Search NASA⌕ Search

Engineering topics

Maruta, T.

Publications and source records attributed to Maruta, T..

Acceleration of uranium beam to record power of 10.4 kW and observation of new isotopes at Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams (FRIB) is a major nuclear physics facility for research with fast, stopped, and reaccelerated beams that was successfully commissioned in May 2022. A key capability of FRIB is the production of an acceleration of the uranium beam, but this capability requires the facility to work at the design limits of the lowest charge-to-mass ratio and the highest power density on the beam intercepting devices. This paper presents techniques for overcoming the significant challenges in accelerating the uranium beam, culminating in the demonstration of 10.4 kW on target, and the discovery of three new isotopes. The high-power uranium beam enabled us to produce and identify G 88 a , A 93 s , and S 96 e , within the first 24 h of operation. The successful uranium operation at FRIB sets a new record for accelerated uranium beam power above 10 kW and opens a new avenue of research with rare isotopes. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Technological developments and accelerator improvements for the FRIB beam power ramp-up

The Facility for Rare Isotope Beams (FRIB) began operation with 1 kW beam power for scientific users in May 2022 upon completion of 8 years of project construction. The ramp-up to the ultimate beam power of 400 kW, planned over a 6-year period, will enable the facility to reach its full potential for scientific discovery in isotope science and applications. In December 2023, a record-high beam power of 10.4 kW uranium was delivered to the target. Technological developments and accelerator improvements are being made over the entire facility and are key to completion of the power ramp-up. Major technological developments entail the phased deployment of high-power beam-intercepting systems, including the charge strippers, the charge selection systems, the production target, and the beam dump, along with support systems, including non-conventional utilities (NCU) and remote handling facilities. Major accelerator improvements include renovations to aging legacy systems associated with experimental beam lines and system automation for improved operational efficiency and better machine availability. Experience must be gained to safely handle the increased radiological impacts associated with high beam power; extensive machine studies and advanced beam tuning procedures are needed to minimize uncontrolled beam losses for the desired operating conditions. This paper discusses the technological developments and accelerator improvements with emphasis on major R&D efforts.

43 PARTICLE ACCELERATORS↗

Accelerator commissioning and rare isotope identification at the Facility for Rare Isotope Beams

In 2008, Michigan State University was selected to establish the Facility for Rare Isotope Beams (FRIB). Construction of the FRIB accelerator was completed in January 2022. Phased accelerator commissioning with heavy ion beams started in 2017 with the normal-conducting ion source and radio-frequency quadrupole. In April 2021, the full FRIB driver linear accelerator (linac) was commissioned, with heavy ion beams accelerated to energies above 200 MeV/nucleon by 324 superconducting radiofrequency (SRF) resonators operating at 2 K and 4 K with liquid-helium cooling. Further, in preparation for high-power operation, a liquid lithium charge stripper was commissioned with heavy ion beams up to uranium-238, followed by the simultaneous acceleration of multiple-charge-state heavy ion beams to energies above 200 MeV/nucleon. In December 2021, selenium-84 was produced with the FRIB target using a krypton-86 primary beam, demonstrating FRIB’s capability for scientific discovery.

07 ISOTOPE AND RADIATION SOURCES↗

Spectroscopy of A=9 hyperlithium with the $(e,e^{\prime}K^{+})$ reaction

Missing mass spectroscopy with the $(e,e^{\prime}K^{+})$ reaction was performed at JLab Hall C for the neutron rich $\Lambda$ hypernucleus $^{9}_{\Lambda}{\rm Li}$. The ground state energy was obtained to be $B_{\Lambda}^{\rm g.s.}=8.84\pm0.17^{\rm stat.}\pm0.15^{\rm sys.}~{\rm MeV}$ by using shell model calculations of a cross section ratio and an energy separation of the spin doublet states ($3/2^{+}_1$ and $5/2^{+}_1$). In addition, peaks that are considered to be states of [$^{8}{\rm Li}(3^{+})\otimes s_{\Lambda}=3/2^{+}_{2}, 1/2^{+}$] and [$^{8}{\rm Li}(1^{+})\otimes s_{\Lambda}=5/2^{+}_{2}, 7/2^{+}$] were observed at $E_{\Lambda}(\#2)=1.74\pm0.27^{\rm stat.}\pm0.11^{\rm sys.}~{\rm MeV}$ and $E_{\Lambda}(\#3)=3.30\pm0.24^{\rm stat.}\pm0.11^{\rm sys.}~{\rm MeV}$, respectively. The $E_{\Lambda}(\#3)$ is larger than shell model predictions by a few hundred keV, and the difference would indicate that a ${\rm ^{5}He}+t$ structure is more developed for the $3^{+}$ state than those for the $2^{+}$ and $1^{+}$ states in a core nucleus $^{8}{\rm Li}$ as a cluster model calculation suggests.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

