat 9 is a joint effort between NASA and USGS with two sensors, the Operational Land Imager 2 (OLI-2), essentially a copy of the OLI on Landsat 8 and the Thermal Infrared Sensor 2 (TIRS-2), very similar to the TIRS on Landsat 8. The OLI-2, like OLI, provides 14-bit image data, though for Landsat 9, all 14 bits will be retained and transmitted to the ground. The focal plane modules to be used for OLI-2 were flight spares for OLI and are currently being retested by Ball Aerospace. Results indicate radiometric performance comparable to OLI. The TIRS was a class C instrument, with a 3-year design lifetime, and therefore had limited redundancy. TIRS-2 will be a class B instrument, with a 5-year design lifetime, like OLI (and OLI-2), necessitating design changes to increase redundancy. The stray light and Scene Select Mechanism (SSM) encoder problems observed on orbit with TIRS have also instigated a few design changes to TIRS-2. Stray light analysis and testing have indicated that additional baffles in the TIRS-2 optical system will suppress the out-of-field response. The SSM encoder problems have not been definitively traced to a route cause, though conductive anodic filament growth in the circuit boards is suspected. Improved designs for the encoder are being considered for TIRS-2. The spare Focal Plane Array (FPA) from TIRS is planned for use in TIRS-2; FPA spectral and radiometric performance testing is scheduled for September of this year at NASA's Goddard Space Flight Center.

Landsat

Landsat Program

Landsat initiated the revolution in moderate resolution Earth remote sensing in the 1970s. With seven successful missions over 40+ years, Landsat has documented - and continues to document - the global Earth land surface and its evolution. The Landsat missions and sensors have evolved along with the technology from a demonstration project in the analog world of visual interpretation to an operational mission in the digital world, with incremental improvements along the way in terms of spectral, spatial, radiometric and geometric performance as well as acquisition strategy, data availability, and products.

calibration

Radiometric Calibration and Stability of the Landsat-8 Operational Land Imager (OLI)

Landsat-8 and its two Earth imaging sensors, the Operational Land Imager (OLI) and Thermal Infrared Sensor (TIRS) have been operating on-orbit for 2 1/2 years. The OLI radiometric calibration, which is monitored using on-board lamps, on-board solar diffusers, the moon and vicarious calibration techniques has been stable to within 1% over this period of time. The Coastal Aerosol band, band 1, shows the largest change at about 1% over the period; all other bands have shown no significant trend. OLI bands 1- 4 show small discontinuities in response (+0.1% to 0.2%) beginning about 7 months after launch and continuing for about 1 month associated with a power cycling of the instrument, though the origin of the recovery is unclear. To date these small changes have not been compensated for, but this will change with a reprocessing campaign that is currently scheduled for Fall 2015. The calibration parameter files (each typically covering a 3 month period) will be updated for these observed gain changes. A fitted response to an adjusted average of the lamps, solar and lunar results will represent the trend, sampled at the rate of one value per CPF.

