Search NASA⌕ Search

Engineering topics

McCoy, M.

Publications and source records attributed to McCoy, M..

Potential Ideas for an El Capitan Center of Excellence (COE) Around Intelligent Simulation

Proposing a Center of Excellence under the CORAL-2 NRE is a mandatory requirement. The current Sierra COE (CORAL-1) is largely focused on helping LLNL applications make the disruptive transition to a heterogeneous GPU-based system by 2018. We expect a continuation of COE activities around optimizing our broad and diverse application base (of so-called “traditional” simulation codes) optimized for the El Capitan architecture, as well as supporting the underlying software stack (compilers, tools, programming models, etc.) – but do not expect this to require as much effort in the El Capitan COE (assuming a heterogeneous node architecture). What follows are some thoughts on 3 potential topics of interest for an El Capitan COE at LLNL – largely focused around AI and machine learning and the concept of advancing our goal of intelligent simulation or cognitive computing in the timeframe of deployment and production use of El Capitan (2023-2038). We believe vendor engagement through a COE in this area will provide a natural point-of-interest between LLNL and our vendor partner for common advancement of machine learning capabilities focused on scientific data – potentially greatly broadening the ecosystem around HPC architectures and the supporting software stack for scientific simulation-based AI.

97 MATHEMATICS AND COMPUTING↗

Advanced Simulation and Computing Fiscal Year 2016 Implementation Plan, Version 0

The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The purpose of this IP is to outline key work requirements to be performed and to control individual work activities within the scope of work. Contractors may not deviate from this plan without a revised WA or subsequent IP.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