Search NASA⌕ Search

Engineering topics

Markley, L.

Publications and source records attributed to Markley, L..

Thruster Placement Issues and Possible Mitigation Methods for the ST-7 Disturbance Reduction System

The Space Technology-7 Disturbance Reduction System is being designed to demonstrate the ability to shield a test mass from non-gravitational forces. In order to meet this goal, two advanced technologies will be employed: a highly sensitive Gravitational Reference Sensor and micro-Newton thrusters. ST-7 is limited to two clusters of four thrusters, which are sufficient to provide control for 6 degrees of freedom, but the overall effectiveness of the baseline configuration is limited by the noise on the measurement signals and the thrust outputs, the disturbance force caused by solar radiation pressure, and the performance of the individual thrusters. This paper presents and discusses these issues in greater detail along with possible mitigation methods.

Hsu, O.↗

Hubble Space Telescope Servicing Mission 3A Rendezvous Operations

The Hubble Space Telescope (HST) hardware complement includes six gas bearing, pulse rebalanced rate integrating gyros, any three of which are sufficient to conduct the science mission. After the loss of three gyros between April 1997 and April 1999 due to a known corrosion mechanism, NASA decided to split the third HST servicing mission into SM3A, accelerated to October 1999, and SM3B, scheduled for November 2001. SM3A was developed as a quick turnaround 'Launch on Need' mission to replace all six gyros. Loss of a fourth gyro in November 1999 caused HST to enter Zero Gyro Sunpoint (ZGSP) safemode, which uses sun sensors and magnetometers for attitude determination and momentum bias to maintain attitude stability during orbit night. Several instances of large attitude excursions during orbit night were observed, but ZGSP performance was adequate to provide power-positive sun pointing and to support low gain antenna communications. Body rates in ZGSP were estimated to exceed the nominal 0.1 deg/sec rendezvous limit, so rendezvous operations were restructured to utilize coarse, limited life, Retrieval Mode Gyros (RMGs) under Hardware Sunpoint (HWSP) safemode. Contingency procedures were developed to conduct the rendezvous in ZGSP in the event of RMGA or HWSP computer failure. Space Shuttle Mission STS-103 launched on December 19, 1999 after a series of weather and Shuttle-related delays. After successful rendezvous and grapple under HWSP/RMGA, the crew changed out all six gyros. Following deploy and systems checkout, HST returned to full science operations.

Lee, S.↗