radiometry

Landsat-8 Thermal Infrared Sensor (TIRS) Vicarious Radiometric Calibration

Launched in February 2013, the Landsat-8 carries on-board the Thermal Infrared Sensor (TIRS), a two-band thermal pushbroom imager, to maintain the thermal imaging capability of the Landsat program. The TIRS bands are centered at roughly 10.9 and 12 micrometers (Bands 10 and 11 respectively). They have 100 m spatial resolution and image coincidently with the Operational Land Imager (OLI), also on-board Landsat-8. The TIRS instrument has an internal calibration system consisting of a variable temperature blackbody and a special viewport with which it can see deep space; a two point calibration can be performed twice an orbit. Immediately after launch, a rigorous vicarious calibration program was started to validate the absolute calibration of the system. The two vicarious calibration teams, NASA/Jet Propulsion Laboratory (JPL) and the Rochester Institute of Technology (RIT), both make use of buoys deployed on large water bodies as the primary monitoring technique. RIT took advantage of cross-calibration opportunity soon after launch when Landsat-8 and Landsat-7 were imaging the same targets within a few minutes of each other to perform a validation of the absolute calibration. Terra MODIS is also being used for regular monitoring of the TIRS absolute calibration. The buoy initial results showed a large error in both bands, 0.29 and 0.51 W/sq m·sr·micrometers or -2.1 K and -4.4 K at 300 K in Band 10 and 11 respectively, where TIRS data was too hot. A calibration update was recommended for both bands to correct for a bias error and was implemented on 3 February 2014 in the USGS/EROS processing system, but the residual variability is still larger than desired for both bands (0.12 and 0.2 W/sq m·sr·micrometers or 0.87 and 1.67 K at 300 K). Additional work has uncovered the source of the calibration error: out-of-field stray light. While analysis continues to characterize the stray light contribution, the vicarious calibration work proceeds. The additional data have not changed the statistical assessment but indicate that the correction (particularly in band 11) is probably only valid for a subset of data. While the stray light effect is small enough in Band 10 to make the data useful across a wide array of applications, the effect in Band 11 is larger and the vicarious results suggest that Band 11 data should not be used where absolute calibration is required.

TIIRS

The Spectral Response of the Landsat-8 Operational Land Imager

This paper discusses the pre-launch spectral characterization of the Operational Land Imager (OLI) at the component, assembly and instrument levels and relates results of those measurements to artifacts observed in the on-orbit imagery. It concludes that the types of artifacts observed and their magnitudes are consistent with the results of the pre-launch characterizations. The OLI in-band response was characterized both at the integrated instrument level for a sampling of detectors and by an analytical stack-up of component measurements. The out-of-band response was characterized using a combination of Focal Plane Module (FPM) level measurements and optical component level measurements due to better sensitivity. One of the challenges of a pushbroom design is to match the spectral responses for all detectors so that images can be flat-fielded regardless of the spectral nature of the targets in the imagery. Spectral variability can induce striping (detector-to-detector variation), banding (FPM-to-FPM variation) and other artifacts in the final data products. Analyses of the measured spectral response showed that the maximum discontinuity between FPMs due to spectral filter differences is 0.35% for selected targets for all bands except for Cirrus, where there is almost no signal. The average discontinuity between FPMs is 0.12% for the same targets. These results were expected and are in accordance with the OLI requirements. Pre-launch testing identified low levels (within requirements) of spectral crosstalk amongst the three HgCdTe (Cirrus, SWIR1 and SWIR2) bands of the OLI and on-orbit data confirms this crosstalk in the imagery. Further post-launch analyses and simulations revealed that the strongest crosstalk effect is from the SWIR1 band to the Cirrus band; about 0.2% of SWIR1 signal leaks into the Cirrus. Though the total crosstalk signal is only a few counts, it is evident in some scenes when the in-band cirrus signal is very weak. In moist cirrus-free atmospheres and over typical land surfaces, at least 30% of the cirrus signal was due to the SWIR1 band. In the SWIR1 and SWIR2 bands, crosstalk accounts for no more than 0.15% of the total signal.

Characterization

Continued Monitoring of Landsat Reflective Band Calibration Using Pseudo-Invariant Calibration Sites

Though both of the current Landsat instruments, Landsat-7 Enhanced Thematic Mapper+ (ETM+) and Landsat-5 Thematic Mapper (TM), include on-board calibration systems, since 2001, pseudo-invariant calibration sites (PICS) have been added to the suite of metrics to assess the instruments calibration. These sites do not provide absolute calibration data since there are no ground measurements of the sites, but in monitoring these PICS over time, the relative calibration can be tracked. The sites used by the Landsat instruments are primarily in the Saharan Desert. To date, the trending from the PICS sites has confirmed that most of the degradation seen in the ETM+ on-board calibration systems is likely not degradation of the instrument, but rather degradation of the calibration systems themselves. However, the PICS data show statistically significant degradation (at 2-sigma) in all the reflective spectral bands of up to -0.22%/year since July 2003. For the TM, the PICS were instrumental in updating the calibration in 2007 and now suggest two bands may require another update. The data show a statistically significant degradation (at 2-sigma) in Bands 1 and 3 of -0.27 and -0.15%/year, respectively, since March 1999. The data filtering and processing methods are currently being reviewed but these PICS results may lead to an update in the reflective band calibration of both Landsat-7 and Landsat-5.

