Search NASA⌕ Search

Engineering topics

Martinez, Roland

Publications and source records attributed to Martinez, Roland.

Cislunar Near Rectilinear Halo Orbit for Human Space Exploration

In order to conduct sustained human exploration beyond Low Earth Orbit (LEO), spacecraft systems are designed to operate in a series of missions of increasing complexity. Regardless of the destination, Moon, Mars, asteroids or beyond, there is a substantial set of common objectives that must be met. Many orbit characterization studies have endeavored to evaluate the potential locations in cislunar space that are favorable for meeting common human exploration objectives in a stepwise approach. Multiple studies, by both NASA and other international space agencies, have indicated that Earth-­‐moon libration point orbits are attractive candidates for staging operations in the proving ground and beyond. In particular, the Near Rectilinear Orbit (NRO) has been demonstrated to meet multi-­‐mission and multi-­‐destination architectural constraints. However, a human mission to a selected NRO presents a variety of new challenges for mission planning. While a growing number of robotic missions have completed successful operations to various specific libration point orbits, human missions have never been conducted to orbits of this class. Human missions have unique challenges that differ significantly from robotic missions, including a lower tolerance for mission risk and additional operational constraints that are associated only with human spacecraft. In addition, neither robotic nor human missions have been operated in the NRO regime specifically, and NROs exhibit dynamical characteristics that can differ significantly as compared to other halo orbits. Finally, multi-­‐body orbits, such as libration point orbits, are identified to exist in a simplified orbit model known as the Circular Restricted Three Body Problem (CRTBP) and must then be re-­‐solved in the full ephemeris model. As a result, the behavior of multi-­‐body orbits cannot be effectively characterized within the classical two-­‐body orbit dynamics framework more familiar to the human spaceflight community. In fact, a given NRO is not identified by a set of Keplerian orbit parameters, and a valid epoch specific state vector must be first obtained from a multi-body dynamical model. In this paper, the significant performance and operational challenges of conducting human missions to the NRO are evaluated. First, a systematic process for generating full ephemeris based ballistic NROs of various families is outlined to demonstrate the relative ease in which a multi-­‐revolution orbit can be found for any epoch and for various orbit geometries. In the Earth-­‐Moon system, NROs, which are halo orbits with close passage over a lunar pole, can exist with respect to libration point 1 (L1) or libration point 2 (L2) and are either from a North or South family orbit class with respect to the ecliptic. Second, the ability to maintain the orbit over the lifetime of a habitat mission by applying a reliable station-keeping strategy is investigated. The NRO, while similar to the quasi-­‐halo orbits that the Artemis mission flew, requires an updated station keeping strategy. This is due to several dynamical differences such as the increased relative stability of the NRO compared to other halo orbits and the close passage over the lunar surface as shown in Figure 1. Multiple station-keeping strategies are being investigated to ensure a human spacecraft remains on a predictable path. As the NRO is not described in simple two-­‐body parameters, analysis must determine the best strategy for targeting a reference NRO as well as how closely a future state should be constrained. In addition, costs will be minimized by determining maneuver directionality based on an identified pattern in the optimal station-keeping solutions or an analytically derived relationship. The candidate station-keeping algorithm must be stable and robust to environmental and vehicle uncertainties as well to navigation estimation and flight control execution errors. To that end, navigation accuracies, the impact on the station-keeping execution errors as well as other vehicle uncertainties need to be assessed. Starting with Orion, current navigation accuracies are evaluated and then navigation requirements are derived assuming a desired station-keeping propellant budget. Third, the performance requirements to and from the NRO are evaluated. Important parameters for developing expected propellant costs include epoch of operation, size and type of NRO, Earth departure and return constraints, as well as abort or early-­‐return capability. Finally, rendezvous and proximity operations are vital aspects of multi-­‐mission human exploration endeavors. The ability to conduct rendezvous and the associated propellant costs are assessed as well as the impacts of various profile assumptions including the location within the NRO the rendezvous is performed. The results of these studies will influence plans for international cooperation on both nearer term proving ground missions and beyond.

