Process Design and Techno-Economic Analysis of the Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Biomass

This work describes the process design and techno-economic analysis (TEA) of the modular SPOC power plant for biomass firing and coal-biomass co-firing. Two Rankine cycles were considered: a supercritical steam cycle (242 bar, 593°C, 593°C) with 550 MWe net output and a subcritical cycle (166 bar, 566°C, 566°C) with 200 MWe net output. For both cases, 95% carbon capture was modeled, and hybrid poplar biomass was chosen to generate carbon-negative power. In addition, the supercritical 500 MWe case included a 25% biomass co-firing (carbon neutral) case. For both cycles, a 100% Powder River Basin coal firing case was used for comparison purposes. In the SPOC process, oxygen is produced via a cryogenic air separation unit (ASU) and the heat generated from the compression of air is integrated into the steam cycle and utilized for boiler feed water pre-heating. Unique to the SPOC process, the boilers are pressurized and arranged in a series-parallel configuration, with minimized flue gas recirculation. The flue gas is cooled and scrubbed in the direct-contact cooler (DCC) column, and the moisture in the flue gas is condensed, leaving the bottom of the DCC at a sufficiently high temperature such that it can be used for boiler feed water pre-heating, improving plant thermal efficiency. Following drying and purification, CO2 in the flue gas is at the purity required for storage or utilization. The performance data were obtained from process modelling via Aspen Plus®. The stream data from Aspen Plus® were used as an input for the AACE Class 5 cost study. Ultimately, the capital costs, Levelized Cost of Electricity (LCOE), and cost of CO2 captured and avoided were obtained. The HHV efficiency of the carbon negative 550 MWe supercritical SPOC case (34.8%) was clearly above those reported by NETL for the BECCS baseline cases of supercritical pulverized coal with capture (B12B, 31.5%) and the 49% biomass co-firing case with capture (PA3, 29.2%). The HHV efficiency of the carbon-negative subcritical plant is also higher than the subcritical baseline PC plant with capture (case B11B.95) presented by NETL (32% vs 29.7%). The LCOE for the SPOC 100% biomass case was similar to the LCOE for the BECCS 49% biomass with carbon capture case ($147/MWh), and the SPOC carbon neutral case LCOE was lower ($110/MWh) than the cost for the NETL baseline SC coal firing case with 90% carbon capture ($114/MWh).

Magalhaes, Duarte↗

Sand Thermal Energy Storage Pilot Design (Final Report)

This report summarizes work done on developing a 10-MWhe pilot of the sand-based thermal energy storage (SandTES) technology at Alabama Power’s Plant Gaston Unit 5, an operating, supercritical coal power unit. The system will be integrated to the unit, obtaining steam to heat the sand through an air-blown fluidized-bed heat exchanger, then storing the water to be reused during discharging to produce steam that will then be vented. An electrical particle heater will also be included to provide part of the heat to the sand to provide data and learnings for commercial systems that will be fully electrically heated. Hot sand is contained in one bunker, while cold sand is housed in the other bunker, and standard solids handling equipment moves the sand around. This pilot would advance the SandTES technology to Technology Readiness Level 6 and position it for commercial readiness by 2030. This work was done in two phases: Phase I performed a conceptual study that provided Association for the Advancement of Cost Engineering (AACE) Class 5 costs and estimated performance, and then Phase II, which also involved a design update, performed a more detailed pre-front-end engineering and design study that elicited AACE Class 4 costs. Work was also done to provide estimated costs for commercial applications of the technology, assess its gaps, create its technology maturation and commercialization plans, and finally perform an Environmental Information Volume for the pilot site as a first step in the National Environmental Policy Act process.

20 FOSSIL-FUELED POWER PLANTS↗

Process Design and Techno-Economic Analysis of the Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Biomass

This work describes the process design and techno-economic analysis (TEA) of the modular stage pressurized oxy-combustion (SPOC) power plant for biomass firing and coal-biomass co-firing. The SPOC process was modelled using Aspen Plus®, and largely based on a previous model designed by this group for SPOC coal firing. To enable comparison with current National Energy Technology Laboratory (NETL) Bio-Energy Carbon Capture and Storage (BECCS) studies, a 550 MWe SPOC power plant with a supercritical Rankine cycle (241 bar, 593°C, and 593°C), and 90% carbon capture was modeled, and hybrid poplar biomass was chosen. Two cases were evaluated, namely 100% biomass (carbon negative) and 25% biomass co-firing (carbon neutral), and the 100% Powder River Basin coal firing case was chosen for comparison purposes. In the SPOC process, oxygen is produced via a cryogenic air separation unit (ASU) and the heat generated from the compression of air is integrated into the steam cycle and utilized for boiler feed water regeneration. Unique to the SPOC process, the boilers are arranged in a series-parallel configuration, with minimized flue gas recirculation. The flue gas is cooled and scrubbed in the direct-contact cooler (DCC) column, and the water leaving the bottom of the DCC is at a sufficiently high temperature that it can be used for boiler feed water heating, improving plant thermal efficiency. The SPOC efficiencies were above the BECCS cases with capture, and no efficiency penalty on the SPOC plant was observed with an increase of biomass in the mix mostly due to the higher oxygen content in biomass that resulted in lower oxygen requirement from the ASU, and the higher moisture in biomass that due to the key benefit of the SPOC process can be partially recovered as latent heat.

Magalhaes, Duarte↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