Barsi, Julia A.

The Landsat Data Continuity Mission Operational Land Imager (OLI) Sensor

The Landsat Data Continuity Mission (LDCM) is being developed by NASA and USGS and is currently planned for launch in January 2013 [1]. Once on-orbit and checked out, it will be operated by USGS and officially named Landsat-8. Two sensors will be on LDCM: the Operational Land Imager (OLI), which has been built and delivered by Ball Aerospace & Technology Corp (BATC) and the Thermal Infrared Sensor (TIRS)[2], currently being built and tested at Goddard Space Flight Center (GSFC) with a planned delivery of Winter 2012. The OLI covers the Visible, Near-IR (NIR) and Short-Wave Infrared (SWIR) parts of the spectrum; TIRS covers the Thermal Infrared (TIR). This paper discusses only the OLI instrument and its pre-launch characterization; a companion paper covers TIRS.

Markham, Brian L.

Landsat Data Continuity Mission - Launch Fever

The year 2013 will be an exciting period for those that study the Earth land surface from space, particularly those that observe and characterize land cover, land use, and the change of cover and use over time. Two new satellite observatories will be launched next year that will enhance capabilities for observing the global land surface. The United States plans to launch the Landsat Data Continuity Mission (LDCM) in January. That event will be followed later in the year by the European Space Agency (ESA) launch of the first Sentinel 2 satellite. Considered together, the two satellites will increase the frequency of opportunities for viewing the land surface at a scale where human impact and influence can be differentiated from natural change. Data from the two satellites will provide images for similar spectral bands and for comparable spatial resolutions with rigorous attention to calibration that will facilitate cross comparisons. This presentation will provide an overview of the LDCM satellite system and report its readiness for the January launch.

Irons, James R.

Landsat Data Continuity Mission Expected Instrument Performance

The Landsat Data Continuity Mission (LDCM) is scheduled for a December 2012 launch date. LDCM is being managed by an interagency partnership between NASA and the U.S. Geological Survey (USGS). In order to provide the necessary spectral coverage of the visible through shortwave-infrared (SWIR) and the thermal-infrared (TIR), the satellite will carry two sensors. The Operational Land Imager (OLI) will collect data for nine visible to shortwave spectral bands with a spatial resolution of 30 m (with a 15 m panchromatic band). The Thermal Infrared Sensor (TIRS) will collect coincident image data for two TIR bands with a spatial resolution of 100 m. The OLI is fully assembled and tested and has been shipped by it's manufacturer, Ball Aerospace and Technology Corporation, to the Orbital Sciences Corporation (Orbital) facility where it is being integrated onto the LDCM spacecraft. Pre-launch testing indicates that OLI will meet all performance specification with margin. TIRS is in development at the NASA Goddard Space F!ight Center (GSFC) and is in final testing before shipping to the Orbital facility in January, 2012. The presentation will describe the LDCM satellite instrument systems, present pre-launch performance data for OLI and TIRS, and present simulated images to highlight notable features and expected imaging performance.

Dabney, Philip W.

