Search NASA⌕ Search

Engineering topics

Matalevich, J.

Publications and source records attributed to Matalevich, J..

Design and Prototyping of the Electron Ion Collider Electron Storage Ring 591 MHz Elliptical SRF Cavity

The Electron Ion Collider (EIC) is a new nuclear phys-ics research facility to be constructed at Brookhaven Lab (BNL). It consists a few accelerator complexes, each re-quires some different SRF and RF systems. Among them, the electron storage ring?s (ESR) 591 MHz fundamental RF system is one of the most challenging. This 17 cavi-ties system will handle a variable beam current of up to 2.5 A, and replenish up to 10 MW of beam power losses from both synchrotron radiation (SR) and high-order modes (HOM). In this paper, we will report the progress and findings of the ongoing design and prototyping of this cavity.

Guo, J.↗

Cavity and Cryomodule Developements for EIC

The EIC is a major new project under construction at BNL in partnership with JLab. It relies upon a number of new SRF cavities at 197 MHz, 394 MHz, 591 MHz and 1773 MHz to pre-bunch, accelerate, cool and crab the stored beams. R&D is focusing on the 591 MHz elliptical cavity and 197 MHz crab cavity first as these are the most challenging. Preliminary designs of these cavities are presented along with an R&D status report. To avoid developing multiple different cryostats a modular approach is adopted using a high degree of commonality of parts and systems. This approach may be easily adapted to other frequencies and applications.

Rimmer, R.A.↗

Design of the Electron Ion Collider Electron Storage Ring SRF cavity

The Electron Ion Collider (EIC) under construction at Brookhaven National Laboratory is a high luminosity collider as the next major research facility for the nuclear physics community. Among the numerous RF subsystems in the EIC, the electron storage ring (ESR) fundamental RF cavities system is one of the most challenging. This system will handle a high beam current of up to 2.5A and replenish up to 10MW of beam power losses from synchrotron radiation and HOM. Variable coupling is required in the cavities due to the wide range of required total RF voltage and beam current combinations. In this paper, we will present the status of the design and future plans.

Guo, J.↗

The CLAS12 superconducting magnets

As part of the Jefferson Lab 12 GeV upgrade, the Hall B CLAS12 system requires two superconducting iron-free magnets — a torus and a solenoid. The physics requirements to maximize space for the detectors guided engineers toward particular coil designs for each of the magnets which, in turn, led to the choice of using conduction cooling. The torus consists of 6 trapezoidal NbTi coils connected in series with an operating current of 3770 A. The solenoid is an actively shielded 5 T magnet consisting of 5 NbTi coils connected in series operating at 2416 A. Within the hall, the two magnets are located in close proximity to each other and are completely covered both inside and outside by particle detectors. Stringent size limitations were imposed for both magnets and introduced particular design and fabrication challenges. This paper describes the design, construction, installation, commissioning, and operation of the two magnets.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