Phasing the Webb Telescope

The James Webb Space Telescope (JWST) is a segmented deployable telescope, currently operating at L2. The telescope utilizes 6 degrees of freedom for adjustment of the Secondary Mirror (SM) and 7 degrees of freedom for adjustment of each of its 18 segments in the Primary Mirror (PM). After deployment, the PM segments and the SM arrived in their correct optical positions to within a ~1 mm, with accordingly large wavefront errors. A Wavefront Sensing and Controls (WFSC) process was executed to adjust each of these optical elements in order to correct the deployment errors and produce diffraction-limited images across the entire science field. This paper summarizes the application of the WFSC process.

JWST↗

The James Webb Space Telescope Mission Status

The James Webb Space Telescope (Webb) is a large, infrared space telescope that recently completed its on-orbit commissioning activities and will now embark on the first year of approved science. Its architecture includes many first-of-its-kind innovations for space, including a segmented primary mirror that is 6.6 m in diameter and a 5-layer sunshield used to passively cool the telescope and its four science instruments. Although Webb had an extensive test program, the system-level performance often relied on predictions based on integrated modeling, using conservative factors for the model uncertainties and primarily focusing on evaluating the performance requirements at end of life. A set of commissioning activities were designed for a system-level characterization of the performance. This proceeding will provide the status of the mission, including a discussion of the major events, on-orbit system performance, and early science highlights.

Michael McElwain↗

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg↗