Thermal Infrared Radiometric Calibration of the Entire Landsat 4, 5, and 7 Archive (1982-2010)

Landsat's continuing record of the thermal state of the earth's surface represents the only long term (1982 to the present) global record with spatial scales appropriate for human scale studies (i.e., tens of meters). Temperature drives many of the physical and biological processes that impact the global and local environment. As our knowledge of, and interest in, the role of temperature on these processes have grown, the value of Landsat data to monitor trends and process has also grown. The value of the Landsat thermal data archive will continue to grow as we develop more effective ways to study the long term processes and trends affecting the planet. However, in order to take proper advantage of the thermal data, we need to be able to convert the data to surface temperatures. A critical step in this process is to have the entire archive completely and consistently calibrated into absolute radiance so that it can be atmospherically compensated to surface leaving radiance and then to surface radiometric temperature. This paper addresses the methods and procedures that have been used to perform the radiometric calibration of the earliest sizable thermal data set in the archive (Landsat 4 data). The completion of this effort along with the updated calibration of the earlier (1985 1999) Landsat 5 data, also reported here, concludes a comprehensive calibration of the Landsat thermal archive of data from 1982 to the present

Schott, John R.

The Landsat Data Continuity Mission Operational Land Imager: Pre-Launch Performance

The Operational Land Imager(OLI) will be the main instrument on Landsat-8 when it launches in 2012. OLI represents a generational change from heritage Landsat instruments in its design but must maintain data continuity with the 30+ year Landsat data archive. As a result, OLI has undergone a stringent calibration and characterization campaign to ensure its characteristics are understood and consistent with past instruments. This paper presents an overview of the OLI design, its major differences from previous Landsat instruments, and a summary of its expected performance.

Markham, Brian L.

Spectral Analysis of the Primary Flight Focal Plane Arrays for the Thermal Infrared Sensor

Thermal Infrared Sensor (TIRS) is a (1) New longwave infrared (10 - 12 micron) sensor for the Landsat Data Continuity Mission, (2) 185 km ground swath; 100 meter pixel size on ground, (3) Pushbroom sensor configuration. Issue of Calibration are: (1) Single detector -- only one calibration, (2) Multiple detectors - unique calibration for each detector -- leads to pixel-to-pixel artifacts. Objectives are: (1) Predict extent of residual striping when viewing a uniform blackbody target through various atmospheres, (2) Determine how different spectral shapes affect the derived surface temperature in a realistic synthetic scene.

Montanaro, Matthew

Landsat-7 ETM+: 12 years On-Orbit Reflective-Band Radiometric Performance

The Landsat-7 ETM+ sensor has been operating on orbit for more than 12 years and characterizations of its performance have been ongoing over this period. In general, the radiometric performance of the instrument has been remarkably stable: (1) Noise performance has degraded by 2% or less overall, with a few detectors displaying step changes in noise of 2% or less, (2) Coherent noise frequencies and magnitudes have generally been stable, though the within-scan amplitude variation of the 20kHz noise in bands 1 and 8 disappeared with the failure of the scan line corrector and a new similar frequency noise (now about 18kHz) has appeared in two detectors in band 5 and increased in magnitude with time, (3) Bias stability has been better than 0.25 DN out of a normal value of 15 DN in high gain, (4) Relative gains, the differences in response between the detectors in the band, have generally changed by 0.1% or less over the mission, with the exception of a few detectors with a step response change of 1% or less and (5) Gain stability averaged across all detectors in a band, which is related to the stability of the absolute calibration, has been more stable than the techniques used to measure it. Due to the inability to confirm changes in the gain (beyond a few detectors that have been corrected back to the band average), ETM+ reflective band data continues to be calibrated with the pre-launch measured gains. In the worst case some bands may have changed as much as 2% in uncompensated absolute calibration over the 12 years.

Markham, Brian L.

The Landsat Data Continuity Mission Operational Land Imager (OLI) Radiometric Calibration

The Operational Land Imager (OLI) on the Landsat Data Continuity Mission (LDCM) has a comprehensive radiometric characterization and calibration program beginning with the instrument design, and extending through integration and test, on-orbit operations and science data processing. Key instrument design features for radiometric calibration include dual solar diffusers and multi-lamped on-board calibrators. The radiometric calibration transfer procedure from NIST standards has multiple checks on the radiometric scale throughout the process and uses a heliostat as part of the transfer to orbit of the radiometric calibration. On-orbit lunar imaging will be used to track the instruments stability and side slither maneuvers will be used in addition to the solar diffuser to flat field across the thousands of detectors per band. A Calibration Validation Team is continuously involved in the process from design to operations. This team uses an Image Assessment System (IAS), part of the ground system to characterize and calibrate the on-orbit data.

