CFD Validation of a Hypersonic Cone-Slice-Flap Configuration
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Matthew Rhode.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This slide package describes the project currently evaluating the ability of CFD to take on the role of the Langley Unitary Plan Wind Tunnel should the wind tunnel be demolished as currently planned in 2022.
Model validation is the process of determining the degree of accuracy between physical reality and the model. The result of model validation can either be used to improve the model through calibration or quantify the model-form uncertainty. This work focuses on providing the model-form uncertainty through an area metric for a hypersonic cone-slice-flap variable geometry configuration given uncertainty in both the simulation and experimental data. For a variable geometry, performing uncertainty quantification to capture the model-form uncertainty on every configuration is computationally challenging. This work lays out a procedure that can give an accurate representation of the model-form uncertainty using a small number of high-fidelity runs and many low-fidelity runs on multiple configurations. Running this comparison provides a quantifiable measurement for the accuracy of each turbulence model for this type of design. The high-fidelity CFD solver used was VULCAN-CFD and the low-fidelity results came from Cart3D. The experimental data came from the 20-Inch Mach 6 Tunnel located at NASA Langley Research Center. The present work showed that the turbulence simulation overpredicted the drag and lift coefficient, while underpredicting the pitching moment coefficient. The model-form uncertainty estimate resulted up to a 13.6% change in the total uncertainty for the drag coefficient, up to a 57.4% change in total uncertainty for the lift coefficient, and up to a 100% change in total uncertainty for the pitching moment coefficient.