Whitley, Ryan↗

Options for Staging Orbits in Cis-Lunar Space

NASA has been studying options to conduct missions beyond Low Earth Orbit, but within the Earth‐Moon system, in preparation for deep space exploration including human missions to Mars. Referred to as the Proving Ground, this arena of exploration activities will enable the development of human spaceflight systems and operations to satisfy future exploration objectives beyond the cis‐lunar environment. One option being considered includes the deployment of a habitable element or elements, which could be used as a central location for aggregation of supplies and resources for human missions in cis‐lunar space and beyond. Characterizing candidate orbit locations for this asset and the impacts on system design and mission operations is important in the overall assessment of the options being considered. The orbits described in this paper were initially selected by taking advantage of previous studies conducted by NASA and the work of other authors. In this paper orbits are assessed for their relative attractiveness based on various factors. A set of constraints related to the capability of the combined Orion and SLS system to deliver humans and cargo to and from the orbit are evaluated. Deployed assets intended to spend multiple years in the Proving Ground would ideally require minimal station keeping costs to reduce the mass budget allocated to this function. Additional mission design drivers include eclipse frequency, potential for uninterrupted communication with deployed assets, thermal, attitude control, communications, and other operational implications. Also the ability to support potential lunar surface activities and excursion missions beyond Earth‐Moon space is considered. The results of the characterization and evaluation of the selected orbits indicate a Near Rectilinear Orbit (NRO) is an attractive candidate as an aggregation point or staging location for operations. In this paper, the NRO is further described in terms which balance a number of key attributes that favor a variety of mission classes to meet multiple, sometimes competing, constraints.

Martinez, Roland↗

Options for Staging Orbits in Cis-Lunar Space

NASA has been studying options to conduct missions beyond Low Earth Orbit, but within the Earth-Moon system, in preparation for deep space exploration including human missions to Mars. Referred to as the Proving Ground, this arena of exploration activities will enable the development of human spaceflight systems and operations to satisfy future exploration objectives beyond the cis-lunar environment. One option being considered includes the deployment of a habitable element or elements, which could be used as a central location for aggregation of supplies and resources for human missions in cis-lunar space and beyond. Characterizing candidate orbit locations for this asset and the impacts on system design and mission operations is important in the overall assessment of the options being considered. The orbits described in this paper were initially selected by taking advantage of previous studies conducted by NASA and the work of other authors. In this paper orbits are assessed for their relative attractiveness based on various factors. First, a set of constraints related to the capability of the combined Orion and SLS system to deliver humans and cargo to and from the orbit are evaluated. Second, the ability to support potential lunar surface activities is considered. Finally, deployed assets intended to spend multiple years in the Proving Ground would ideally require minimal station keeping costs to reduce the mass budget allocated to this function. Additional mission design drivers include potential for uninterrupted communication with deployed assets, thermal, communications, and other operational implications. The results of the characterization and evaluation of the selected orbits indicate a Near Rectilinear Orbit (NRO) is an attractive candidate as an aggregation point or staging location for operations. In this paper, the NRO is further described in terms which balance a number of key attributes that favor a variety of mission classes to meet multiple, sometimes competing, constraints.

Whitley, Ryan↗

ISECG Global Exploration Roadmap: A Stepwise Approach to Deep Space Exploration

In 2011, ISECG released the Global Exploration Roadmap (GER), advancing the "Global Exploration Strategy: The Framework for Coordination" by articulating the perspectives of participating agencies on exploration goals and objectives, mission scenarios, and coordination of exploration preparatory activities. The GER featured a stepwise development and demonstration of capabilities ultimately required for human exploration of Mars. In 2013 the GER was updated to reflect the ongoing evolution of agency's exploration policies and plans, informed by individual agency and coordinated analysis activities that are relevant to various elements of the GER framework as well as coordinated stakeholder engagement activities. For this release of version 2 of the GER in the mid 2013 timeframe, a modified mission scenario is presented, more firmly reflecting the importance of a stepwise evolution of critical capabilities provided by multiple partners necessary for executing increasingly complex missions to multiple destinations and leading to human exploration of Mars. This paper will describe the updated mission scenario, the changes since the release of version 1, the mission themes incorporated into the scenario, and risk reduction for Mars missions provided by exploration at various destinations.

Martinez, Roland↗

Time and Energy, Exploring Trajectory Options Between Nodes in Earth-Moon Space

The Global Exploration Roadmap (GER) was released by the International Space Exploration Coordination Group (ISECG) in September of 2011. It describes mission scenarios that begin with the International Space Station and utilize it to demonstrate necessary technologies and capabilities prior to deployment of systems into Earth-Moon space. Deployment of these systems is an intermediate step in preparation for more complex deep space missions to near-Earth asteroids and eventually Mars. In one of the scenarios described in the GER, "Asteroid Next", there are activities that occur in Earth-Moon space at one of the Earth-Moon Lagrange (libration) points. In this regard, the authors examine the possible role of an intermediate staging point in an effort to illuminate potential trajectory options for conducting missions in Earth-Moon space of increasing duration, ultimately leading to deep space missions. This paper will describe several options for transits between Low Earth Orbit (LEO) and the libration points, transits between libration points, and transits between the libration points and interplanetary trajectories. The solution space provided will be constrained by selected orbital mechanics design techniques and physical characteristics of hardware to be used in both crewed missions and uncrewed missions. The relationships between time and energy required to transfer hardware between these locations will provide a better understanding of the potential trade-offs mission planners could consider in the development of capabilities, individual missions, and mission series in the context of the ISECG GER.

Martinez, Roland↗