Markham, Brian L.

Twenty-Five Years of Landsat Thermal Band Calibration

Landsat-7 Enhanced Thematic Mapper+ (ETM+), launched in April 1999, and Landsat-5 Thematic Mapper (TM), launched in 1984, both have a single thermal band. Both instruments thermal band calibrations have been updated previously: ETM+ in 2001 for a pre-launch calibration error and TM in 2007 for data acquired since the current era of vicarious calibration has been in place (1999). Vicarious calibration teams at Rochester Institute of Technology (RIT) and NASA/Jet Propulsion Laboratory (JPL) have been working to validate the instrument calibration since 1999. Recent developments in their techniques and sites have expanded the temperature and temporal range of the validation. The new data indicate that the calibration of both instruments had errors: the ETM+ calibration contained a gain error of 5.8% since launch; the TM calibration contained a gain error of 5% and an additional offset error between 1997 and 1999. Both instruments required adjustments in their thermal calibration coefficients in order to correct for the errors. The new coefficients were calculated and added to the Landsat operational processing system in early 2010. With the corrections, both instruments are calibrated to within +/-0.7K.

Barsi, Julia A.

Summary of Current Radiometric Calibration Coefficients for Landsat MSS, TM, ETM+, and EO-1 ALI Sensors

This paper provides a summary of the current equations and rescaling factors for converting calibrated Digital Numbers (DNs) to absolute units of at-sensor spectral radiance, Top-Of- Atmosphere (TOA) reflectance, and at-sensor brightness temperature. It tabulates the necessary constants for the Multispectral Scanner (MSS), Thematic Mapper (TM), Enhanced Thematic Mapper Plus (ETM+), and Advanced Land Imager (ALI) sensors. These conversions provide a basis for standardized comparison of data in a single scene or between images acquired on different dates or by different sensors. This paper forms a needed guide for Landsat data users who now have access to the entire Landsat archive at no cost.

Chander, Gyanesh

Landsat Data Continuity Mission Calibration and Validation

The primary payload for the Landsat Data Continuity Mission (LDCM) is the Operational Land Imager (OLI), being built by Ball Aerospace and Technologies, under contract to NASA. The OLI has spectral bands similar to the Landsat-7 ETM+, minus the thermal band and with two new bands, a 443 nm band and 1375 nm cirrus detection band. On-board calibration systems include two solar diffusers (routine and pristine), a shutter and three sets of internal lamps (routine, backup and pristine). Being a pushbroom opposed to a whiskbroom design of ETM+, the system poses new challenges for characterization and calibration, chief among them being the large focal plane with 75000+ detectors. A comprehensive characterization and calibration plan is in place for the instrument and the data throughout the mission including Ball, NASA and the United States Geological Survey, which will take over operations of LDCM after on-orbit commissioning. Driving radiometric calibration requirements for OLI data include radiance calibration to 5% uncertainty (1 q); reflectance calibration to 3% uncertainty (1 q) and relative (detector-to-detector) calibration to 0.5% (J (r). Driving geometric calibration requirements for OLI include bandto- band registration of 4.5 meters (90% confidence), absolute geodetic accuracy of 65 meters (90% CE) and relative geodetic accuracy of 25 meters (90% CE). Key spectral, spatial and radiometric characterization of the OLI will occur in thermal vacuum at Ball Aerospace. During commissioning the OLI will be characterized and calibrated using celestial (sun, moon, stars) sources and terrestrial sources. The USGS EROS ground processing system will incorporate an image assessment system similar to Landsat-7 for characterization and calibration. This system will have the added benefit that characterization data will be extracted as part of the normal image data processing, so that the characterization data available will be significantly larger than for Landsat-7 ETM+.

Markham, Brian L.