Search NASA⌕ Search

Engineering topics

Mazzeo, Arthur

Publications and source records attributed to Mazzeo, Arthur.

Design and Engineering of LUPIN: A Test-Bed Radiofrequency Ion Source for Enhanced Neutral Beam Injection on DIII-D

The Large, Uniform Plasma for Ionizing Neutrals (LUPIN) is an RF inductively coupled plasma (ICP) chamber for demonstrating plasma performance of an RF ICP positive ion source upgrade for the DIII-D Neutral Beam Injection (NBI) system. LUPIN will be used to investigate ion source physics, including neutral gas dynamics, plasma density uniformity, interactions with Faraday shields, and power coupling to novel RF antenna designs. LUPIN has an RF generator capable of delivering 20 kW of power at 2 MHz, which is coupled into a cylindrical quartz vessel measuring 20 cm in length and 10 cm in radius. This configuration matches the power density requirements for a full-scale ion source. Target hydrogen and deuterium plasma densities exceeding 10 18 m -3 would relate to extracted ion current densities of 2100 A/m 2 for 10 s. Vacuum conductance and gas flow calculations predict a maximum achievable neutral gas flow rate of 1675 Pa·L/s at 5 Pa of He, which mimics the gas flow of the DIII-D NBI system. Designs have been developed for an internal Faraday shield to mitigate heat flux and ion sputtering on the dielectric vessel. Thermomechanical finite element simulations demonstrated the Faraday shield design to be capable of withstanding anticipated heat loads from worst-case operation scenarios. Results of upcoming experimental investigations on LUPIN will guide the design of a full-scale prototype for DIII-D integration.

Faraday shield↗

DIII-D Electron Cyclotron Heating and Current Drive System Status and Plans

The DIII-D 110 GHz Electron Cyclotron Heating and Current Drive (ECH/ECCD) System supports a wide range of experiments at the DIII-D National Fusion Facility and is pioneering innovative new techniques for future fusion reactors. Here, the system currently includes 8 sockets with 4 installed gyrotrons, 31.75 mm circular corrugated transmission lines, four dual real time steerable launchers plus two Top Launchers. After the successful testing of the first Top Launcher, that injects the EC waves downward nearly parallel to the resonance layer with double current drive efficiency and a long absorption path, a second new Top Launcher was designed and installed with an upgraded design. Some of the operational limitations encountered for the 110 GHz X-mode second harmonic resonance scenario launched in over-dense plasmas were overcome with the alternative use of O-mode second harmonic launch. Two new gyrotrons in a new series manufactured by CPI were installed and tested, bringing up the total installed power to 3 MW. The installation of repaired and new gyrotrons will increase the number of installed gyrotrons to 7 in 2023. An addition to the DIII-D building will be completed in early 2022 to provide the space to expand the ECH/ECCD system to ten gyrotron systems, plus an extra gyrotron test socket.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