Search NASASearch

Engineering topics

Marr, Gregory C.

Publications and source records attributed to Marr, Gregory C..

Propulsion Options for the LISA Mission

The LISA mission is a constellation of three spacecraft operating at 1 AU from the Sun in a position trailing the Earth. After launch, a propulsion module provides the AV necessary to reach this operational orbit, and separates from the spacecraft. A second propulsion system integrated with the spacecraft maintains the operational orbit and reduces nongravitational disturbances on the instruments. Both chemical and electrical propulsion systems were considered for the propulsion module, and this trade is presented to show the possible benefits of an EP system. Several options for the orbit maintenance and disturbance reduction system are also briefly discussed, along with several important requirements that suggest the use of a FEEP thruster system.

Cardiff, Eric H.

Gravity and Nonconservative Force Model Tuning for the GEOSAT Follow-On Spacecraft

The US Navy's GEOSAT Follow-On spacecraft was launched on February 10, 1998 and the primary objective of the mission was to map the oceans using a radar altimeter. Three radar altimeter calibration campaigns have been conducted in 1999 and 2000. The spacecraft is tracked by satellite laser ranging (SLR) and Doppler beacons and a limited amount of data have been obtained from the Global Positioning Receiver (GPS) on board the satellite. Even with EGM96, the predicted radial orbit error due to gravity field mismodelling (to 70x70) remains high at 2.61 cm (compared to 0.88 cm for TOPEX). We report on the preliminary gravity model tuning for GFO using SLR, and altimeter crossover data. Preliminary solutions using SLR and GFO/GFO crossover data from CalVal campaigns I and II in June-August 1999, and January-February 2000 have reduced the predicted radial orbit error to 1.9 cm and further reduction will be possible when additional data are added to the solutions. The gravity model tuning has improved principally the low order m-daily terms and has reduced significantly the geographically correlated error present in this satellite orbit. In addition to gravity field mismodelling, the largest contributor to the orbit error is the non-conservative force mismodelling. We report on further nonconservative force model tuning results using available data from over one cycle in beta prime.

Lemoine, Frank G.

Gravity and Macro-Model Tuning for the Geosat Follow-on Spacecraft

The US Navy's GEOSAT Follow-On (GFO) spacecraft was launched on February 10, 1998 and the primary objective of the mission was to map the oceans using a radar altimeter. The spacecraft tracking complement consisted of GPS receivers, a laser retroreflector and Doppler beacons. Since the GPS receivers have not yet returned reliable data, the only means of providing high-quality precise orbits has been though satellite laser ranging (SLR). The spacecraft has been tracked by the international satellite laser ranging network since April 22, 1998, and an average of 7.4 passes per day have been obtained from US and participating foreign stations. Since the predicted radial orbit error due to the gravity field is two to three cm, the largest contributor to the high SLR residuals (7-10 cm RMS for five day arcs) is the mismodelling of the non-conservative forces, not withstanding the development of a three-dimensional eight-panel model and an analytical attitude model for the GFO spacecraft. The SLR residuals show a clear correlation with beta-prime (solar elevation) angle, peaking in mid-August 1998 when the beta-prime angle reached -80 to -90 degrees. In this paper we discuss the tuning of the non-conservative force model, for GFO and report the subsequent addition of the GFO tracking data to the Earth gravity model solutions.

Lemoine, Frank G.

Janus Trajectory Design

The proposed Janus Discovery Class mission will pass over opposite illuminated hemispheres of the planet Mercury on two successive flybys and will pass over a crater near Mercury's South geographic pole on the third and final flyby. Three probes will be released by the main spacecraft prior to the first Mercury flyby to pass over Mercury's geographic poles and over the anti-Sunward side. The science team wanted to complete the first Mercury flyby within approximately 110 days of launch and the second Mercury flyby within approximately 365 days of launch. A direct trajectory was chosen which met the basic constraints of the science team while meeting the Discovery launch vehicle constraints. The objective of this paper is to serve as an overview of the Janus trajectory design. The proposal submitted in June 1998 provides a comprehensive overview of the Janus mission.

Marr, Gregory C.

Precise Orbit Determination for the GEOSAT Follow-On Spacecraft

The US Navy's GEOSAT Follow-On spacecraft was launched on February 10, 1998 with its primary mission objective to map the oceans using a radar altimeter. The spacecraft tracking complement consists of GPS receivers, a laser retroreflector and Doppler beacons. Since the GPS receivers have not yet returned reliable data, the only means of providing high-quality precise orbits has been though satellite laser ranging (SLR). SLR has tracked the spacecraft since April 22, 1998, and an average of 7 passes per day have been obtained from US and foreign stations. Since the predicted radial orbit error due to the gravity field is only two to three cm, the largest contributor to the high SLR residuals (10 cm) is the mismodelling of the non-conservative forces. The SLR residuals show a clear correlation with beta prime (solar elevation) angle, peaking in mid-August 1998 when the beta prime angle reached -80 to -90 degrees. We report in this paper on the analysis of the GFO tracking data (SLR, Doppler, and if available GPS) using GEODYN, and on the tuning of the non-conservative force model and the gravity model using these data.

Lemoine, Frank G.

Janus Trajectory Design

The proposed Janus Discovery Class mission will pass over opposite illuminated hemispheres of the planet Mercury on two successive flybys and will pass over a crater near Mercury's South geographic pole on the third and Final flyby. Three probes will be released by the main spacecraft prior to the first Mercury flyby to pass over Mercury's geographic poles and over the anti-Sunward side. The science team wanted to complete the first Mercury flyby within approximately 110 days of launch and the second Mercury flyby within approximately 365 days of launch. A direct trajectory was chosen which met the basic constraints of the science team while meeting the Discovery launch vehicle constraints. The objective of this paper is to serve as an overview of the Janus trajectory design. The proposal submitted in June 1998 provides a comprehensive overview of the Janus mission.

Marr, Gregory C.