Search NASA⌕ Search

Engineering topics

Meng, W.

Publications and source records attributed to Meng, W..

At least 19 records

Measurement of the Spin Tune Using the Coherent Spin Motion of Polarized Protons in a Storage Ring

This Letter reports the first spin tune measurement at high energies (24 and 255 GeV) with a driven coherent spin motion. To maintain polarization in a polarized proton collider, it is essential to know the spin tune of the polarized proton beam, which is defined as the number of full spin precessions per revolution. A nine-magnet spin flipper has demonstrated high spin-flip efficiency in the presence of two Siberian snakes. The spin flipper drives a spin resonance with a given frequency (or tune) and strength. When the drive tune is close to the spin tune, the proton spin direction is not vertical anymore, but precesses around the vertical direction. By calculating the precession frequency of the horizontal component, the spin tune can be precisely measured. A driven coherent spin motion and fast turn-by-turn polarization measurement are keys to the measurement. The vertical spin direction is restored after turning the spin flipper off and the polarization value is not affected by the measurement. In conclusion, the fact that this manipulation preserves the polarization makes it possible to measure the spin tune during the operation of a high energy accelerator.

43 PARTICLE ACCELERATORS↗

Time and Laser Ranging: A Window of Opportunity for Geodesy, Navigation, and Meteorology

Recent progress in the domain of time and frequency (T/F) standards requires important improvements in existing timedistribution links, in term of accuracy in particular. Satellite Laser Ranging (SLR) has proven to be a fundamental tool,offering a straightforward, conceptually simple, highly accurate, and unambiguous observable. Several time transfers by laserlink projects have been carried out over the past 10 years with numerous scientific and metrological objectives. Depending on the mission, SLR is used to transmit time over two-way or one-way distances from 500 to several millions of kilometers.The following missions and their objectives employed this technique: European Laser Timing (ELT, expected in 2020) at 450 km, Time Transfer by Laser Link (T2L2) at 1336 km, Laser Time Transfer at 36,000 km, Lunar Reconnaissance Orbiter at 350,000 km, and MErcury Surface, Space ENvironment, GEochemistry, and Ranging at tens of million km. This article describes the synergy between SLR and T/F technologies developed on the ground and in space and as well as the state of the art of their exploitation. The performance and sources of limitation of such space missions are analyzed. It shows that currentand future challenges lie in the improvement in the time accuracy and stability of the time for ground geodetic observatories.The role of the next generation of SLR systems is emphasized both in space and at ground level, from the point of view of Global Geodetic Observing System and valuable exploitation of the synergy between time synchronization, ranging, and data transfer.

Laser ranging↗

High spin flip efficiency at 255GeV for polarized protons in a ring with two full Siberian Snakes

In polarized proton collision experiments, it is highly advantageous to flip the spin of each bunch of protons during the stores to reduce the systematic errors . Experiments done at energies less than 2GeV have demonstrated a spin flip efficiency over 99%. At high energy colliders with Siberian Snakes, a single magnet spin flipper does not work because of t he large spin tune spread and the generation of multiple, overlapping resonances. A more sophisticated spin flipper, constructed of 9-dipole magnets was used to flip the spin in Relativistic Heavy Ion Collider(RHIC). Special optics choice was also used to make the spin tune spread very small. A 97% spin flip efficiency was measured both at 24GeV and 255GeV. Lastly, these results show that efficient spin flipping can be achieved at high energies using a 9-magnet spin flipper.

43 PARTICLE ACCELERATORS↗

A Storage Ring Experiment to Detect a Proton Electric Dipole Moment

A new experiment is described to detect a permanent electric dipole moment of the proton with a sensitivity of 10−29 e ⋅ cm by using polarized “magic” momentum 0.7 GeV/c protons in an all-electric storage ring. Systematic errors relevant to the experiment are discussed and techniques to address them are presented. The measurement is sensitive to new physics beyond the standard model at the scale of 3000 TeV.

43 PARTICLE ACCELERATORS↗

Physical design of magnetic shielding for LEReC cooling section

The goal of this note is to set basic parameters for the magnetic shielding of LEReC CS with required design attenuation. We considered physical design of magnetic shielding of LEReC cooling section. The schematic of this design along with the list of its basic parameters is shown. We are planning to use 2 layers of 1 mm thick cylindrical mu-metal shields with μ=11000. The radius of the first layer sitting on top of vacuum chamber is 63.5 mm. The second layer radius is 150 mm. Such shielding guarantees adequate transverse angles of electron beam trajectory in the CS.

