Impact of Wind Power on the Unit Commitment, Operating Reserves, and Market Design
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Meibom, Peter.
Explore the source record for details and available documents.
Large scale wind power production and its variability is one of the major inputs to wind integration studies. This paper analyses measured data from large scale wind power production. Comparisons of variability are made across several variables: time scale (10-60 minute ramp rates), number of wind farms, and simulated vs. modeled data. Ramp rates for Wind power production, Load (total system load) and Net load (load minus wind power production) demonstrate how wind power increases the net load variability. Wind power will also change the timing of daily ramps.
With increasing penetrations of wind power on the eastern interconnection of the United States, much research has been discussed on how the increased uncertainty may change how the system is operated. In particular, unit commitment programs which decide what units need to be started up in order to meet the changing demand at least cost may need to have modifications in order to reduce costs and improve reliability on a power system with increasing uncertain variables. This paper outlines a study undertaken for the U.S. Eastern Interconnection in which different advanced unit commitment strategies were simulated for three different years to evaluate the benefits that may occur from using these strategies as an operational tool.
No abstract prepared.