Pu-238 Production At Idaho National Laboratory
Overview of INL's work on Pu-238 production presented to MFC Strategic Advisory Council (SAC). Discusses program status, upcoming work, and future planned activities.
Engineering topics
Publications and source records attributed to Marlow, Ryan L.
Overview of INL's work on Pu-238 production presented to MFC Strategic Advisory Council (SAC). Discusses program status, upcoming work, and future planned activities.
Idaho National Laboratory (INL) has an ongoing effort to produce Pu-238 for NASA deep space missions. Recent work at INL has consisted of irradiation of Pu 238 production targets in the Advanced Test Reactor (ATR), generating more than an estimated 400 grams of Pu-238 heat source material between March and October 2023. Additionally, INL began qualifying Pu-238 production targets with a higher loading of Np-237 to further increase the production of Pu-238 production in later years. INL has also updated the analysis as a result of operational changes at ATR. One instance was updating the analysis to enable a single Pu-238 production target to be run in ATR’s South Flux Trap (SFT), rather than the previous seven production targets, to make use of a spare target from a discontinued design. Higher lobe powers in ATR were also analyzed due to potential changes in planned lobe powers.
Idaho National Laboratory (INL) has an ongoing effort to produce Pu-238 for NASA deep space missions. Recent work at INL has consisted of irradiation of Pu 238 production targets in the Advanced Test Reactor (ATR), generating more than an estimated 400 grams of Pu-238 heat source material between March and October 2023. Additionally, INL began qualifying Pu-238 production targets with a higher loading of Np-237 to further increase the production of Pu-238 production in later years. INL has also updated the analysis as a result of operational changes at ATR. One instance was updating the analysis to enable a single Pu-238 production target to be run in ATR’s South Flux Trap (SFT), rather than the previous seven production targets, to make use of a spare target from a discontinued design. Higher lobe powers in ATR were also analyzed due to potential changes in planned lobe powers.
The Department of Energy (DOE), in partnership with its national laboratories and the National Aeronautics and Space Administration (NASA), is responsible to produce Pu-238 isotope in the United States for use in space exploration. Major activities in the DOE complex are focused at Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL). INL is responsible for storing Np-237 feedstock, irradiation qualification in the Advanced Test Reactor (ATR), and irradiating targets containing Np-237 to produce Pu-238. ORNL is responsible for target design, target fabrication, irradiation qualification in HFIR, and processing of targets to extract Pu-238 heat source material. A key part of the program lifecycle is moving irradiated targets from INL to ORNL. The BEA Research Reactor (BRR) cask was identified as a potential shipping cask for the transport of both unirradiated and irradiated targets between the project sites. This paper will discuss the production at INL and shipment of Pu-238 to ORNL using the BRR cask.
US Department of Energy (DOE), in partnership with the National Aeronautics and Space Administration (NASA), needs to produce Pu-238 for space exploration Major activities are focused at Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) Key part of program is movement of targets between INL and ORNL BEA Research Reactor (BRR) package licensed for transport of unirradiated and irradiated targets
Idaho National Laboratory (INL) has continued to qualify irradiation positions in the Advanced Test Reactor (ATR) for Pu-238 production to support NASA deep space missions. Over the past year, INL qualified Np-237 targets for ATR’s North East Flux Trap (NEFT), inner A, and H positions. Work has begun to requalify the South Flux Trap (SFT) and qualify the East Flux Trap (EFT) for the ATR GEN I target and is midway through the qualification process. This paper gives an overview of operational and technical activities from February 2022 to December 2022.
Idaho National Laboratory (INL) has continued to qualify irradiation positions in the Advanced Test Reactor (ATR) for Pu-238 production to support NASA deep space missions. Over the past year, INL qualified Np-237 targets for ATR’s North East Flux Trap (NEFT), inner A, and H positions. Work has begun to requalify the South Flux Trap (SFT) and qualify the East Flux Trap (EFT) for the ATR GEN I target and is midway through the qualification process. This paper gives an overview of operational and technical activities from February 2022 to December 2022.
Idaho National Laboratory has completed irradiation of Np-237 targets in the Advanced Test Reactor’s (ATR) South Flux Trap (SFT) and I-7 positions. INL also progressed qualification of new ATR Gen 1 Np-237 targets for the North East Flux Trap (NEFT), inner A, and H positions. This slide show is based upon artifact INL/CON-22-65729-Rev000 and gives an overview of operational and technical activities from March 2021 to February 2022.
Idaho National Laboratory has completed irradiation of Np-237 targets in the Advanced Test Reactor’s (ATR) South Flux Trap (SFT) and I-7 positions. INL also progressed qualification of new ATR Gen 1 Np-237 targets for the North East Flux Trap (NEFT), inner A, and H positions. This paper gives an overview of operational and technical activities from March 2021 to February 2022.
The Plutonium Fuel Services (PFS) program at Idaho National Laboratory (INL) is active in the qualification of irradiation targets containing Np-237 for irradiation in the Advanced Test Reactor (ATR) to produce Pu-238 for future NASA missions. INL qualified and loaded 7 targets in ATR’s South Flux Trap (SFT) for cycle 169A, which occurred in Spring 2021. This program was reinitiated after two baseline production targets in three positions validated significant production of Pu-238 [ref.1]. The validation model was followed by the PFS-1 experimental test in the ATRC (Critical) facility [ref.2]. This paper outlines the progress and status of the PFS program. The qualification effort, safety analysis, hardware status, and future activities for qualification of an updated target design for use in the ATR will be discussed.
Overview of INL's recent work on Pu-238 production.