43 PARTICLE ACCELERATORS↗

Plasma sputtering robotic device for in-situ thick coatings of long, small diameter vacuum tubes

A novel robotic plasma magnetron mole with a 50 cm long cathode was designed, fabricated, and operated. The reason for this endeavor is to alleviate the problems of unacceptable resistive heating of stainless steel vacuum tubes in the BNL Relativistic Heavy Ion Collider (RHIC). The magnetron mole was successfully operated to copper coat an assembly containing a full-size, stainless steel, cold bore, RHIC magnet tubing connected to two types of RHIC bellows, to which two additional pipes made of RHIC tubing were connected. To increase the cathode lifetime, a movable magnet package was developed, and the thickest possible cathode was made, with a rather challenging target to substrate (de facto anode) distance of less than 1.5 cm. Achieving reliable steady state magnetron discharges at such a short cathode to anode gap was rather challenging, when compared to commercial coating equipment, where the target to substrate distance is 10's cm; 6.3 cm is the lowest experimental target to substrate distance found in the literature. Additionally, the magnetron developed during this project provides unique omni-directional uniform coating. The magnetron is mounted on a carriage with spring loaded wheels that successfully crossed bellows and adjusted for variations in vacuum tube diameter, while keeping the magnetron centered. Electrical power and cooling water were fed through a cable bundle. The umbilical cabling system is driven by a motorized spool. Excellent coating adhesion was achieved. Measurements indicated that well-scrubbed copper coating reduced secondary electron yield to 1, i.e., the problem of electron clouds can be eliminated. Room temperature RF resistivity measurement indicated that a 10 μm copper coated stainless steel RHIC tube has a conductivity close to that of pure copper tubing. Excellent coating adhesion was achieved. The device details and experimental results are described.

36 MATERIALS SCIENCE↗

Design and test of the RHIC CMD10 abort kicker

In recent RHIC operational runs, planned and unplanned pre-fire triggered beam aborts have been observed that resulted in quenches of SC main ring magnets, indicating a weakened magnet kick strength due to beam-induced ferrite heating. An improvement program was initiated to reduce the longitudinal coupling impedance with changes to the ferrite material and the eddy-current strip geometry. Results of the impedance measurements and of magnet heating tests with CMD10 ferrite up to 190°C are reported. All 10 abort kickers in the tunnel have been modified and were provided with a cooling system for the RUN 15.

43 PARTICLE ACCELERATORS↗

The progress of funnelling gun high voltage condition and beam test

A prototype of a high average current polarized electron funneling gun as an eRHIC injector has been built at BNL. The gun was assembled and tested at Stangenes Incorporated. Two beams were generated from two GaAs photocathodes and combined by a switched combiner field. We observed the combined beams on a YAG crystal and measured the photocurrent by a Faraday cup. The gun has been shipped to Stony Brook University and is being tested there. In this paper we will describe the major components of the gun and recent beam test results. High voltage conditioning is discussed as well.

43 PARTICLE ACCELERATORS↗

Cathode performance during two beam operation of the high current high polarization electron gun for eRHIC

Two electron beams from two activated bulk GaAs photocathodes were successfully combined during the recent beam test of the High Current High Polarization Electron gun for eRHIC. The beam test took place in Stangenes Industries in Palo Alto, CA, where the cathodes were placed in diagonally opposite locations inside the high voltage shroud. No significant cross talking between the cathodes was found for the pertinent vacuum and low average current operation, which is very promising towards combining multiple beams for higher average current. This paper describes the cathode preparation, transport and cathode performance in the gun for the combining test, including the QE and lifetimes of the photocathodes at various steps of the experiment.

43 PARTICLE ACCELERATORS↗

A white paper: The Cornell-BNL FFAG-ERL Test Accelerator

This white paper describes a project that promises to propel high-power, high-brightness electron beam science and applications to an exciting new level. The collaborative effort between Brookhaven and Cornell will be a model for future projects between universities and national lab, taking advantage of the expertise and resources of both to investigate new topics in a timely and cost-effective manner.

43 PARTICLE ACCELERATORS↗

Comparison of the Window-Frame RHIC-abort kicker with C-type Kicker

The high intensity proton bunches (~2.5x10 11 p/bunch ) circulating in RHIC increase the temperature of the ferrite-made RHIC-abort-kickers above the Curie point; as a result, the kickers cannot provide the required field to abort the beam at the beam dump. A team of experts in the CAD department worked on modifying the design of the window-frame RHIC-abort kicker to minimize the hysteresis losses responsible for the increase of the ferrite’s temperature. In this technical note we report some results from the study of two possible modifications of the window-frame RHIC-abort kicker, and we compare these results with those of a propose C-type RHIC-abort kicker. We also include an Appendix where we describe a method which may further reduce the hysteresis losses of the window-frame kicker.

43 PARTICLE ACCELERATORS↗