First Simultaneous Acceleration of Multiple Charge States of Heavy Ion Beams in a Large-Scale Superconducting Linear Accelerator

Experimental studies of the simultaneous acceleration of three-charge-state 129 Xe 49+,50+,51+ beam from 17 to 180 MeV/nucleon in a superconducting linear accelerator are presented. The beam parameters for each individual- and multiple-charge-state beam were measured and compared with the particle tracking simulations. Detailed measurements were performed to characterize the multiple-charge-state beam’s recombination after a second-order achromat and isopath 180° bending system. As a result of the recombination of three charge states in the six-dimensional phase space, the xenon beam intensity was increased by 2.5-fold compared to the single-charge-state beam. Lastly, the results presented in the Letter fully validate the possibility to produce and utilize high-quality multiple-charge-state heavy-ion beams in a large-scale superconducting linac to increase the available beam power on an isotope production target.

43 PARTICLE ACCELERATORS↗

Heavy ion beam physics at Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams (FRIB) will be the world's premier rare-isotope beam facility. Experiments with the majority (~80%) of the isotope predicted to exist will become available. The FRIB facility is based on a superconducting (SC) heavy ion linac with output energy above 200 MeV/u for any ions at beam power of 400 kW. FRIB includes a target facility for in-flight production of rare isotopes. A three-stage fragment separator will be used to prepare fast rare isotope beams with high-purity for nuclear physics experiments. The installation work of the accelerator and experimental systems is approaching completion and multi-stage beam commissioning activities started in summer 2017 with expected project completion in early 2022. In conclusion, the commencement of operation for users' experiments is planned immediately following the project completion.

43 PARTICLE ACCELERATORS↗

Commissioning Status of the Linac for the Facility for Rare Isotope Beams

The Facility for Rare Isotope Beams will be completed in late 2021. Here, we report here on the current efforts to commission the first stages of the 200-MeV/u superconducting, continuous wave heavy-ion linac. The statuses of the cryogenic plant and its distribution system, the accelerator cryomodule commissioning and operations, the ion source and front end transport development, the radio-frequency quadrupole commissioning, and then beam dynamics development to support high-power operation are reviewed. Plans for commissioning the remainder of the linac systems are presented.

43 PARTICLE ACCELERATORS↗

Proton form factor ratio μ p G E p / G M p from double spin asymmetry

We report the ratio of the electric and magnetic form factor of the proton, $\mu_p G_E^p/G_M^p$, has been measured for elastic electron-proton scattering with polarized beam and target up to four-momentum transfer squared, $Q^2=5.66$ (GeV/c)$^2$ using the double spin asymmetry for target spin orientation aligned nearly perpendicular to the beam momentum direction. This measurement of $\mu_p G_E^p/G_M^p$ agrees with the $Q^2$ dependence of previous recoil polarization data and reconfirms the discrepancy at high $Q^2$ between the Rosenbluth and the polarization-transfer method with a different measurement technique and systematic uncertainties uncorrelated to those of the recoil-polarization measurements. The form factor ratio at $Q^2$=2.06 (GeV/c)$^2$ has been measured as $\mu_p G_E^p/G_M^p = 0.720 \pm 0.176_{stat} \pm 0.039_{sys}$, which is in agreement with an earlier measurement with the polarized target technique at similar kinematics. The form factor ratio at $Q^2$=5.66 (GeV/c)$^2$ has been determined as $\mu_p G_E^p/G_M^p=0.244\pm0.353_{stat}\pm0.013_{sys}$, which represents the highest $Q^2$ reach with the double spin asymmetry with polarized target to date.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